|
---|
Category:Letter type:BVY
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate BVY 22-018, Pre-Notice of Disbursement from Decommissioning Trust2022-06-0808 June 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-015, 2021 Radiological Environmental Operating Report2022-05-0505 May 2022 2021 Radiological Environmental Operating Report BVY 22-017, Pre-Notice of Disbursement from Decommissioning Trust2022-05-0505 May 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-014, 2021 Radiological Effluent Release Report2022-04-28028 April 2022 2021 Radiological Effluent Release Report BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)2022-04-12012 April 2022 Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) BVY 22-011, Pre-Notice of Disbursement from Decommissioning Trust2022-04-0404 April 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20212022-03-23023 March 2022 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2021 BVY 22-008, Pre-Notice of Disbursement from Decommissioning Trust2022-02-24024 February 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-005, ISFSI Decommissioning Funding Plan2022-02-24024 February 2022 ISFSI Decommissioning Funding Plan 2024-01-04
[Table view] Category:Technical Specifications
MONTHYEARML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18347B3592019-01-11011 January 2019 12-13-18-License Transfer Conforming Amendment Markup ML18253A2022018-10-11011 October 2018 Conforming License Amendment Approval of License Transfer Request(License DPR-28, Docket 50-271 and 72-59) ML18156A1812018-08-15015 August 2018 ISFSI Only Tech Spec Amendment Package ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves ML0917400402009-07-13013 July 2009 License Amendment, Relocation of Reactor Building Crane Technical Specification BVY 09-035, Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages2009-05-20020 May 2009 Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages ML0901206582009-02-11011 February 2009 Issuance of Amendment Battery Systems BVY 08-084, Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information2008-12-18018 December 2008 Technical Specifications Proposed Change No. 273, Supplement 5, Response to Request for Additional Information BVY 08-075, Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 22008-12-15015 December 2008 Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 2 BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-062, Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information2008-09-15015 September 2008 Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-047, Technical Specification Proposed Change No. 276, Response to Request for Additional Information2008-07-29029 July 2008 Technical Specification Proposed Change No. 276, Response to Request for Additional Information ML0817601182008-06-23023 June 2008 Technical Specifications, Amendments to Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0811201212008-04-17017 April 2008 Technical Specifications, Amendment No. 231 ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits ML0708607332007-03-26026 March 2007 Technical Specifications, Modify Requirements for Inoperable Snubbers by Relocating the Current TS Requirements Limiting Condition for Operation (LCO) 3.6.1 and Surveillance Requirement (SR) 4.6.1 ML0629103402006-08-28028 August 2006 Correction to Technical Specification Page 255 Amendment No. 226 BVY 06-067, Correction to Technical Specification Page2006-07-27027 July 2006 Correction to Technical Specification Page ML0603901072006-03-0202 March 2006 Vermont Yankee, Tech Spec Pages for Amendment 229 Regarding Extended Power Uprate BVY 06-018, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages2006-02-22022 February 2006 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 45, Extended Power Uprate - Revised Technical Specification Pages ML0604101192006-02-0303 February 2006 2006/02/03-Vermont Yankee - Technical Specification Proposed Change No. 263 Extended Power Uprate - Regulatory Commitment Information Regarding Potential Adverse Flow Effects BVY 05-105, Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages2005-12-12012 December 2005 Vermont Yankee Nuclear Power Station Correction to Technical Specifications Pages ML0526400902005-09-20020 September 2005 Technical Specifications, Drywell Spray Header and Nozzle Air Test Frequency BVY 05-083, Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information2005-09-10010 September 2005 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 - Supplement No. 32 Extended Power Uprate - Additional Information ML0522800592005-08-15015 August 2005 Tech Spec Pages for Amendment 226 Administrative Changes ML0519202762005-07-0707 July 2005 Tech Spec Pages for Amendment 225 Regarding Extend Intermediate Range Monitor Surveillance Test Frequencies ML0519202462005-06-30030 June 2005 Attachment 1 - Response to Request for Additional Information - Instrumentation Technical Specifications, Vermont Nuclear Power Station, Technical Specifications BVY 05-032, Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies2005-03-31031 March 2005 Vermont Nuclear Power Station - Response to Request for Additional Information Regarding Intermediate Range Monitor Surveillance Test Frequencies ML0509003992005-03-29029 March 2005 Technical Specification Pages Re Alternative Source Term ML0508004322005-03-16016 March 2005 TS Pages for Amendment 221 to License DPR-28, Relocating Current Definition of Surveillance Frequency to New Technical Specification (TS) Sections 4.0.2 and 4.0.3 and Revises Requirements for Missed Surveillance in TS Section 4.0.3 ML0435102452004-12-14014 December 2004 Technical Specification Pages, Elimination of Requirements for Hydrogen/Oxygen Monitors ML0514500312004-06-0909 June 2004 E-Mail from R. Ennis of USNRC to Various, Regarding State of Vermont Comments on EPU and AST ML0411202522004-04-14014 April 2004 Technical Specification Pages for Vermont Yankee Nuclear Power Station, License Amendment, Issuance of Amendment Implementation of Arts/Mellla 2019-09-11
[Table view] |
Text
Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.
