CPSES-200300281, Transmittal of Second-Half 2003 Fitness-for-Duty Program Performance Data
| ML040650419 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/26/2004 |
| From: | Madden F TXU Electric |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200300281, TXX-04030 | |
| Download: ML040650419 (6) | |
Text
TXU
,1W'4q-TXU Energy Comanche Peak Steam Electric Station P.O.Box 1002 (EO1)
Glen Rose,TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com Mike Blevins Senior Vice President & Principal Nuclear Officer Ref: 10 CFR 26.71(d)
CPSES-200300281 Log # TXX-04030 February 26, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50445 AND 50-446 TRANSMITTAL OF SECOND-HALF 2003 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:
Attached are CPSES Fitness-For-Duty Program Performance Data for the six month period of July 1, 2003 through December 31, 2003. The data required by 1 0CFR26.71(d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled 'Summary of Management Action."
If there are any questions, please contact Mr. James Brown at (254) 897-8912.
,AuZ A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project Wolf Creek
TXX-04030 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By:
,J Fred W. Madden Nuclear Licensing Manager NSH/nh Attachments c -
B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachment to TXX-04030 (3 Pages)
Attachment to TXX-04030 Page 1 bf 3 Fitness for Duty Program Performance Data Personnel Subject to IOCFR 26 TXU ENERGY Cmomtay DIecember '1, np 6 Wnr'j End" Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose. Texan 7604I Lo:on James E. Brown ifitnaes 1;nr nitvf, artnan Cof ac N'-
Con=c Narr e 254-897-8917 Phore (incude uuea cC4)
Cutoffs: Screen/Confirmation (ng/mJ)
I Appendix A to 1 OCFR 26 Marijuana Cocaine 50 ng Aial 15 ng/mumphetamines I
Phencyclidine I
/
/
Opiates-
/
Alcohol (% BAC)
I Long-Terrn Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number wil0 Unescorted Access 1013 O_-
533
. ~~~
$*1 Categores
- -Tested
-Positre Tested PositWe Tested
__Pos;1iv Pre-Access
! 2 1
1 20 0 1 0
3 M
0 0
CD 0
Post accident 0
n n
0 -
I _
Observed behavior 0
0 0
1.
0 1
Random 337 2
0 O.
197 Follow-up 21 0
n 0
I i
. I Other 12 0
0 0
27
- i I
I Total 390 2
1041 0
-4A A
0 I
I REV.1/92
Brealkdown of Confirmed Positive Tests for Specific Substances IV cm Ampho-Phency I
nReusal Marijuana Cocaine Opiates lamines lidino Alcohol to Test 1
2 3
4 5
licensee Employees 1
Long-Term Contractors I Shorl-Term Contractors 1
1 2
A Total 2
2 2
1 1
1.I
-II 6
I I,
0
Attachment to TXX-04030 Page 3 of 3 TXU ENERGY' COMANCHE PEAK STEAM ELECTRIC STATION FITNESS FOR DUTY
SUMMARY
OF MANAGEMENT ACTION Six months ending December 31, 2003 Activities associated with the Fitness for Duty Program were perfonned without significant incidents. Revisions to the Fitness for Duty Training were implemented. The percentage rate of random drug testing for the second half of 2003 was 66%.
No events were reported by telephone'under 10CFR26.73