CPSES-200402570, Confirmation of Implementation of April 29, 2003 Orders
| ML043230032 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/04/2004 |
| From: | Madden F TXU Power |
| To: | Chernoff M, Dyer J Office of Nuclear Reactor Regulation, NRC/NRR/DLPM/LPD2 |
| References | |
| CPSES-200402570, EA-02-038, EA-03-039, EA-03-086, TXX-04197 | |
| Download: ML043230032 (5) | |
Text
SAFEGUARDS INFORMATION X TXU X9ZPower TXU Power Comanche Peak Steam Electric Station P. O. Box 1002 (E01)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins @txu.com Mike Blevins Senior Vice President &
Chief Nuclear Off icer Ref:
EA-02-038 EA-03-039 EA-03-086 CPSES-200402570 Log # TXX-04197 November 4, 2004 U. S. Nuclear Regulatory Commission Mr. James E. Dyer Director, Office of Nuclear Reactor Regulation Room 5D2, Mail Stop 5E7 115 55 Rockville Pike Rockville, Maryland 20852 Ms. Margaret H. Chemoff, Project Manager Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Room 8 G15, Mail Stop 8 G9A 11555 Rockville Pike Rockville, Maryland 20852
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50446 CONFIRMATION OF IMPLEMENTATION OF APRIL 29, 2003 ORDERS
REFERENCES:
- 1)
NRC Letter from Samuel J. Collins, Director Office of Nuclear Reactor Regulation to C. Lance Terry, Senior Vice President and Principal Nuclear Officer, Comanche Peak Steam Electric Station dated April 29, 2003
- 2)
Letter from Mike Blevins, Dated April 29, 2004 to James E. Dyer, NRC, Logged TXX-04079 Attachment and Enclosure contains Safeguards Information.
Upon separation, this page is decontrolled A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak-Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
_ _ 1/
ENFORMATION P S (12O>
TXX-04 197 Page 2 of 3 Ladies and Gentlemen:
The NRC issued Orders dated April 29, 2003 (Reference 1): EA-02-038, Orderfor Compensatory AMeasures Related to Fitness-For-Duty E-nhancements Applicable to Nuclear Facility Secutrit Force Personnel; EA-03-039, Orderfor Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel; and EA-03-086, Order Requiring Coompliance with Revised Design Basis Threat (collectively referred to as "Orders") for CPSES. In addition to other requirements, the Orders required nuclear power plant licensees to revise their physical security plans, safeguards contingency plans, and security force training and qualification plans; submit those plans to the NRC for approval by April 29, 2004; and complete implementation of those plans by October 29, 2004, unless a request for a schedule extension for one or more elements of those plans was approved by the NRC.
On April 29, 2004, TXU Generating Company LP (TXU Power) filed a Supplemental Response to Order EA-03-086 (Reference 2) that contained the Physical Security Plan, the Contingency Plan, and the Training and Qualification Plan as required by Order EA-03-086 for CPSES. By letter dated October 28, 2004, the NRC issued a Safety Evaluation Report documenting the NRC's review and acceptance of those plans.
Section III.C of Order EA-03-086 required TXU Power to advise the NRC when implementation of the NRC approved physical security plans, safeguards contingency plans, and general training and qualification plans has been accomplished.Section III.C.2 of Order EA-03-39 required TXU Power to advise the NRC when full compliance with the requirements in Attachment 2 to that Order has been achieved.
During the review of the NRC Security Safety Evaluation (SE) for CPSES, an error was identified on page 18, paragraph 2 which requires clarification/revision for section 3.6.1.2. Concurrent with this necessary change; sections 6.1.1 and 6.1.2 of the CPSES Security Plan were required to be clarified to assure correct matching to the SE. These clarifications/revisions are identified in the Enclosure to this letter. The Attachment to this letter contains the associated one-for-one page change for the CPSES Security Plan.
TXU Powver hereby certifies that those conditions have been met and the exercise of enforcement discretion pursuant to the Orders during the transition period will no longer be necessary.
If you have any questions concerning this matter, please contact Mr. Fred Madden at (254) 897-8601, or Mr. Don Alps at (254) 897-5432.
Attachment and Enclosure contains Safeguards Information.
Upon separation, this page is decontrolled
TXX-04 197 Page 3 of 3 This communication does not contain new or revised commitments for CPSES, Units I and 2.
In accordance with 10 CFR 2.202(b), the following affirmation is provided:
I state under penalty of perjury that the foregoing is true and correct.
Executed on November 4, 2004.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC, Its General Partner Mike Blevins By: Al <to"rus Fred W. Madden Director, Regulatory Affairs Enclosure Clarification of Required Changes in NRC Security Safety Evaluation and CPSES Security Plan Attachment One-for-One Page Change (Page 8) Replacement for the CPSES Security Plan c -
B. S. Mallett, Region IV M. C. Thadani, NRR Director of Nuclear Security, Office of Nuclear Security and Incident Response Document Control Desk Resident Inspectors, CPSES w/ Enclosure & Attachment w/ Enclosure & Attachment w/ Enclosure & Attachment w/o Enclosure & Attachment w/o Enclosure & Attachment Attachment and Enclosure contains Safeguards Information.
Upon separation, this page is decontrolled
Enclosure to TXX-04197 Clarification of Required Changes in NRC Security Safety
- Evaluation and CPSES Security Plan Attachment and Enclosure contains Safeguards Information.
Upon separation, this page is decontrolled
Attachment to TXX-04 197 One-for-One Page Change (Page 8) Replacement for the CPSES Security Plan Attachment and Enclosure contains Safeguards Information.
Upon separation, this page is decontrolled I/