BYRON 2018-0110, 10 CFR 72.48 Evaluation Summary Report
| ML18344A077 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/10/2018 |
| From: | Kanavos M Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BYRON 2018-0110 | |
| Download: ML18344A077 (1) | |
Text
- _
Byron Generating Station Exeton Generat Ion 445ONorthGerrnanChurch Rd www.exeioncorp.com December 10, 2018 10 CFR 72.48 LIR:
BYRON 2018-0110 File:
1.10.0101 (1D.101) 2.07.061 1 (5R108)
U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
10 CFR 72.48 Evaluation Summary Report The purpose of this letter is to submit the biennial report of changes, tests, or experiments, perlormed by Exelon Generation Company, LLC (EGC) for the Byron Station (Byron)
Independent Spent Fuel Storage Installation (ISFSI), as required by 10 CFR 72.48, Changes, tests, and paragraph (d)(2).
This report addresses the period from November 1, 201 6 through October 31, 2018.
There were no 10 CFR 72.48 Evaluations performed for the Byron ISFI during this period.
Thus, no 10 CFR 72.48 Evaluation summaries are provided.
There are no regulatory commitments contained in this letter.
Should you have any questions, please contact Mr. Douglas Spitzer, Regulatory Assurance Manager, at (81 5) 406-2800.
Respectfully, Mark E. Kanavos Site Vice President Byron Generating Station MEKIGC/rm cc: NRC Regional Administrator NRC Region III