185 Old Ferry Road tJ} Brattleboro, VT 05302-0500 March 4, 2004 BVY 04-025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Vcrmont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Technical Specification Proposed Change No. 263 - Supplement No. 6 Extended Power Uprate - Withhioltdin! Proprietary Information By letter dated January 31, 20041, Vermont Yankee2 (VY) supplemented its application for a license amendment to increase the maximum authorized power level for the Vermont Yankee Nuclear Power Station (VYNPS) from 1593 megawatts thermal (MWt) to 1912 MWt. The information provided oil January 31, 2004, consisted of VY's response to a draft NRC request for additional information (RAI).
Certain RAI responses contained proprietary information. Upon subsequent review of the information provided to the NRC staff, General Electric Company (GE) identified an instance where a response to one of the RAI questions contained proprietary information that was not properly marked proprietary and was not covered by an affidavit requesting disclosure protection in accordance with IOCFR2.790. VY immediately notified the NRC Project Manager for VYNPS of the oversight, and actions were taken to withdraw the identified proprietary information from public disclosure.
Thle subject proprietary information is contained within tile response to RAI EMCB-B I and is located on page 13 of 120 in Attachment I to the January 31, 2004 supplement. To remedy this situation, VY is providing three attachments to this letter.
Attachment I to this letter provides a replacement page 13 of Attachment I to the January 3 1, 2004 submittal. This revision clearly delineates the proprietary information within double brackets and by double underline. The proprietary information is also annotated with the superscript notation , which refers to Paragraph (3) of GE's attached affidavit (Attachment 3 to this letter).
Vermont Yankee letter to U.S. Nuclear Regulatory Commission, "Technical Specification Proposed Change No. 263, Supplement No. 5, Extended Power Uprate - Response to Request for Additional Information,"
BVY 04-008, January 31, 2004.
2 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. are the licensees of the Vermont Yankee Nuclear Power Station.
BVY 04-025 / Page 2 to this letter provides a replacement page 13 of Attachment 2 to the January 31, 2004 submittal. Attachment 2 is the non-proprietary version of Attachment I with the proprietary information removed. to this letter provides an affidavit by GE that constitutes a request for withholding the subject proprietary information from public disclosure.
Attachment I to this letter contains proprietary information as defined by 10CFR2.790. GE, as the owner of the proprietary information, has executed the affidavit which states that the enclosed proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The subject proprietary information was provided to VY in a GE transmittal that is referenced by the affidavit. The proprietary information has been faithfully reproduced in Attachment I to this letter such that the affidavit remains applicable. GE requests that the identified proprietary information be withheld from public disclosure in accordance with the provisions of I OCFR2.790 and I OCFR9.17.
This supplement to the license amendment request does not change the scope or conclusions in the original application, nor does it change VY's determination of no significant hazards consideration.
If you have any questions, please contact Mr. James DeVincentis at (802) 258-4236.
Sincerely, Jly V.! T yer W;Vice President STATE OF VERMONT )
)ss WINDHAM COUNTY )
Then personally appeared before me, Jay K. Thayer, who, being duly sworn, did state that he is Site Vice President of the Vermont Yankee Nuclear Power Station, that he is duly authorized to execute and file the foregoing document, and that the statements therein are true to the best of his knowledge and belief.
Sal A. Sandtrum, Notary Public My Commission Expires February 10, 2007 Attachments (3) cc: USNRC Region 1 Administrator (w/o attachments) PINQtAR\
USNRC Resident Inspector- VYNPS (w/o attachments) ,UilC USNRC Project Manager - VYNPS Vermont Department of Public Service (w/o proprietary information)
Docket No. 50-271 BVY 04-025 Attachment No. 3 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 Supplement No. 6 Extended Power Uprate - Withholding Proprietary Information GE Affidavit
General Electric Company AFFIDAVIT I, George B. Stramback, state as follows:
(1) I am Manager, Regulatory Services, General Electric Company ("GE") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld is contained in Enclosure I to GE letter GE-VYNPS-AEP-317, Michael Dick (GE) to Craig Nichols (ENOI), VYNPS Constant Pressure Power Uprate - Protection of GENE ProprietaryInfornation Not Identified in VY letter BVY 04-008, dated February 18, 2004. The Enclosure 1, RAI EMCB-BJ, proprietary information is delineated by a double underline inside double square brackets. In each case, the superscript notation 3 ) refers to Paragraph (3) of this affidavit, which provides the basis for the proprietary determination.
(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act, 18 USC Sec.
1905, and NRC regulations 10 CFR 9.17(a)(4), and 2.790(a)(4) for "trade secrets" (Exemption 4). The material for which exemption from disclosure is here sought also qualify under the narrower definition of "trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Project v. Nuclear Regulatory Commission, 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir. 1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
- c. Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, resulting in potential products to General Electric;
- d. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
GBS-04-02-Af GE-VYNPS-AEP-317 letter.doc Affidavit Page I
The information sought to be withheld is considered to be proprietary for the reasons set forth in paragraphs (4)a., and (4)b, above.
