Category:10 CFR 36
Jump to navigation
Jump to search
Pages in category "10 CFR 36"
The following 34 pages are in this category, out of 34 total.
1
- 10 CFR 36.1, Purpose and Scope
- 10 CFR 36.11, Application for a Specific License
- 10 CFR 36.13, Specific Licenses for Irradiators
- 10 CFR 36.15, Commencement of Construction
- 10 CFR 36.17, Applications for Exemptions
- 10 CFR 36.19, Request for Written Statements
- 10 CFR 36.2, Definitions
- 10 CFR 36.21, Performance Criteria for Sealed Sources
- 10 CFR 36.23, Access Control
- 10 CFR 36.25, Shielding
- 10 CFR 36.27, Fire Protection
- 10 CFR 36.29, Radiation Monitors
- 10 CFR 36.31, Control of Source Movement
- 10 CFR 36.33, Irradiator Pools
- 10 CFR 36.35, Source Rack Protection
- 10 CFR 36.37, Power Failures
- 10 CFR 36.39, Design Requirements
- 10 CFR 36.41, Construction Monitoring and Acceptance Testing
- 10 CFR 36.5, Interpretations
- 10 CFR 36.51, Training
- 10 CFR 36.53, Operating and Emergency Procedures
- 10 CFR 36.55, Personnel Monitoring
- 10 CFR 36.57, Radiation Surveys
- 10 CFR 36.59, Detection of Leaking Sources
- 10 CFR 36.61, Inspection and Maintenance
- 10 CFR 36.63, Pool Water Purity
- 10 CFR 36.65, Attendance During Operation
- 10 CFR 36.67, Entering and Leaving the Radiation Room
- 10 CFR 36.69, Irradiation of Explosive Or Flammable Materials
- 10 CFR 36.8, Information Collection Requirements: Omb Approval
- 10 CFR 36.81, Records and Retention Periods
- 10 CFR 36.83, Reports
- 10 CFR 36.91, Violations
- 10 CFR 36.93, Criminal Penalties