MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)2018-11-16016 November 2018 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00031, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E2018-07-0303 July 2018 Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E CNRO-2018-00023, Request to Revise Quality Assurance Program Approval for Radioactive Material Packages No. 02402018-06-18018 June 2018 Request to Revise Quality Assurance Program Approval for Radioactive Material Packages No. 0240 CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station CNRO-2018-00018, Anchor Darling Double Disc Gate Valve Information and Status2018-04-16016 April 2018 Anchor Darling Double Disc Gate Valve Information and Status CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2018-03-29029 March 2018 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00012, Request to Remove James A. FitzPatrick Nuclear Power Plant from Quality Assurance Program Approval for Radioactive Material Packages No. 02402017-06-14014 June 2017 Request to Remove James A. FitzPatrick Nuclear Power Plant from Quality Assurance Program Approval for Radioactive Material Packages No. 0240 CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2017-00004, Notice Regarding Third Proposed Amendment to Master Trust and Planned Distribution of Assets from FitzPatrick Unit Fund to Trust Established2017-01-20020 January 2017 Notice Regarding Third Proposed Amendment to Master Trust and Planned Distribution of Assets from FitzPatrick Unit Fund to Trust Established CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00020, Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning .2016-08-16016 August 2016 Application for Order to Transfer Master Decommissioning Trust from PASNY to ENO, Consenting to Amendments to Trust Agreement, and Approving Proposed License Amendments to Modify and Delete Decommissioning . CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00014, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2016-04-0404 April 2016 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2016-03-30030 March 2016 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) CNRO-2016-00009, Unit 3 - Supplement to Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement2016-03-21021 March 2016 Unit 3 - Supplement to Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement CNRO-2016-00006, Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement2016-02-25025 February 2016 Notice of Change in Corporate Form of Entergy Nuclear New York Investment Company I and Creditor Agreement CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00004, Notice Regarding Acquisition of Title to Leased Interest2016-02-10010 February 2016 Notice Regarding Acquisition of Title to Leased Interest CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) 2022-05-26
[Table view] |
Text
Entergy Operations, Inc.
-- Entergy 1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing CNRO-2006-00020 May 19, 2006 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Request for the Use of Delta Protection's Self Fed Single Use uMururoa BLU" Suit Systems Arkansas Nuclear One Indian Point Nuclear Generating Units 1 & 2 Units Nos. 1, 2 and 3 Docket Nos.
Docket Nos. 50-313 & 50-368 50-003, 50-247, and 50-286 License Nos. DPR-51 and NPF-6 License Nos.
DPR-5, DPR-26, and DPR-64 Grand Gulf Nuclear Station, Unit 1 Waterford Steam Electric Station, Docket No. 50-416 Unit 3 License No. NPF-29 Docket No. 50-382 License No. NPF-38 James A. FitzPatrick Nuclear Power River Bend Station Plant Docket No. 50-333 Docket No. 50-458 License No. DPR-59 License No. NPF-47 Pilgrim Nuclear Power Station Vermont Yankee Nuclear Power Docket No. 50-293 Docket No. 50-271 License No. DPR-35 License No. DPR-28
Dear Sir or Madam:
Pursuant to 10 CFR 20.1703(b), Entergy Operations Inc. and Entergy Nuclear Operations Inc.
(Entergy) request authorization for use of equipment that has not been tested or certified by National Institute for Occupational Safety and Health (NIOSH). Entergy desires to use the Delta Protection Mururoa BLU suit systems which are described in "Topical Report for Delta Protection Mururoa BLU Suit Systems" (TR MURUBLU05NP). The NRC has approved the topical report by letter dated April 10, 2006 (TAC NO. MC8994).
4o0fi
CNRO-2006-00020 Page 2 of 4 Entergy has identified the Delta Protection Mururoa BLU suit systems as having benefits from a contamination control, heat stress reduction, and respiratory protection point of view.
Entergy is requesting authorization for their use as respiratory protection equipment.
Approval of the request will improve worker safety in areas of airborne radioactivity and high potential for facial/skin contamination from hot particles. In addition, the fact that the unit will supply full body air flow cooling within the suit as well as eliminate the need to establish an air distribution network at the work site will save time and overall work exposure. Entergy anticipates outage job time savings, as well as the reduction of personal contamination events. The full body cooling effect will help to eliminate concerns that have arisen in the past regarding heat stress. In summary, the suit systems will aid significantly in achieving worker doses as low as reasonably achievable (ALARA).
Entergy has identified the following as commitments associated with this request.
- 1. Entergy will follow the conditions of use and use one of the approved device configurations indicated in "Topical Report" MURUBLU05NP (TAC No. MC8994).
- 2. The Delta Protection BLU self fed single use suit will be integrated into Entergy station respiratory program using the information provided by the manufacturer. Prior to use, wearers will be trained on the conditions of use as well as the emergency escape features of the suits.
- 3. New lesson plans will be developed to train workers on BLU features, donning, use and removal, cautions and use of mouth strip and tear off strips for routine and emergency egress, as well as the maintenance of the "powered air purifying system" that forms an integral part of the product.
- 4. All suits and cartridges will be treated as "Single Use" only.
- 5. The suit system will not be used in an Immediately Dangerous to Life and Health (IDLH) environment.
- 6. Communication channels will be established with the supplier to report any defects, if experienced, with the device, and ensure that any manufacturer's notifications concerning the suit systems are received in a timely manner.
- 7. Entergy will report any defects in a timely manner to the U.S. Nuclear Industry through our operating experience process.
Entergy has summarized the commitments related to this request in Attachment 1.
Approval of the use of the suits will allow Entergy to proceed with procedure changes and complete training necessary for the use of the suits for outages scheduled for the fall of 2006.
Therefore, Entergy is requesting approval by September 1, 2006.
CNRO-2006-00020 Page 3 of 4 Should you have any questions regarding this submittal, please contact Bill Brice at (601) 368-5076.
Very truly yours, FGB/WBB/bal Attachments:
- 1. List of Regulatory Commitments cc: (see next page)
I t CNRO-2006-00020 Page 4 of 4 cc: Mr. M. A. Balduzzi (PILG)
Mr. W.R. Campbell (ECH)
Mr. F. R. Dacimo (IPEC)
Mr. J. P. DeRoy (ECH)
Mr. P. T. Dietrich (JAF)
Mr. W. A. Eaton (ECH)
Mr. R. K. Edington (CNS)
Mr. J. S. Forbes (ANO)
Ms. C. L. Gaujacq (ECH)
Mr. J. T. Herron (WPO)
Mr. P. D. Hinnenkamp (RBS)
Mr. M. R. Kansler (WPO)
Mr. 0. Limpias (WPO)
Mr. J. McGaha (ECH)
Mr. C. J. Schwarz (WPO)
Mr. T. A. Sullivan (VY)
Mr. G. J. Taylor (ECH)
Mr. J. E. Venable (W-3)
Mr. G. A. Williams (GGNS)
Mr. J. P. Boska, Project Manager, IP2, IP3, JAF Mr. S. J. Collins, Regional Administrator, Region I Mr. M. B. Fields, Project Manager, WF3 Mr. D. G. Holland, Project Manager, ANO-1&2 Dr. B. S. Mallett, NRC Regional Administrator, Region IV Mr. J. J. Shea, Project Manager, PNPS, VY Mr. B. K. Vaidya, Project Manager, GGNS & RBS Mr. M. K. Webb, Project Manager, IP1 NRC Resident Inspectors (ANO, GGNS, IP2, IP3, JAF, RBS, PNPS, WF3, VY)
American Nuclear Insurers (Attn: Library)
Mr. Bernard R. Bevill (Arkansas Dept. of Health (DRC & EM)
Mr. Paul Eddy (NYS Dept. of Public Service)
LA Dept. of Environmental Quality (OECSD)
Mr. D. E. Levanway (Wise Carter)
Mr. David O'Brien (Vermont DPS)
Mr. J. Smith (Wise Carter)
Mr. Peter R. Smith (NYSERDA)
Mr. H. L. Thomas (SMEPA)
ATTACHMENT I CNRO-2006-00020 List of Regulatory Commitments
Attachment I to CNRO-2006-00020 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE
_C ek one) l SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)
Entergy will use one of the approved device configurations as indicated and follow the conditions Before use of of use from the "Topical Report" MURUBLU05NP suit (TAC No. MC8994)
The Delta Protection BLU self fed single use suit will be integrated into Entergy station respiratory program using the information provided by thb Before use of manufacturer. Prior to use, wearers will be trained X suit on the conditions of use as well as the emergency escape features of the suits.
New lesson plans will be developed to train workers on BLU features, donning, use and removal, cautions and use of mouth strip and tear off strips Before use of for routine and emergency egress, as well as the X suit maintenance of the "powered air purifying system" that forms an integral part of the product.
All suits and cartridges will be treated as "Single Before use of Use" only. X suit The suit system will not be used in an Immediately Before use of Dangerous to Life and Health (IDLH) environment. X suit Communication channels will be established with the supplier to report any defects, if experienced, Before use of with the device, and ensure that any manufacturer's X suit notifications concerning the suit systems are received in a timely manner.
Entergy will report any defects in a timely manner to the U.S. Nuclear Industry through our operating suit experience process. ___