|
---|
Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:License-Operator
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0105, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments2015-12-21021 December 2015 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1252014-12-16016 December 2014 Initial Exam 2014-301 Draft RO Written Exam ML14350A1312014-12-16016 December 2014 Initial Exam 2014-301 Draft SRO Written Exam 2024-04-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs ML14350A1372014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator In-plant JPMs ML14350A1342014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator Scenarios ML14350A1312014-12-16016 December 2014 Initial Exam 2014-301 Draft SRO Written Exam 2024-04-02
[Table view] |
Text
Progress Energy JAN 1 182010 8 2010 SERIAL: BSEP 10-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931
Subject:
Steam Electric Plant, Unit Nos. 11 and 2 Brunswick Stearn Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Operating Test Outline for Licensed Operator Initial Examination 50-325/2010-301 and 50-324/2010-301
Reference:
Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep Waidrep (CP&L),
Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Bnmswick Examination 05000325/2010301 and 05000324/2010301,"
05000324/2010301, dated 4, 2009, ADAMS AccessioJ.
December 4,2009, Accessioa Number ML093380120 ML093380120
Dear Mr. Reyes:
In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-102l, Operator Licensing Examination Standards for Power Reactors,"
"Operator Reactors, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing the examination outline supporting the operating test which is scheduled to be administered during the weeks of April 55 and April 12, 2010, and the written examination scheduled to be administered during the week of April 19 19,, 2010, respectively.
In accordance with the schedule contained in the NRCs 4, 2009, a NRC's letter dated December 4,2009, copy of the outline for the operating test is being provided only to Mr. Rick Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance with 10 CFR 55.40(b)(3), Mr. Lenny Beller, as the designated authorized representative of the Brunswick Steam Electric Plant, Units 11 and 2, has approved the outlines for the examinations of the applicants. The systematic sampling process described in ES-40 ES-401,1, Attachment 1, was used to develop the examination outline.
In accordance with Revision 9, Supplement 1, ofNUREG-l of NUREG- 1021, Initial 021, Section ES-20 1, "Initial Operator Licensing Examination Process," Process, please ensure that the outline for the operating test is withheld from public disclosure in accordance with 1100 CFR 2.390 until after the examination is complete.
Progress Energy Carolinas, Inc.
Brunswick Nuclear Plant PO P0 Box 10429 Southport, NC 28461
Mr. Luis A. Reyes, Regional Administrator BSEP 10-0001 I/ Page 2 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Bob Bolin, Nuclear Operations Training Instructor, at Belier, Superintendent - Operations Training, at (910) 457-3078, or Mr. Lenny Beller, (910) 457-2073.
Sincerely, Phyllis N. Mentel Manager - Support Services Brunswick Steam Electric Plant WRM/wrm
Enclosure:
Outline for Operating Test (Enclosure only oniy being sent to Chief Examiner)
Mr. Luis A. Reyes, Regional Administrator BSEP 10-0001 //Page Page 33 cc (with enclosure):
u.
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without enclosure):
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center NunnAtlanta 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road 2846 1-8869 Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike 20852-273 8 Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510
Progress Energy FEB 119 fEB 2010 9'2010 SERIAL: BSEP 10-0025 10-0025 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 11 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-3245 0-324 Operating Test and Written Examination Reference Materials for Licensed 50-325/2010-30 1 and 50-32412010-301 Operator Initial Examination 50-325/2010-301 50-324/2010-301
Reference:
Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),
Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Brunswick 05000324/201030 1, dated Examination 05000325/2010301 and 0500032412010301,"
4, 2009, ADAMS Accession Number ML093380120 December 4,2009, ML093380120
Dear Mr. Reyes:
In accordance with the guidelines in Revision 9, Supplement 1, ofNUREG-1021, Operator Licensing Examination Standards for Power Reactors,"
"Operator Reactors, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is providing the examination reference materials supporting the operating test which is scheduled to be administered during the weeks of April 55 and April 12,2010, 12, 2010, and the written examination scheduled to be administered during theweek the week of April 19, 2010, respectively.
In accordance with the schedule contained in the NRCs NRC's letter dated December 4, 4,2009, 2009, a list of the examination materials and reference materials is provided in Enclosure 1.
Copies of Examiner Standard Forms and Checklists from ES-201 and ES-401 are provided in Enclosure 2. A copy of the written examination is provided in Enclosure 3. Copies of ofthe the simulator dynamic scenarios and Job Performance Measures (JPMs) are provided in Enclosure 4. Copies of the reference materials are provided in Enclosure 55 (i.e., on a CD-ROM).
Enclosures 2, 3, 4, and 55 are being provided only to Mr. Richard Baldwin, the assigned NRC chief examiner, with his copy of this letter. In accordance with Revision 9, Supplement 1, of NUREG- 1021, Section ES-20 ofNUREG-1021, 1, Initial ES-201, "Initial Operator Licensing Examination Process, Process," please ensure that the examination materials and reference materials are withheld from public disclosure until after the examination is complete.
Progress Energy Progress Energy Carolinas, Carolinas. Inc.
Inc.
Brunswick Nuclear Brunswick Nuclear Plant Plant P0 Box 10429 PO Box 10429 Southport, NC 28461 Southport, NC 28461
Mr. Luis A. Reyes, Regional Administrator 10-0025 I/ Page 2 BSEP 10-0025 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Bob Bolin, Nuclear Operations Training Instructor, at (910) 457-3078, or Mr. Lenny Beller, Superintendent - Operations Training, at (910) 457-2073.
Sincerely,
~(f'1J.~
Phyllis N. Mentel Manager - Support Services Brunswick Steam Electric Plant WRM/wrm
Enclosures:
- 1. List of Examination Materials and Reference Materials
- 2. Examiner Standard Forms and Checklists
- 3. Written Examination Questions
- 4. Simulator Scenarios and Job Performance Measures (JPMs)
- 5. Reference Materials (CD-ROM)
Mr. Luis A. Reyes, Regional Administrator BSEP 10-0025 / Page 33 cc (with Enclosures 11 through 5):
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without Enclosure 11 Only):
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 30303-893 1 U. S. Nuclear Regulatory Commission ATIN: OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road Southport, NC 28461-8869 2846 1-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510
BSEP 10-0025 Enclosure II Page 1I of2 List of Examinations Materials and Reference Materials The following documents, developed in accordance with NUREG-NUREG-I1021, 021, Revision 9, Operator Licensing Examination Standards for Power Reactors,"
Supplement 1, "Operator Reactors, are provided in Enclosure 2:
Form ES-301-1 Administrative Topics Outline Form ES-301-2 Roomlln-Plant Systems Outline Control Room/In-Plant Form ES-301-3 Operating Test Quality Checklist Form ES-301-4 Simulator Scenario Quality Checklist Form ES-301-5 Transient and Event Checklist Form ES-301-6 Competencies Checklist ES-40 1-6 Form ES-401-6 Written Examination Quality Checklist 3 provides the proposed written examination (i.e., 75 "common" common questions, 25 senior reactor operator (SRO) questions). provides the Simulator Dynamic Scenarios (5) and Job Performance Measures (i.e., Administrative, In-plant, and Simulator). 5 provides the following reference materials on two CD-ROMs:
Index of Provided Procedures Abnormal Operating Procedures (AOP)
(Al)
Administrative Instructions (AI)
Administrative Procedures (AP)
Alternate Safe Shutdown (ASSD)
Annunciator Procedures (APP)
Brunswick Big Notes Calibration Procedures (CAL)
Emergency Procedures (EM (EMG)
G)
Emergency Operating Procedures (EOP)
Engineering Procedures (ENP)
Environmental and Radiation Control Procedures (E&RC and EVC)
Fuel Handling Procedures (FH)
Fire Protection Procedures (FPP)
General Plant Procedures (GP)
Maintenance Procedures (MNT)
Measuring Test Equipment Procedures (MTE)
Nuclear Generation Group Procedures (NGGC)
Operating Procedures (OP)
Operating Instructions (01)
Operating Work Packages (OWP)
Periodic Tests (PT)
Plant Emergency Procedures (PEP)
Plant Surveillance Test Procedures (PST)
