BYRON 2005-0121, Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage
| ML052920168 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/17/2005 |
| From: | Kuczynski S Exelon Generation Co, Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 1.10.0101, BYRON 2005-0121 | |
| Download: ML052920168 (2) | |
Text
Exel flM el I CnI. C ICi Ccii PillS C
wwwcxeloCccrl) c rn NJ u.clear Byr r Stat 44~1 N ft C ci i~ii 7] iic Ri I
B,ir 5
011 9714 October 17, 2005 LTR:
BYRON 2005-0121 File:
110.0101 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 2 Facility Operating License No. NPF-66 NRC Docket No. STN 50-455
Subject:
Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cyclel2 Refueling Outage Pursuant to Item a of Technical Specification 5.6.9, Steam Generator (SG) Tube Inspection Reports, we are reporting the number of SG tubes plugged or repaired during Byron Station, Unit-2, Cycle 12 Refueling Outage.
A 100% full-length eddy current bobbin coil inspection was performed on all four Unit-2 steam generators.
Additionally, a 20% plus-point inspection of tubes within the hot leg top of tubesheet region from +3 inches above to 17 inches below the top of the tubesheet was performed on all four Unit-2 steam generators. This sample included a 20% minimum sample of the total population of bulges >18 volts and over-expansions ~i.5 mils located within the hot leg tubesheet from top of the tubesheet to 17 inches below the top of the tubesheet.
A total of 17 tubes were plugged during the current Byron Station, Unit-2, Cycle 12 Refueling Outage.
Based upon the results of this inspection, SGs 2A and 2D steam generators were classified as inspection category C-i and SGs 2B and 2C were classified as inspection category C-2 in accordance with Technical Specification 5.5.9.c, Inspection Results Classification.
Byron Ltr: 2005-0121 October 17, 2005 Page 2 The plugging distribution between the SGs is summarized in the table below.
Steam Generator Tubes Plugged this Outage (B2R12)
Tubes Plugged Previously Total Tubes Plugged*
2A 0
144 144 2B 10 113 123 2C 4
53 57 2D 3
22 25 Total 17 332 349
- Each SG contains 4570 tubes If there are any questions regarding this information, please contact Mr. W. Grundmann, Regulatory Assurance Manager, at (815) 406-2800.
Respectfully, S~fI44~
£. ~
Stephen E. Kuczynski Site Vice President Byron Nuclear Generating Station SEK/JS/TLF/rah