CPSES-200301620, Transmittal of First-Half 2003 Fitness-for-Duty Program Performance Data
| ML032270421 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/08/2003 |
| From: | Terry C, Walker R TXU Electric |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200301620, TXX-03142 | |
| Download: ML032270421 (6) | |
Text
rhixu TXU Energy Comanche Peak Steam Electric Station P.O. Box 1002 (EO1)
Glen RoseTX 76043 Tel: 254 897 8920 fax.254 897 6652 iance.terryotxu.com C. Lance Terry Senior Vice President &
Principal Nuclear Officer Ref: 10 CFR 26.7 1(d)
CPSES-20030 1620 Log # TXX03 142 August 8, 2003 U. S. Nuclear Regiulatory Conmmission ATI'N: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECT RIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRtANSMITrAL OF FIRST-HALF 2003 FNESS-FOR-DUT1Y PROGRAM PERFORMANCE DATA Gentlemen:
Attached are CPSES Fitness-For-Duty Program Performance Data for the sixe month period of January 1, 2003 through June 30, 2003. The data required by 10CFRt26.71(d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action."
If there are any questions, please contact Mr. James Brown at (254) 897-8912.
A member of Fhe STARS (Straegic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon Palo Verde
- South Texas Project Wolf Creek
Q@TXU TXX-03142 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By:
'R~erD. Walker Regulatory Affairs Manager NSH/nh Attachments c -
T.P. Gwynn, Region IV W. D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES
I dor Attachment to TXX-03142 (3 Pages)
II Fitness for Duty Program Performance Data Personnel Subject to IOCFR 26 TXU ENERGY campainy a hbnfta Er~din Comanche Peak Steam Electrfc Station P.O. Box IQ02 Glen Rask. Texas 76043 Lton James E. Brown Fitness For Thity Comrdi~nAtr 254-897-8912 PhWW frncka ara w e)
Cutoffs: ScreenlCornirmation (nglmi IK Appendix A to 10CFR 26 Marijuana 50 usg ml 15 ng/wmmphetamines
-I Cocaine
/
Pherlcyclidine I
-Opiates I
Alcohol (% SAC)
I Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number wit.
Unesco_
oed Access397 Categories Tested Positive Tested Positive Tested Positive J Pre4Access 16 O
- 0.
=0
.B5 O
Postaccident 0
0 0
0 0
0 l
Observed behavior RandSom 334 2
0 0
122 0
Follow-up 0
0 0
O 0
her 18
~~~~
~~0 0
0 10 Other.
3 7 0s 0
0 1 RV 1 / 9 Total J
370 3
O 217 0
REY. 1/92
TXU ELECTRIC COMANCHE PEAK STEAM ELECTRIC STATION FITNESS FOR DUTY
SUMMARY
OF MANAGEMENT ACTION Six months ending June 30, 2003 Activities associated with the Fitness-for-Duty Program were performed without significant incidents. Revisions to the Fitness for Duty Training were implemented. The percentage rate of random drug testing for the first half of 2003 was 60%.
One event was reported by telephone under 10CFR26.73
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1
2 3
4 5
Licensee Employees 2.
Long-Term Contractors Shod-Term Contractors 2
A Total 2
2 5
I C.(
06 I