BSEP 10-0124, Reply to Notice of Violation: EA-10-032

From kanterella
(Redirected from BSEP 10-0124)
Jump to navigation Jump to search
Reply to Notice of Violation: EA-10-032
ML103200206
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/04/2010
From: Wills E
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 10-0124, EA-10-032, ir-10-404
Download: ML103200206 (3)


Text

Progress Energy NOV 0 2 010 SERIAL: BSEP 10-0124 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Reply to Notice of Violation: EA-10-032 Letter from Christopher G. Miller (NRC) to Michael J. Annacone, "Notice of Violation (Nuclear Regulatory Commission Office of Investigations Report No. 2-2009-013, Brunswick Steam Electric Plant Inspection Report 05000325/2010404 and 05000324/2010404," dated October 6, 2010

Reference:

Ladies and Gentlemen:

On October 6, 2010, the NRC issued Notice of Violation EA-10-032, to the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2, for a Severity Level IV violation pertaining to an access authorization matter. In the Notice of Violation, the NRC required a response within 30 days of the date of that letter (i.e., by November 5, 2010). In accordance with 10 CFR 2.201, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., has prepared a written response to the Notice of Violation. The response is provided as Enclosure 1 to this letter. contains information that has been determined sensitive to BSEP's physical protection. Therefore, CP&L requests that Enclosure 1 be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1). of this letter contains a new regulatory commitment.

Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant PO Box 10429 Southport, NC 28461C'

Document Control Desk BSEP 10-0124 /Page 2 Please refer any questions regarding this submittal to Mr. Lee Grzeck, Acting Supervisor -

Licensing/Regulatory Programs, at (910) 457-2487.

Sincerely, Edward L. Wills, Jr.

Plant General Manager Brunswick Steam Electric Plant WRM/wrm

Enclosures:

1. Response to Notice of Violation EA-10-032 (Security-Related Information Withhold Under 10 CFR 2.390)
2. List of Regulatory Commitments

Document Control Desk BSEP 10-0124 / Page 3 cc (with enclosures):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 cc (without enclosures):

U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510