Progress Energy JAN 1 182010 8 2010 SERIAL: BSEP 10-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931

Subject:

Steam Electric Plant, Unit Nos. 11 and 2 Brunswick Stearn Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Operating Test Outline for Licensed Operator Initial Examination 50-325/2010-301 and 50-324/2010-301

Reference:

Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep Waidrep (CP&L),

Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Bnmswick Examination 05000325/2010301 and 05000324/2010301,"

05000324/2010301, dated 4, 2009, ADAMS AccessioJ.

December 4,2009, Accessioa Number ML093380120 ML093380120

Dear Mr. Reyes:

In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-102l, Operator Licensing Examination Standards for Power Reactors,"

"Operator Reactors, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing the examination outline supporting the operating test which is scheduled to be administered during the weeks of April 55 and April 12, 2010, and the written examination scheduled to be administered during the week of April 19 19,, 2010, respectively.

In accordance with the schedule contained in the NRCs 4, 2009, a NRC's letter dated December 4,2009, copy of the outline for the operating test is being provided only to Mr. Rick Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance with 10 CFR 55.40(b)(3), Mr. Lenny Beller, as the designated authorized representative of the Brunswick Steam Electric Plant, Units 11 and 2, has approved the outlines for the examinations of the applicants. The systematic sampling process described in ES-40 ES-401,1, Attachment 1, was used to develop the examination outline.

In accordance with Revision 9, Supplement 1, ofNUREG-l of NUREG- 1021, Initial 021, Section ES-20 1, "Initial Operator Licensing Examination Process," Process, please ensure that the outline for the operating test is withheld from public disclosure in accordance with 1100 CFR 2.390 until after the examination is complete.

Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant PO P0 Box 10429 Southport, NC 28461

Mr. Luis A. Reyes, Regional Administrator BSEP 10-0001 I/ Page 2 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Bob Bolin, Nuclear Operations Training Instructor, at Belier, Superintendent - Operations Training, at (910) 457-3078, or Mr. Lenny Beller, (910) 457-2073.

Sincerely, Phyllis N. Mentel Manager - Support Services Brunswick Steam Electric Plant WRM/wrm

Enclosure:

Outline for Operating Test (Enclosure only oniy being sent to Chief Examiner)

Mr. Luis A. Reyes, Regional Administrator BSEP 10-0001 //Page Page 33 cc (with enclosure):

u.

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without enclosure):

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center NunnAtlanta 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road 2846 1-8869 Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike 20852-273 8 Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510

Progress Energy FEB 119 fEB 2010 9'2010 SERIAL: BSEP 10-0025 10-0025 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 11 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-3245 0-324 Operating Test and Written Examination Reference Materials for Licensed 50-325/2010-30 1 and 50-32412010-301 Operator Initial Examination 50-325/2010-301 50-324/2010-301

Reference:

Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),

Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Brunswick 05000324/201030 1, dated Examination 05000325/2010301 and 0500032412010301,"

4, 2009, ADAMS Accession Number ML093380120 December 4,2009, ML093380120

Dear Mr. Reyes:

In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors,"

"Operator Reactors, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing the examination reference materials supporting the operating test which is scheduled to be administered during the weeks of April 55 and April 12,2010, 12, 2010, and the written examination scheduled to be administered during theweek the week of April 19, 2010, respectively.

In accordance with the schedule contained in the NRCs NRC's letter dated December 4, 4,2009, 2009, a list of the examination materials and reference materials is provided in Enclosure 1.

Copies of Examiner Standard Forms and Checklists from ES-201 and ES-401 are provided in Enclosure 2. A copy of the written examination is provided in Enclosure 3. Copies of ofthe the simulator dynamic scenarios and Job Performance Measures (JPMs) are provided in Enclosure 4. Copies of the reference materials are provided in Enclosure 55 (i.e., on a CD-ROM).

Enclosures 2, 3, 4, and 55 are being provided only to Mr. Richard Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance with Revision 9, Supplement 1, of NUREG- 1021, Section ES-20 ofNUREG-1021, 1, Initial ES-201, "Initial Operator Licensing Examination Process, Process," please ensure that the examination materials and reference materials are withheld from public disclosure until after the examination is complete.

Progress Energy Progress Energy Carolinas, Carolinas. Inc.

Inc.

Brunswick Nuclear Brunswick Nuclear Plant Plant P0 Box 10429 PO Box 10429 Southport, NC 28461 Southport, NC 28461

Mr. Luis A. Reyes, Regional Administrator 10-0025 I/ Page 2 BSEP 10-0025 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Bob Bolin, Nuclear Operations Training Instructor, at (910) 457-3078, or Mr. Lenny Beller, Superintendent - Operations Training, at (910) 457-2073.