BSEP 10-0025 Enclosure 11 Page 2 0[2 of 2 Pre-Fire Plans (PFP)
Regulatory Procedures (LIC and REG)
Security Procedures (SEC)
System Descriptions (SD)
Training Procedures (TRN)
Technical Specifications Technical Specifications Bases Technical Requirements Manual Offsite Dose Calculation Manual (ODCM)
BSEP 10-0025 Enclosure 2 Examiner Standard Forms and Checklists
Progress Energy Michael J. Annacone Vice President Brunswick Brunswick Nuclear Nuclear Plant Plant MAR 042010 04 2010 SERIAL: BSEP 10-0039 10-0039 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center NunnAtlanta 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 30303-8931
Subject:
Brunswick Steam Electric Plant, Unit Nos. 11 and 22 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Preliminary License Applications for Reactor and Senior Reactor Operator Examinations
Reference:
Letter from Malcolm T. Widmann (NRC) to Benjamin C. Waldrep (CP&L),
Brunswick Steam Electric Plant - Notification of Licensed Operator Initial "Brunswick 05000325/201030 1 and 0500032412010301,"
Examination 0500032512010301 05000324/2010301, dated December 4, 2009, ADAMS Accession Number ML093380120 4,2009, ML093380120
Dear Mr. Reyes:
In a letter dated December 4,2009, 4, 2009, the NRC requested that Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests at least 30 days before the operating test which is scheduled to be administered during the weeks of April 55 and April 12, 2010, and the written examination scheduled to be administered during the week of April 19, 2010.
Enclosure 11 provides a list of applicants who are currently scheduled to participate in the upcoming license examinations. Enclosure 2 provides preliminary, unsigned license applications NRC Forms 398, "Personal Licensee, for each Personal Qualification Statement - Licensee,"
Certification of Medical applicant. Enclosure 33 provides signed NRC Forms 396, "Certification Examination by Facility Licensee,"Licensee, for each applicant.
CP&L requests that the enclosed information be withheld from public disclosure, in accordance with 10 CFR 2.390(a)(6), since disclosure of this information would constitute a clearly unwarranted invasion of personal privacy.
Progress Energy Carolinas, CaroHnas, Inc.
PO.
PC. Box Box 10429 Southport, Southport, NC NC 28461 T> 910.457.3698 T> 910467.3688
Mr. Luis A. Reyes, Regional Administrator 10-0039 / Page 2 BSEP 10-0039/
No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette Pope, Supervisor - Licensing/Regulatory Programs, at (910) 457-2184.
Sincerely,
~Michael J. Annacone WRM/wrm
Enclosures:
- 1. List of Applicants Scheduled for License Examinations (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))
Fonns 398, "Personal
- 2. Preliminary NRC Forms Personal Qualification Statement - Licensee" Licensee (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))
Certification of Medical Examination by Facility Licensee"
- 3. NRC Forms 396, "Certification Licensee (Personal Privacy Information - Withhold in Accordance with 10 CFR 2.390(a)(6))
Mr. Luis A. Reyes, Regional Administrator 10-0039 / Page 33 BSEP 10-0039/
cc (with enclosures):
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 20555-000 1 Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Malcolm T. Widmann Chief, Operations Branch Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 u.
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Rick Baldwin Senior Operations Engineer Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 30303-893 1 Atlanta, GA 30303-8931 cc (without enclosures):
U. S. Nuclear Regulatory Commission OBryan, NRC Senior Resident Inspector ATTN: Mr. Philip B. O'Bryan, 8470 River Road 2846 1-8869 Southport, NC 28461-8869 u.
U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mrs. Farideh E. F. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike 20852-273 8 Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 27626-05 10 Raleigh, NC 27626-0510