CPSES-200401296, Transmittal of Electronic Licensing Basis Documents
| ML041480011 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/05/2004 |
| From: | Madden F TXU Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 10010, CPSES-200401296, TAC MC1502, TAC MC1503, TXX-04087 | |
| Download: ML041480011 (2) | |
Text
x. STXU I~s TXU Energy Comanche Peak Steam Electric Station P.O. Box 1002 (EO1)
Glen Rose,TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com Mike Blevins Senior Vice President & Principal Nuclear Officer Ref: IOCFR50.71(e)
CPS ES-20040 1296 Log # TXX-04087 File#
10010 May 5, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
REF:
1)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF ELECTRONIC LICENSING BASIS DOCUMENTS NRC Letter from Mohan C. Thadani to M. R. Blevins, Correction of License and Technical Specifications for Comanche Peak Steam Electric Station (CPSES), dated March 25, 2004, Units I and 2 (TAC NOS.
Gentlemen:
Enclosed is a CD-ROM containing the electronic files of the CPSES Licensing Basis documents (LBDs) current as of May 3, 2004. Reference I requested that CPSES update our License and Technical Specifications to incorporate administrative corrections and inform Mohan C. Thadani when the corrections have been incorporated. As discussed with Mohan C. Thadani, the corrections are incorporated and are reflected in this submittal. This transmittal is the periodic update of the LBDs provided to the NRC on a nominal 2 month frequency and contains the following:
FSAR (Amendment 99, Supplement I)
Technical Specifications (TS) (Amendment 112)
Technical Specifications Bases (Revision 35)
Technical Requirements Manual (TRM) and TRM Bases (Revision 48)
Emergency Plan (EP) (Revision 31)
Emergency Action Levels (EALs) (EPP-201, Revision I 1)
ArPol A Y5 A member ofthe STARS /Stf-f-oic T-am-and Resourc Ch-ri-Alliance.
v--11
-..a.-. euyw r w
- -ov 40<05 3 Callaway Comanche Peak
- Diablo Canyon Palo Verde South Texas Project Wolf Creek A G
AO001o
TXX-04087 Page 2 of 2 Offsite Dose Calculation Manual (ODCM) (Revision 21)
Fire Protection Report (FPR) (Revision 21)
Insenvice Testing Plan (IST) (Revision 23)
Core Operating Limits Report (COLR) (Cycle 1 1/Revision I for Unit I and Cycle 8/Revision I for Unit 2)
Pressure Temperature Limits Report (PTLR) (Revision 2 for Unit I and Revision 3 for Unit 2)
Operating License (OL) (Amendment I 2)
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Should you have questions concerning this submittal, please contact Carl Corbin at 254-897-0121, or e-mail at ccorbinltxu.com.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC, Its General Partner Mike Blevins By:
2Y 2fl/2 Fred W. Madden Regulatory Affairs Manager CBC/cbc Enclosure c -
B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES