MONTHYEARCNRO-2006-00035, Supplement to Request for the Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for the Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee Project stage: Request ML0621902422006-10-0202 October 2006 GGNS, IP-1, IP-2, IP-3, Pilgrim, River Bend, Vermont Yankee, and Waterford - Request for Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems - Letter to Entergy Operations, Inc. Enclosing Safety Evaluation Project stage: Approval 2006-10-02
[Table View] |
Supplement to Request for the Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont YankeeML061980028 |
Person / Time |
---|
Site: |
Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, FitzPatrick |
---|
Issue date: |
07/13/2006 |
---|
From: |
Burford F Entergy Operations |
---|
To: |
Document Control Desk, NRC/FSME |
---|
References |
---|
CNRO-2006-00035 |
Download: ML061980028 (6) |
|
|
---|
Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)2018-11-16016 November 2018 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00031, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E2018-07-0303 July 2018 Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E CNRO-2018-00023, Request to Revise Quality Assurance Program Approval for Radioactive Material Packages No. 02402018-06-18018 June 2018 Request to Revise Quality Assurance Program Approval for Radioactive Material Packages No. 0240 CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station CNRO-2018-00018, Anchor Darling Double Disc Gate Valve Information and Status2018-04-16016 April 2018 Anchor Darling Double Disc Gate Valve Information and Status CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2018-03-29029 March 2018 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00012, Request to Remove James A. FitzPatrick Nuclear Power Plant from Quality Assurance Program Approval for Radioactive Material Packages No. 02402017-06-14014 June 2017 Request to Remove James A. FitzPatrick Nuclear Power Plant from Quality Assurance Program Approval for Radioactive Material Packages No. 0240 CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2017-00004, Notice Regarding Third Proposed Amendment to Master Trust and Planned Distribution of Assets from FitzPatrick Unit Fund to Trust Established2017-01-20020 January 2017 Notice Regarding Third Proposed Amendment to Master Trust and Planned Distribution of Assets from FitzPatrick Unit Fund to Trust Established CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00020, Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning .2016-08-16016 August 2016 Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning . CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00014, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2016-04-0404 April 2016 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2016-03-30030 March 2016 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2016-00009, Unit 3 - Supplement to Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement2016-03-21021 March 2016 Unit 3 - Supplement to Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement CNRO-2016-00006, Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement2016-02-25025 February 2016 Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00004, Notice Regarding Acquisition of Title to Leased Interest2016-02-10010 February 2016 Notice Regarding Acquisition of Title to Leased Interest CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) 2022-05-26
[Table view] |
Text
Edng Entergy Entergy Operations, Inc.
1340 Echelon Parkway Jackson. Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety &Licensing CNRO-2006-00035 July 13, 2006 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems Arkansas Nuclear One Indian Point Nuclear Generating Units 1 & 2 Units Nos. 1, 2 and 3 Docket Nos.
- Docket Nos. 50-313 & 50-368 50-003, 50-247, and 50-286 License Nos. DPR-51 and NPF-6 License Nos. DPR-5, DPR-26, and DPR-64 Grand Gulf Nuclear Station, Unit 1 Waterford Steam Electric Station, Docket No. 50-416 Unit 3 License No. NPF-29 Docket No. 50-382 License No. NPF-38 James A. FitzPatrick Nuclear Power River Bend Station Plant Docket No. 50-333 Docket No. 50-458 License No. DPR-59 License No. NPF-47 Pilgrim Nuclear Power Station Vermont Yankee Nuclear Power Docket No. 50-293 Docket No. 50-271 License No. DPR-35 License No. DPR-28
References:
- 1. Entergy letter dated May 19, 2006, Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems (CNRO 2006-00020)
- 2. Delta Protection/Bacou Dalloz MURUBLU05NP, 'Topical Report Submittal of Delta Protection Mururoa Blu Single Use Encapsulating Suits," October 27, 2005 (ADAMS Accession No. ML053060280)
- 3. NIOSH "Concept for Industrial Power, Air-purifying Respiratory Standard," Draft for Comment, May 30, 2005 (http://www.cdc.gov/niosh/npptl/standardsdev.htmi)
CNRO-2006-00035 Page 2 of 3
Dear Sir or Madam:
Entergy Operations Inc. and Entergy Nuclear Operations Inc. (Entergy), in Reference 1, requested authorization for use of equipment that has not been tested or certified by the National Institute for Occupational Safety and Health (NIOSH). The request was to use Delta Protection's self fed single use Mururoa BLU suit. The request was made pursuant to 10 CFR 20.1703(b).
On June 16, 2006, Entergy and members of your staff held a phone call to discuss the change. As a result of that call, Entergy agreed to establish procedures that implement the use of the BLU suits consistent with the Topical Report (ADAMS Accession No. ML053060280) and in accordance with the "Approved Device Configuration and Conditions of Use" identified in the NRC's related Safety Evaluation (ADAMS Accession No. ML060950499). These new commitments are listed in Attachment 1. The commitments supersede all of the commitments made in Reference 1.
Should you have any questions regarding this submittal, please contact Bill Brice at (601) 368-5076.
Very truly yours, FGB/WBB/bal Attachments:
- 1. List of Regulatory Commitments cc: (see next page)
CNRO-2006-00035 Page 3 of 3 cc: Mr. M. A. Balduzzi (PILG)
Mr. W.R. Campbell (ECH)
Mr. F. R. Dacimo (IPEC)
Mr. J. P. DeRoy (ECH)
Mr. P. T. Dietrich (JAF)
Mr. W. A. Eaton (ECH)
Mr. R. K. Edington (CNS)
Mr. J. S. Forbes (ANO)
Ms. C. L. Gaujacq (ECH)
Mr. J. T. Herron (WPO)
Mr. P. D. Hinnenkamp (RBS)
Mr. M. R. Kansler (WPO)
Mr. 0. Limpias (WPO)
Mr. J. McGaha (ECH)
Mr. C. J. Schwarz (WPO)
Mr. T. A. Sullivan (VY)
Mr. G. J. Taylor (ECH)
Mr. J. E. Venable (W-3)
Mr. G. A. Williams (GGNS)
Mr. J. P. Boska, Project Manager, IP2, IP3, JAF Mr. S. J. Collins, Regional Administrator, Region I Mr. M. B. Fields, Project Manager, WF3 Mr. D. G. Holland, Project Manager, ANO-1&2 Dr. B. S. Mallett, NRC Regional Administrator, Region IV Mr. J. J. Shea, Project Manager, PNPS, VY Mr. B. K. Vaidya, Project Manager, GGNS & RBS Mr. M. K. Webb, Project Manager, IP1 NRC Resident Inspectors (ANO, GGNS, IP2, 1P3, JAF, RBS, PNPS, WF3, VY)
American Nuclear Insurers (Attn: Library)
Mr. Bernard R. Bevill (Arkansas Dept. of Health (DRC & EM)
Mr. Paul Eddy (NYS Dept. of Public Service)
LA Dept. of Environmental Quality (OECSD)
Mr. D. E. Levanway (Wise Carter)
Mr. David O'Brien (Vermont DPS)
Mr. J. Smith (Wise Carter)
Mr. Peter R. Smith (NYSERDA)
Mr. H. L. Thomas (SMEPA)
ATTACHMENT 1 CNRO-2006-00035 List of Regulatory Commitments
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)
Establish procedures that implement the use of the BLU suits consistent with the Topical Report (ADAMS Accession No. ML053060280) (Ref. 2) and Before use of in accordance with the "configuration and conditions X suit for use" identified in the NRC's related Safety Evaluation (ADAMS Accession No. ML060950499).
The BLU suits will be used in a configuration consisting of: Mururoa BLU one-piece encapsulating suit (of either PVC or Ethyfuge construction), fitted with a Micronel C500X-012EK-AB60 blower with a C501A-012AK-A battery (consistent with the parts Before use of list in Section 7 of Attachment 6.6.6 to the Topical X suit Report (ADAMS Accession No. ML053060280)
(Ref. 2) four Scott PF 10 P3, or four Delta Protection P3, high efficiency particulate filter cartridges. All four filter cartridges must be matching and replaced as a set.
Procedures for use of the suit systems are integrated into the respiratory programs required by Subpart H of 10 CFR Part 20. Fit testing of user is Before use of not applicable to fully encapsulating suits. Prior to X suit use, wearers are trained on these conditions of use as well as the emergency escape features of the suits.
Suits are used in accordance with recommendations in Attachments 6.6.4, 6.6.5, and 6.6.6 of the Topical Before use of Report (ADAMS Accession No. ML053060280) suit (Ref. 2).
Suit enclosures are single use only, and are discarded after use. Unused suit enclosures are stored in their original manufacturer's packing (in an environment not colder than 32 deg. F, nor hotter Before use of than 140 deg. F), with a maximum storage shelf-life X suit of 3 years. Suits are not to come in contact with anything colder than 41 deg. F, nor hotter than 140 deg. F, during use.
Suits are donned with a fully charged battery pack installed on the blower. The maximum period of use Before use of (timed from a fully charged battery), is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with X suit the blower set at 600 I/min, and 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> with the blower at the 400 I/min setting.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)
Suits are used only in atmospheres containing specific contaminants in concentrations that are not IDLH, as given in NIOSH "Concept for Industrial Power, Air-purifying Respiratory Standard", Draft for Before use of Comment, May 30, 2005 suit (http://www.cdc.gov/niosh/npptl/standardsdev.html),
and have an oxygen content of at least 19.5 percent by volume.
Communication channels are established with Delta Protection to report any defects experienced with Before use of the device, and ensure that any manufacturer's X suit notifications concerning the suit systems are received in a timely manner.