MONTHYEARCY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-010, Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2)2023-04-24024 April 2023 Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-17-021, Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager2017-09-0505 September 2017 Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-005, Independent Spent Fuel Storage Installation - Property Insurance Coverage2017-02-28028 February 2017 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-17-004, ISFSI - Nuclear Liability Insurance Coverage2017-02-28028 February 2017 ISFSI - Nuclear Liability Insurance Coverage CY-17-007, Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-17-001, ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7)2017-01-0505 January 2017 ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7) CY-17-002, Independent Spent Fuel Storage Installation2017-01-0505 January 2017 Independent Spent Fuel Storage Installation CY-17-003, ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/20162017-01-0505 January 2017 ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/2016 CY-16-035, Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager2016-12-15015 December 2016 Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-004, Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage2016-02-29029 February 2016 Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage CY-16-006, ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status2016-02-0202 February 2016 ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-035, Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report2015-12-0101 December 2015 Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report CY-15-043, ISFSI - Revision 13 to the Emergency Plan2015-12-0101 December 2015 ISFSI - Revision 13 to the Emergency Plan 2023-04-24
[Table view] |
Text
- 4: - - -
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099 DEC 17 M Docket No. 50-213 RE: 10 CFR 20.2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D C 20555 Haddam Neck Plant Supplemental Information Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 Connecticut Yankee Atomic Power Company (CYAPCO) proposes to transfer c6rtain of.its solid waste from decommissioning of the Haddam Neck Plant (HNP) facilities.(e g., structures and buildings) to a disposal facility. Specifically, CYAP.CO proposes .to dispose' of demolition debris from decommissioning of th'e HNP facilities to theos'&S Ecolotdgy' IdahoFacilitiy, located in Grand View,-idaho.
The purpose of this letter is to provide supplemental information requested by the NRC Staff in teleconferences with CYAPCO on December 9 and 15, 2004.
CYAPCO has performed a conservative radiological assessment of the demolition debris material and determined that the potential dose to workers involved in the transportation and placement of the waste at the site and to members of the public after closure of the facility will be no more than a few
-_ milliren per year Total Effective Dose Equivalent (TEDE) and a small fraction of NRC limits for exposure to members of the public of 25 millirem/yr TEDE. This assessment was provided to the NRC by letter dated September 16, 2004.1 To further support this conclusion, CY has performed Microshield2 runs to determine an on-site survey limit for the disposition of waste in appropriate containers that can be shipped to US Ecology Idaho RCRA disposal site.
,.G.' H..Bouchard (CYAPCO) letter to the US NRC Document Control Desk,'
'dated September 16, 2004, RequLst f&o Approval of Proposed Procedures in accordance with 10 CFR 20.2002", CY-04-168.
2 MicroShield 5. Grove Engineering, Rockville, MD, 1998.
Document Control Desk CY-04-252 / Page 2 An action level has been developed to identify when it is appropriate to transport a container to US Ecology or to an alternate disposal site should the container dose rates exceed the alternate waste disposal procedure criteria of 10 CFR 20.2002. These action levels are expressed as a dose rate (in pr/hr), and are based upon the assumption that all gamma emissions are produced by the decay of Cs-1 37. The action levels also assume that the contents of the container contain Cs-137 contamination at a maximum allowable activity concentration of 30 pCi/gm for disposal at US Ecology.
It should be noted that as the weight (and effective density) of the contents of each container is variable, the action levels will also vary. Accordingly, action levels were determined for B-25 containers as well as intermodal containers using appropriate software (i.e., MicroShield).
The survey data in CY's submittal requesting approval of alternative waste disposal procedures for disposal at US Ecology Idaho show Cs-1 37 as approximately 70% of the total radioactivity (Co-60 making up most of the remaining percentage) and Am-241 more then 2 orders of magnitude below Cs-137. Considering this and the waste activity concentration limits for US Ecology Idaho, it is considered appropriate to base the survey criteria on Cs-137. This approach is conservative, as any Co-60 present in the waste will drive the total activity concentration at the action levels to lower values due to the higher energy gamma resulting from decay of Co-60 versus that from Cs-1 37.
Using a nominal container fill height for an intermodal container corresponding to 55 %, a 1 meter dose rate of 4 pr/hr is selected as a reliable and conservative action level for determining compliance with the alternate disposal procedure survey criteria. It is considered that containers exhibiting dose rates below the action level may be shipped to US Ecology Idaho and those exhibiting higher dose rates need to shipped to alternate facilities or investigated further to determine radionuclide concentrations.
Using a dose rate at 1 meter from each intermodal container of 4 pR/hr the dose to-offloading workers is acceptable. Considering such a-close distance to each--
container (1 meter), an exposure time of 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> at this distance would be needed to approach the criteria of 5 mrem per year requirement established by NRC for this alternative disposal procedure. This exposure scenario is conservative and provides evidence that the use of a 30 pCi/g limit (or 4 pR/h for an intermodal at 1 meter) for waste to be disposed at the US Ecology site would result in worker exposures well within the NRC criteria for approval of the alternate disposal request in accordance with 10CFR20.2002.
CYAPCO hereby requests expedited review and approval of this request to support our decommissioning activities at the HNP.
- Document Control Desk CY-04-252 / Page 3 If you should have any questions regarding this submittal, please contact Mr. G.
P. van Noordennen at (860)-267-3938.
Sincerely,
- 6. vs T n ~ 12-17-11'o G. P. van Noordennen Date Regulatory Affairs Manager cc: S. J. Collins, NRC Region 1 Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant R. R. Bellamy, Chief, Decommissioning and Laboratory Branch, NRC Regionl E. L. Wilds, Jr., Director, CT DEP Monitoring and Radiation Division