BVY 15-017, 10 CFR 72.48 Report

From kanterella
Jump to navigation Jump to search
10 CFR 72.48 Report
ML15084A143
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/03/2015
From: Chappell C
Entergy Nuclear Vermont Yankee
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
BVY 15-017
Download: ML15084A143 (2)


Text

Entergy EntNgy Nubar Vermont Yanke, LLC Vermont Yankee 320 Governor Hunt Rd.

Vernon. V1 802-257-771 CO"yC. ChapWe Manager. Ucensn 10 CFR 72.48(dX2)

WVY 1"017 March 2, 2015 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, OC 205550001

SUBJECT:

10 CFR 72.48 Report Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

Dear Sir or Madam:

In accordance with 10 CFR 72.48(dX2), this letter reports that no changes requiring a 72.48 Evaluation were performed at Vermont Yankee Nuclear Power Station (VY), covering the period between April 6, 2013 and March 2, 2015.

There are no new regulatory commitments contained in this submittal.

If you have any questions or require additional Information, please contact me at (802) 451-3374.

Sincerely, 6jccc/pl6e cc: (next page)

ýA 3

BVY 15.0171 Page 2 of 2 cc:

Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. James S. Kim, Proje Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mall Stop 08015 Washington, OC 20556 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Goernor Hunt Rd Vernon, Vermont 05354 Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 StatStreet-DMwer 20 Montpeller, Vermont 05620-2601