(5) To address 10 CFR 2.790 (b) (4), the information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in paragraphs (6) and (7) following.
(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information identified in paragraph (2), above, is classified as proprietary because it contains detailed information as contained in the proprietary reference NEDC-33090P, Safety Analysis Report for Vermont Yankee Nuclear Power Station Constant Pressure Powver Uprate, Class III (GE Proprietary Information), Revision 0, dated September 2003, which was submitted to the NRC. This power uprate report contains detailed results and conclusions from evaluations of the safety-significant changes necessary to demonstrate the regulatory acceptability for the power uprate of a GE BWR, utilizing analytical models, methods and processes, including computer codes, which GE has developed, obtained NRC approval of and applied to perform evaluations of the transient and accident events in the GE Boiling Water Reactor ("BWR"). The development and approval of these system, component, and thermal hydraulic models and computer codes was achieved at a significant cost to GE, on the order of several million dollars.
The development of the evaluation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GE's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of GE's comprehensive BWR safety and technology GBS-04-02-Af GE-VYNPS-AEP-3 17 letter.doc Affidavit Page 2
base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the extensive physical database and analytical methodology and includes development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
The research, development, engineering, analytical and NRC review costs comprise a substantial investment of time and money by GE.
The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
GE's competitive advantage will be lost if its competitors are able to use the results of the GE experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GE of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing these very valuable analytical tools.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information, and belief.
Executed on this 18th day of February 2004.
Gedge B. Stramback General Electric Company GBS-04-02-Af GE-VYNPS-AEP-317 letter.doc Affidavit Page 3
Docket No. 50-271 BVY 04-025 Attachment No. 2 Vermont Yankee Nuclear Power Station Technical Specification Proposed Change No. 263 Supplement No. 6 Extended Power Uprate - Withholding Proprietary Information (Non-Proprietary) Replacement Page 13 13 of 120
BVY 04-025 /Attachment 2 / Page I of I BVY 04-008 Attachment 2 - CPPU Submittal RAI Response Non-Proprietary Information EMCB-A 2 Section 10.7, "Plant Life," of Attachment 6 to your submittal dated September 10, 2003, identifies irradiation-assisted stress-corrosion cracking (IASCC) as a degradation mechanism influenced by increases in neutron fluence. This section indicates that the current inspection strategy for reactor internal components is expected to be adequate to manage any potential effects of CPPU. Note I in Matrix I of Section 2.1 of RS-OOl, Revision 0 indicates guidance on the neutron irradiation-related threshold for inspection for IASCC in BWRs is in Boiling Water Reactor Vessel and Internals Program (BWRVIP) report BWRVIP-26. The "Final License Renewal SER for BWRVIP-26," dated December 7, 2000, states that the threshold fluence level for IASCC is 5 x 1020 n/cm2 (E > I MeV). Identify the vessel internal components whose fluence at the end of period of operation with CPPU conditions will exceed the threshold level and become susceptible to cracking due to IASCC. For each vessel internals component that exceeds the IASCC threshold, either provide an analysis that demonstrates failure of the component will not result in the loss of the intended function of the reactor internals or identify the inspection program to be utilized to manage IASCC of the component. Identify the scope, sample size, inspection method, frequency of examination and acceptance criteria for the inspection programs.
Response
Of the reactor vessel internal components, only the top guide's integrated flux will exceed 5 x 1020 n/cm 2 .
VY will commence inspection of critical top guide components in the refueling outage following power uprate. Enhanced Visual Testing (EVT)-1 of top guide grid beams will be performed in accordance with SIL 554 following the sample selection and inspection frequency of BWRVIP-47 for the CRD guide tubes. In other words, VY will perform inspection of 10% of the total population of cells within twelve years, with one-half (5%) to be completed within six years. The six-year intervals at Vermont Yankee will be defined to be the same as those for the CRD guide tubes. Selection of the cells will be biased to the highest fluence areas in the top guide. However, Vermont Yankee reserves the right to modify the above inspection program should BWRVIP-26 be revised in the future.
EMCB-B I Section 3.5.1 of Attachment 4 of your submittal dated September 10, 2003, provides the results of the structural evaluation of the reactor coolant pressure boundary (RCPB) piping. Provide the basis for the disposition of the first system listed in this section.
Response
The Reactor Recirculation (RR) piping system is ((
)) is that for the RR system, there is no significant change in temperature, pressure and flow rate for the RR piping system resulting from CPPU.
For Vermont Yankee, the RR system is ((
)) since the temperature, pressure, and flow rate changes resulting from CPPU are insignificant.
The RR operating temperature will decrease slightly (by less than I percent). The RR operating pressure changes by less than I percent (RR pump suction pressure decreases by less than one percent and RR pump discharge pressure increases by less than one percent). The RR flow rate which increases slightly (by less than 2 percent) is acceptable since this system does not contain any fast closing valves. In summary, the temperature, pressure and flow rate changes are very minor and do not significantly impact the existing piping system qualification.
13 of 120