BSEP-92-0005, Special Rept 2-SR-92-005:on 920706,fire Barrier Penetration Seal in Reactor Bldg ECCS Piping Room Declared Inoperable. LCO Expected to Expire Before Repairs Completed.Fire Watch Established & Remains in Place Pending Replacement of Seal

From kanterella
(Redirected from BSEP-92-0005)
Jump to navigation Jump to search
Special Rept 2-SR-92-005:on 920706,fire Barrier Penetration Seal in Reactor Bldg ECCS Piping Room Declared Inoperable. LCO Expected to Expire Before Repairs Completed.Fire Watch Established & Remains in Place Pending Replacement of Seal
ML20099G179
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/10/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-SR-92-005, 2-SR-92-5, B9-13510C, BSEP-92-0005, BSEP-92-5, NUDOCS 9208140142
Download: ML20099G179 (1)


Text

.

CP&L barolint Pcwer & la t Company

=======.-s

i Brunswick Nuclear Project P. O. Box 10429 Southport, N.C.

28461-0429

~

AUG 101992 FILE:

B09-33510C'

' SERIAL:

BSEP-92-0005

]

U.S. Nuclear Regulatory Commission

= ATTN: Document Control Desk Washington, D.

C.

20555 BRUNSidICK STEAM ELECTRIC PLANT UNIT 2 LOCKET NO. 50-324 LICENSE NO. DPR-62 SPECIAL REPCRT PER TECHNICAL SPECIFICATION 3.7.8A AND PUR$UANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-92-005)

Gentlemen!

The following fire protection Limiting Condition for. Operation informational '

summary is the result of a major outage project being performed in ^;he Unit 2 Reactor-Building.

With Unit-2 in Cold Shutdown to support the Unit outage started on April 21, 1992,:2. Flexible boot seal.(fire seal) Jas to be removed to support inspections

'and repairs to the High Pressure Coolant Injection (HPCI)' steam line supports.

At 0130 on July 6,-1992, this fire barrier penetration seal (R2-2-054) in the Unit 2 Reactor Building Emergency Core Cooling System piping pseetration room was declared inoperable.

The seven day. Technical Specifica'* u Fire -' Barrier Penetrations Limiting Condition for _ Operation (LCO) was expectcl a expire prior to completion of the HPCI steam line repairs and would require the submission of this Special Report.-

As the fire. detectors on at least one side of the penetration were operable an hourly fire watch was stationed and remains in place pending replacement of the seal.

The'LCO-expired on July 13, 1992, with the repairs expected to continue into August of 1992.

Very truly your,

&}.

J.

. Speacer, eral Manager c swict. Na lear Project cc t -

Mr.'S, D.

Ebneter Mr. R. H. Lo

~BSEP NRC Resident Office 9200140142 920810 PDR :ADOCK- 05000324 9