MONTHYEARCY-12-039, Submittal of Request for Exemption to Revised Emergency Planning Rule2012-06-20020 June 2012 Submittal of Request for Exemption to Revised Emergency Planning Rule Project stage: Request ML12228A6402012-08-10010 August 2012 Ltr to J. Lenois, Connecticut Yankee Atomic Power Co, Request for Exemption from Specific Requirements of 10 CFR Part 50, Amended Emergency Planning Rule - Accepted for Review (TAC L24663) (Dockets 50-213, 72-39) Project stage: Approval ML13064A3742013-03-18018 March 2013 Ltr to B. Buerger Response to Exemption Request for Portions of Title 10 of the Code of Federal Regulations Part 50 Appendix E, and Title 10 of the Code of Federal Regulations Part 50.47 for the Haddam Neck Plant (TAC No. L24663) Project stage: Other ML13080A2382013-03-19019 March 2013 Ltr to W. Norton Applicability of the Emergency Preparedness Final Rule to the Maine Yankee Atomic Power Co., Connecticut Yankee Atomic Power Co., and Yankee Atomic Electric Company Independent Spent Fuel Storage Installation Project stage: Other ML13228A0262013-08-15015 August 2013 Letter to B. Buerger Revised Response to Exemption Request for Portions of Title 10 of the Code of Federal Regulations Part 50 Appendix E, and Title 10 of the Code of Federal Regulations Part 50.47 for the Haddam Neck Plant (TAC L24663) Project stage: Other 2013-03-18
[Table View] |
|
---|
Category:Emergency Preparedness-Emergency Plan
[Table view] Category:Letter type:CY
MONTHYEARCY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-010, Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2)2023-04-24024 April 2023 Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-17-021, Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager2017-09-0505 September 2017 Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-005, Independent Spent Fuel Storage Installation - Property Insurance Coverage2017-02-28028 February 2017 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-17-004, ISFSI - Nuclear Liability Insurance Coverage2017-02-28028 February 2017 ISFSI - Nuclear Liability Insurance Coverage CY-17-007, Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-17-001, ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7)2017-01-0505 January 2017 ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7) CY-17-002, Independent Spent Fuel Storage Installation2017-01-0505 January 2017 Independent Spent Fuel Storage Installation CY-17-003, ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/20162017-01-0505 January 2017 ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/2016 CY-16-035, Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager2016-12-15015 December 2016 Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-004, Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage2016-02-29029 February 2016 Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage CY-16-006, ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status2016-02-0202 February 2016 ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-035, Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report2015-12-0101 December 2015 Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report CY-15-043, ISFSI - Revision 13 to the Emergency Plan2015-12-0101 December 2015 ISFSI - Revision 13 to the Emergency Plan 2023-04-24
[Table view] |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
The NRC issued a Final Rule promulgating Enhancements to Emergency Preparedness Regulations in the Federal Register on November 23, 2011 (Reference 1). Pursuant to the Final Rule, licensees are permitted to defer implementation of the final rule until June 20, 2012 with some exceptions. The final rule was described in the Federal Register in terms of six security related emergency planning (EP) issues and six non-security related EP issues. These are identified below:
A. Security-Related EP Issues
- 1. On-Shift Staffing Analysis
- 2. Emergency Action Levels for Hostile Action
- 3. Emergency Response Organization Augmentation and Alternative Facilities
- 4. Licensee Coordination with Offsite Response Organizations During Hostile Actions
- 5. Protection for Onsite Personnel
- 6. Challenging Drills and Exercises B. Non-Security Related EP Issues
- 1. Backup Means for Alert and Notification Systems A,-iqS
- 2. Emergency Declaration Timeliness
Document Control Center CY-1 2-039 / Page 2
- 3. Emergency Operations Facility - Performance Based Approach
- 4. Evacuation Time Estimate Updating
- 5. Amended Emergency Plan Change Process
- 6. Removal of Completed One-Time Requirements This discussion in the Federal Register refers to the applicability of some of these new or changed requirements to "nuclear power reactor licensees." Other aspects of the rule are discussed with regard to applicability to "non-power reactor licensees." The issues identified above which apply only to "nuclear power reactor licensees" are: A.1 through A.5, portions of A.6, and B.1 through B.4. 10CFR 50.4 define the terms: "nuclear reactor" and "non-power reactor."
Neither of these definitions characterize licensees that have submitted certifications to permanently cease operations and permanently remove fuel from the reactor, pursuant to 10 CFR 50.82(a), such as CYAPCO. Therefore, while CYAPCO holds an operating license, that license no longer authorizes operation of the reactor and thus it could be argued that the new or changed rules described in the subject rulemaking are not applicable to the former CYAPCO power plant site, because of its 50.82 certification submission.
Furthermore, the Federal Register notice references a completed backfit analysis for the final rule. This Backfit Analysis, dated September 1, 2010 (Reference 2),
is based upon the assumption that 65 power reactor sites and 32 non-power reactor sites are affected by this rule. According to Section 3.2.4 of this analysis, the information used in the analysis was taken from NUREG-1350, Vol. 21, NRC Information Digest, 2009-2010 Edition (Reference 3). A review of this Digest Edition reveals that the analysis did not consider decommissioning or decommissioned sites, e.g., the CYAPCO ISFSI.
Nonetheless, a review of the revised rule was conducted against the current license basis and NRC approved exemptions on Emergency Planning. The review determined that additional exemptions from portions of 10CFR Part 50 may be required. While CYAPCO believes that the existing Emergency Planning exemptions continue to apply to the regulations as modified and augmented, CYAPCO is requesting an exemption for some of the aspects of the new rule to clarify the license basis. , "Exemption Request," identifies the specific requirements in the regulations that are the subject of the exemption request and contains the associated justifications. The regulations are grouped together according to the six security related emergency planning (EP) issues and six non-security related EP issues described above. , "Connecticut Yankee Compliance Matrix for Emergency Plan" identifies the regulations in order, compares the previous version of the regulation to the new rule and identifies the previous regulation as previously exempted with references to the relevant correspondence and license controlled documents.
