BSEP-97-0052, Forwards Rev 2 to NF-908.02, Brunswick Unit 1,Cycle 11 Neutronics Startup Rept
| ML20134J307 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/05/1997 |
| From: | Turkal M CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134J310 | List: |
| References | |
| BSEP-97-0052, BSEP-97-52, NUDOCS 9702120082 | |
| Download: ML20134J307 (3) | |
Text
_
CP&eL Carolina Power & Light Company P.O. Box 1o429 Southport, NC 28461-0429 February 6,1997 SERIAL: BSEP 97-0052 U. S. Nuclear i latory Commission ATTENTION: Document Control Desk Washington, DC 20S55 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 DOCKET NO. 50-325/ LICENSE NO. DPR-71 CYCLE 11 STARTUP TEST REPORT Gentlemen:
In accordance with Technical Spacification 6.9.1.3 for the Brunswick Steam Elec1c Plant, Unit 1, Carolina Power & Light Company (CP&L) hereby submits the Cycle 11 Gtartup Report (provided in Enclosure 1).
Brunswick Technical Specification 6.9.1.1 states that a startup report should be submitted following the "(3) installation of a fuel that has a different design or has been manufactured by a different fuel supplier, and (d) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant." Based on this requirement, the enclosed report is being submitted due to the loading of the new GE13 fuel type for Cycle 11 operation and the change in the maximum licensed power level from 2436 to 2558 Megawatts (thermal). The enclosed report satisfies the requirement of Specification 6.9.1.3 to submit a startup report within 90 days following resumption of commercial operation.
n accordance with Technical Specification 6.9.1.2, the enclosed stwtup report addresses tests identified in Section 14.4.1 of the Updated Final Safety Analysis Report. At present, Unit 1 Cycle 11 operation has been limited to 95 percent of reactor power. As a result, the startup testing program has not been completed. Therefore, in accordance with Technical Specification 6.9.1.3, CP&L will submit a supplemental report every three months following issuance of this report until the startup testing has been completed.
Please refer any questions regarding this submittal to Mr. Tony Harris at (910) 457 3312.
Sincerely, b
74 G
[.
y ark A. Turkal Supervisor-Licensing
\\
2]g Brunswick Nuclear Plant y
9702120082 970205 PDR ADOCK 05000325' P
l i
i i
Document Control Desk BSEP 97-0052 / Page 2 i-KAH/kah Enclosures t
cc:
U. S. Nuclear Regulatory Commission ATTN.: Mr. Luis A. Reyes, Regional Administrator i
101 Marietta Street, N.W., Suite 2900 i
Atlanta, GA 30323-0199 l
Mr. C. A. Patterson
(
NRC Seniv Resident inspector - Brunswick Units 1 and 2:
(
U.S. Nuclear Regulatory Commission ATTN.: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22)
{
11555 Rockville Pike l
l Rockville, MD 20852-2738 The Honorable J. A. Sanford Chairman - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 i
l l
1 1
I.
i 1
J
ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 UNIT 1 B111R1 STARTUP TEST REPORT i