Text
-
o
. VERMONT YANKEE NUCLEAR POWER CORPORATION i
Ferry Road, Brattleboro. VT 05301-7002 REPtYTO ENGINEERING OFFICE 580 MAIN STREET BOLToN, MA 01740 (508) 779-6711 October 9,1996 BVY 96-118 United States Nuclear Regulatory Commission ATfN: Document Control Desk Washington,DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271) 4 (b) Letter, VYNPC to USNRC," Core Spray Inspection at Vermont Yankee," BVY 96-110, dated September 25,1996 j
Subject:
Core Spray System Inspection at Vermont Yankee In Reference (b) Vermont Yankee provided the NRC with its plans for performing Core Spray System inspections during our 1996 refueling outage. During several telephone conversations with your staff between September 30 and October 8,1996, we discussed the results of our inspections, answered your staff's questions and agreed to submit the inspection results and evaluations for NRC review. The purpose of this letter is to provide the requested information.
In summary, a total of 44 welds were inspected. As demonstrated in the attached engineering report, the Core Spray system integrity and performance are not compromised by these results.
We trust that the information provided is acceptable. However, should you have questions or require additional information, please contact this office.
l Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
[
[-James J. Duffy Licensing Engineer Attachments 170031 o\\
c: USNRC RegionI Administrator USNRC Project Manager-VYNPS USNRC Resident Inspector-VYNPS k