Document Control Center CY-1 2-039 / Page 3 Pursuant to 10 CFR 50.12, "Specific Exemptions," CYAPCO is requesting NRC approval of an exemption from certain requirements of 10 CFR 50.47 and 10 CFR 50, Appendix E,. Enclosure 1, "Exemption Request," identifies the specific requirements in the regulations that are the subject of the exemption request and contains the associated justifications. Enclosure 2 provides a compliance matrix.
CYAPCO has determined that this exemption request and its impact on the corresponding emergency plan is authorized by law, will not present an undue risk to the public health and safety and is consistent with the common defense and security in accordance with 10CFR50.12. Thus CYAPCO's intent in submitting this exemption request is to maintain the current regulatory structure prior to the Enhancements to Emergency Preparedness Regulations and, therefore, does not propose any changes to the Emergency Plan or implementing procedures other than simple regulatory reference changes that can be implemented under 10 CFR 50.54(q).
Enclosures 1 and 2 provide security-related sensitive unclassified non-safeguards information (SUNSI) that CYAPCO is requesting be withheld from public disclosure in accordance with 10 CFR 2.390. An affidavit in Attachment 1 to this letter provides the justification to withhold Enclosures 1 and 2 from public disclosure. The cover letter when detached from Enclosures 1 and 2 does not contain SUNSI information.
This submittal contains no new regulatory commitments or revisions to existing commitments.
We are requesting approval of the exemption at your earliest convenience. If you should have any questions regarding this submittal, please contact me at (860) 267-6426.
Sincerely, ames kenois O'at SFIManager
References:
- 1) Enhancements to Emergency Preparedness Regulations (76 Federal Register (FR) 72560) dated November 23, 2011, effective December 23, 2011 for implementation June 20, 2012 with exceptions
Document Control Center CY-12-039 / Page 4
- 2) Regulatory Analysis and Backfit Analysis, Final Rulemaking:
Enhancements to Emergency Preparedness Regulations (10 CFR Parts 50 and 52), U.S. NRC, dated August 4, 2011
- 3) NUREG-1350, Volume 21, NRC Information Digest 2009-2010 Edition, U.S. NRC, August 2009
Attachment:
(1) Affidavit of James Lenois
Enclosures:
(1) Exemption Request (2) Connecticut Yankee Compliance Matrix for Emergency Planning Sections 10 CFR 50.47 and 10 CFR 50 Appendix E cc: W. M. Dean, NRC Region I Administrator J. Joustra, Chief, Decommissioning Branch, NRC Region I J. Goshen, NRC Project Manager, Haddam Neck Plant E. L. Wilds, Jr., Director, CT DEP, Monitoring and Radiation Division
CYAPCO Attachment I Haddam Neck Plant Affidavit CY-12-039 Page 1 of 2 Affidavit of James Lenois a) I am the Manager of the Independent Spent Fuel Storage Installation (ISFSI) for Connecticut Yankee Atomic Power Company (CYAPCO), and as such have the responsibility of reviewing the proprietary and confidential information sought to be withheld from public disclosure in connection with our license to store spent nuclear fuel and Greater-than-Class C radioactive waste. I am authorized to apply for the withholding of such proprietary and SUNSI information from public disclosure on behalf of CYAPCO.
b) I am making this affidavit in conformance with the provisions of 10 CFR 2.390 of the regulations of the Nuclear Regulatory Commission (NRC), and in conjunction with CYAPCO's request for withholding, which is accompanied by this affidavit.
c) I have knowledge of the criteria used by CYAPCO in designating information as proprietary or sensitive unclassified non-safeguards information (SUNSI).
d) By this submittal, CYAPCO seeks to protect from disclosure certain SUNSI information contained in this document. Enclosures 1 and 2 contain security related information that is not public. This affidavit discusses the bases for withholding Enclosures 1 and 2, as indicated therein, from public disclosure. The exemption request and the compliance matrix contain SUNSI that CYAPCO has previously determined to be withheld from public disclosure.
e) Pursuant to the provisions of 10 CFR 2.390(b)(4), the following is furnished for consideration by the NRC in determining whether the SUNSI information sought to be protected should be withheld from public disclosure.
- 1. The information for which protection from disclosure is sought has been held in confidence by CYAPCO. This information is SUNSI-related to CYAPCO, and CYAPCO seeks to protect it as such. The SUNSI to CYAPCO is found in the documents listed in paragraph (d), above. CYAPCO has separated the SUNSI from non-proprietary information in the cover letter. Therefore, CYAPCO seeks to protect the separated information from public disclosure.
- 2. The SUNSI information was identified as SUNSI by CYAPCO using the guidance in NRC Regulatory Issue Summary (RIS) 2005-26, "Control of Sensitive Unclassified Non-Safeguards Information Related to Nuclear Power Reactors."
- 3. The NRC has previously determined that the SUNSI should be withheld from public disclosure.
CYAPCO Attachment Haddam Neck Plant Affidavit CY-12-039 Page 2 of 2
- 4. The information sought to be withheld is being provided to the NRC in confidence, and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the NRC.
- 5. The information sought to be withheld is not available in public sources, to the best of CYAPCO's knowledge and belief.
For all of the reasons discussed above, CYAPCO requests that the identified SUNSI information be withheld from public disclosure.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 20, 2012:
Y James LenoiY' SESI Manager Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099 Nt PlicU
'urn-IF My Commission ExpIms~,~gg My commission expires on: