CNRO-2002-00024, Entergy Nuclear, Inc., Early Site Permit Application
ML021710017 | |
Person / Time | |
---|---|
Site: | Grand Gulf, Nuclear Energy Institute |
Issue date: | 04/15/2002 |
From: | Hutchinson C Entergy Nuclear |
To: | Lyons J Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNRO-2002-00024 | |
Download: ML021710017 (2) | |
Similar Documents at Grand Gulf, Nuclear Energy Institute | |
---|---|
Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022
[Table view]Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00011, Notice Regarding Renewal of Lease2013-12-0303 December 2013 Notice Regarding Renewal of Lease CNRO-2013-00009, Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc2013-06-20020 June 2013 Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc 2022-05-26 |
Text
Entergy Nuclear, Inc.
-z-E~ntergy PO. Box 32000 Jackson, MS 39286 Tel 601 368 5294 C. Randy Hutchinson Sr. VP Business Development CNRO-2002-00024 April 15, 2002 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. James Lyons Washington, D.C. 20555-0001
SUBJECT:
Early Site Permit Application
Dear Sir or Madam:
This letter is to advise the NRC that Entergy Nuclear will be preparing an Early Site Permit (ESP) application pursuant to 10 CFR 52 "Early Site Permits; Standard Design Certifications; and Combined Licenses for Nuclear Power Plants." It is Entergy Nuclear's intention to immediately begin the preparation of this ESP application for the Grand Gulf Nuclear Station site located in Port Gibson, MS. Entergy Nuclear anticipates submitting the ESP application to the NRC by June 30, 2003.
If you have any questions or concerns regarding this matter, please contact me at 601-368-5294 or Kenneth Hughey at 601-368-5327.
Sincerely, cc: (See Next Page) cio T Y) ý,ivi
CNRO-2002-00024 Page 2 of 2 Mr. C. G. Anderson (ANO)
Mr. J. L. Blount (ECH)
Mr. W.R. Campbell (ECH)
Ms. S. R. Cotton (ANO)
Mr. W. A. Eaton (GGNS)
Mr. P. D. Hinnenkamp (RBS)
Mr. R. J. King (RBS)
Mr. M.A. Krupa (ECH)
Mr. R. D. Peters (W-3)
Mr. N. S. Reynolds Mr. J. C. Roberts (GGNS)
Mr. L. Jager Smith (Wise, Carter)
Mr. G. J. Taylor (ECH)
Mr. J. E. Venable (W-3)
Mr. G. A. Williams (ECH)
Mr. S. J. Collins (NRR/OD)
Mr. E. W. Merschoff (NRC/Region IV)
Mr. A. C. Thadani (NRCIRES/OD)
(NRC Senior Resident Inspectors)
Mr. P. J. Alter (RBS)
Mr. R. L. Bywater (ANO)
Mr. T. R. Famholz (W-3)
Mr. T. L. Hoeg (GGNS)
(NRC Project Managers)
Mr. T. W. Alexion, Project Manager (ANO-2)
Mr. N. Kalyanam, Project Manager (W-3)
Mr. W. D. Reckley, Project Manager (ANO-1)
Mr. S. P. Sekerak, Project Manager (GGNS)
Mr. D. J. Wrona, Project Manager (RBS)