BVY 14-013, ISFSI Annual Radioactive Effluent Release Report for 2013
| ML14051A530 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 02/13/2014 |
| From: | Chappell C Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| BVY 14-013 | |
| Download: ML14051A530 (2) | |
Text
Entergy Nuclear Operations, Inc.
Vermont Yankee 320 Governor Hunt Road Vernon, VT 05354
--- En tergy
- vro, Tel: (802) 257-7711 Coley C. Chappell Manager, Licensing BVY 14-013 February 13, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
ISFSI Annual Radioactive Effluent Release Report for 2013 Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28
Dear Sir or Madam:
In accordance with 10CFR72.44(d)(3), Vermont Yankee hereby submits the Independent Spent Fuel Storage Installation (ISFSI) annual effluent report for the previous calendar year.
By design, the seal welded storage canisters of the Holtec HI-STORM 100 Cask System used at Vermont Yankee do not create any radioactive materials or have any radioactive material effluents. The seal welded storage system design provides assurance that there are no radioactive effluent release pathways from the storage casks.
This letter documents that there were no radioactive effluents discharged or released from the Vermont Yankee ISFSI and therefore no ISFSI-specific data to report for calendar year 2013.
There are no new regulatory commitments being made in this submittal.
Should you have any questions concerning this submittal, please contact me at (802) 451-3374.
Sincerely,
[CCC/J M v
BVY 14-013 / Page 2 of 2 cc:
Mr. William Dean, Region 1 Administrator U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. Douglas V. Pickett, Project Manager U.S. Nuclear Regulatory Commission Mail Stop: 08G9A 11555 Rockville Pike Rockville, MD 20852-2378 USNRC Resident Inspector Vermont Yankee Mr. Christopher Recchia, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620