Sincerely,

~(f'1J.~

Phyllis N. Mentel Manager - Support Services Brunswick Steam Electric Plant WRM/wrm

Enclosures:

1. List of Examination Materials and Reference Materials
2. Examiner Standard Forms and Checklists
3. Written Examination Questions
4. Simulator Scenarios and Job Performance Measures (JPMs)
5. Reference Materials (CD-ROM)

Mr. Luis A. Reyes, Regional Administrator BSEP 10-0025 / Page 33 cc (with Enclosures 11 through 5):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without Enclosure 11 Only):

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 30303-893 1 U. S. Nuclear Regulatory Commission ATIN: OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road Southport, NC 28461-8869 2846 1-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510

BSEP 10-0025 Enclosure II Page 1I of2 List of Examinations Materials and Reference Materials The following documents, developed in accordance with NUREG-NUREG-I1021, 021, Revision 9, Operator Licensing Examination Standards for Power Reactors,"

Supplement 1, "Operator Reactors, are provided in Enclosure 2:

Form ES-301-1 Administrative Topics Outline Form ES-301-2 Roomlln-Plant Systems Outline Control Room/In-Plant Form ES-301-3 Operating Test Quality Checklist Form ES-301-4 Simulator Scenario Quality Checklist Form ES-301-5 Transient and Event Checklist Form ES-301-6 Competencies Checklist ES-40 1-6 Form ES-401-6 Written Examination Quality Checklist 3 provides the proposed written examination (i.e., 75 "common" common questions, 25 senior reactor operator (SRO) questions). provides the Simulator Dynamic Scenarios (5) and Job Performance Measures (i.e., Administrative, In-plant, and Simulator). 5 provides the following reference materials on two CD-ROMs:

Index of Provided Procedures Abnormal Operating Procedures (AOP)

(Al)

Administrative Instructions (AI)

Administrative Procedures (AP)

Alternate Safe Shutdown (ASSD)

Annunciator Procedures (APP)

Brunswick Big Notes Calibration Procedures (CAL)

Emergency Procedures (EM (EMG)

G)

Emergency Operating Procedures (EOP)

Engineering Procedures (ENP)

Environmental and Radiation Control Procedures (E&RC and EVC)

Fuel Handling Procedures (FH)

Fire Protection Procedures (FPP)

General Plant Procedures (GP)

Maintenance Procedures (MNT)

Measuring Test Equipment Procedures (MTE)

Nuclear Generation Group Procedures (NGGC)

Operating Procedures (OP)

Operating Instructions (01)

Operating Work Packages (OWP)

Periodic Tests (PT)

Plant Emergency Procedures (PEP)

Plant Surveillance Test Procedures (PST)

BSEP 10-0025 Enclosure 11 Page 2 0[2 of 2 Pre-Fire Plans (PFP)

Regulatory Procedures (LIC and REG)

Security Procedures (SEC)

System Descriptions (SD)

Training Procedures (TRN)

Technical Specifications Technical Specifications Bases Technical Requirements Manual Offsite Dose Calculation Manual (ODCM)

BSEP 10-0025 Enclosure 2 Examiner Standard Forms and Checklists

Progress Energy Michael J. Annacone Vice President Brunswick Brunswick Nuclear Nuclear Plant Plant MAR 042010 04 2010 SERIAL: BSEP 10-0039 10-0039 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center NunnAtlanta 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 30303-8931

Subject:

Brunswick Steam Electric Plant, Unit Nos. 11 and 22 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Preliminary License Applications for Reactor and Senior Reactor Operator Examinations

Reference:

Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),

Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Brunswick 05000325/201030 1 and 0500032412010301,"

Examination 0500032512010301 05000324/2010301, dated December 4, 2009, ADAMS Accession Number ML093380120 4,2009, ML093380120

Dear Mr. Reyes:

In a letter dated December 4,2009, 4, 2009, the NRC requested that Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests at least 30 days before the operating test which is scheduled to be administered during the weeks of April 55 and April 12, 2010, and the written examination scheduled to be administered during the week of April 19, 2010.

Enclosure 11 provides a list of applicants who are currently scheduled to participate in the upcoming license examinations. Enclosure 2 provides preliminary, unsigned license applications NRC Forms 398, "Personal Licensee, for each Personal Qualification Statement - Licensee,"

Certification of Medical applicant. Enclosure 33 provides signed NRC Forms 396, "Certification Examination by Facility Licensee,"Licensee, for each applicant.

CP&L requests that the enclosed information be withheld from public disclosure, in accordance with 10 CFR 2.390(a)(6), since disclosure of this information would constitute a clearly unwarranted invasion of personal privacy.

Progress Energy Carolinas, CaroHnas, Inc.

PO.

PC. Box Box 10429 Southport, Southport, NC NC 28461 T> 910.457.3698 T> 910467.3688

Mr. Luis A. Reyes, Regional Administrator 10-0039 / Page 2 BSEP 10-0039/

No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette Pope, Supervisor - Licensing/Regulatory Programs, at (910) 457-2184.

Sincerely,

~Michael J. Annacone WRM/wrm

Enclosures:

1. List of Applicants Scheduled for License Examinations (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))

Fonns 398, "Personal

2. Preliminary NRC Forms Personal Qualification Statement - Licensee" Licensee (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))

Certification of Medical Examination by Facility Licensee"

3. NRC Forms 396, "Certification Licensee (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))

Mr. Luis A. Reyes, Regional Administrator 10-0039 / Page 33 BSEP 10-0039/

cc (with enclosures):

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 20555-000 1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 u.

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without enclosures):

U. S. Nuclear Regulatory Commission OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road 2846 1-8869 Southport, NC 28461-8869 u.

U. S. Nuclear Regulatory Commission (Electronic Copy Only)