Text
e.-
CP&L CO' PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 10/06/86 APPENDIX D -- AVER AGE DAILY POWER LEVEL RPD39 RUN TIME 11:42:55 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 SEPTENDER 1906 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL
( MWE-- NE l )
(MWE-NEr) 1 775 17
-14 2
765 18
-14 3
771 19
-15 4
~l 73 20
-15 5
759 21 291 6
740 22 598 7
772 23 575 8
77i 24 626 Y
//d 25 756 10 772 26 767 l.
1i 77) 27 750 12 770 20 766 l
l 13 337 29 797 14
-13 30 766 l
15 13 16
-i 4 l
l i
1.i6 - 8 1k
[h05000324 860930
\\
R PDR
s
( (CPkL[ij0'.
PLANT-PERFORMANCE DATA SYSTEMJ
'PAGE-11 LRUN:DATE-110/06/86 OPERATING. DATA REPORT RPD36~~
RUN> TIME 11142:58' BRUNSWICK UNIT i A
-DOCKET:NO.' 050-0325:
COMPLETED BY< FRANCES HARRISON:
LOPERATING-STATUS; TELEPHONE -(919)457-9521.
i
- 1.
- UNIT-NAME: BRUNSWICK: UNIT i' I NOTES
.I 12;. REPORTING-PERIOD: SEPTEMBER 86
(
l
.3.. LICENSED THERMAL POWER'(MWT)- 2436-I-
l' 4.1NAMEPLAIE-RAi1NL-GRUSS~MWE). '867.0 1;
il '
%.' DESIGN ELECTRICAL ~ RATING-(NET MWE)- 821.0
- l
1 i -
6.. MAX. DEPENDABLE CAPACITY- (GROSS: MWE) '.815.0 'l.
I 7.' MAX DEPENDADLE CAPf$U1fY.(NET MWE)' 790.0
- - - - ~ - - - - - - - - - - - - - - - - -
~8.
IF' CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU.7) SINCE LAST REPORTi GIVE. REASONS:
9; POWER LEVEL.TO'WHICH RESTRICTED IF ANY (NET MWE) 4
- 10. REASONS FOR RESTRICI1UN.1F ANY:
THIS YR TO-CUMUL' l
MONTH DATE ATIVE j -
- 11. HUUMS.1N REPORTING PERIOD 720.00 6551.00 83616.00
- 12. NUMBER-OF HOURS REACTOR CRITICAL 606.63 6160.26 529(7i.'/4' 11 3. REACTOR ^ RESERVE SHUTDOWN. HRS
.00
.00
- i647.'10' i -
14.' HOURS 1 GENERATOR ON LINE 535.08 5954.41 50091.79--
15.~ UNIT RESERVE SHUTDOWN HOURS
.00
.00-
.00 16.-~ GROSS, THERMAL ENERGY GEN. (MWH) 1243447.43 14087690.06 104194353.71 1 7_.
GROSS ELEC. ENERGY GEN. (MWH) 404790.00 4606379.00 34357652.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 309295.00-4462824.00 33021521.00-19.. UNIT SERVICE FACTOR 74.32 90.09 59.91 20'. UNIT AVAILABILITY-FACIOR 74.32 90.89 59.91
- 22. UNIT CAP. FACTOR (USINL, DER NET) 65.86 02.90 40.10-
.23. UNIT FORCED 0UTAGE RATE 25.68 9.11
- 18. G3-
- 24 SHUTDOWNU SCHED. DVER NEXT 6' MONTHS (TYPE, DATE, AND DURATION OF EACH) i
- 25..IF UHulDUWN AI END OF REPURT Ph.R 1 uD, ESIIMATED DATE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMliERCI AL OPERATION)
FORCAST ACHEIVED
' INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4
[
1.16 - 9 m.
n:
w DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: October 1986 COMPLETED BY: ~ Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1
- Brunswick Unit 1 operated at a 74.32 percent availability factor for the month of September with a 68.44 percent capacity factor. The~re were four power reductions and one off-line outage. Details are in the Unit Shutdowns and Power Reductions sheet; also, one SRV Failure / Challenges Report.
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.
n i
a-s /
SRV FAILURE / CHALLENGES REPORT DATE:
9/13/86'
~ TIME OF OCCURRENCE:
1058
-DETAILS 0F SRV's FAILURE:
At time of scram, A, C, D, E, and L SRVs opened.
Additionally, A, E,~~J, B, F,-and D were lifted manually to control pressure.
The sonics for A and L apparent 1y'did not work.
I I
I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
~050-0325 UNIT NAME Brunswick T DATE ner-tor 6 REPORT MONTH Sept. 1986 COMPLETED 8Y F
=no=.
um or TELEPHONE 919-457-9571-
~
=
u, :
C 52 f5X licerisce
,EW Cause & Correceive l
N" DJ'c r-W?
4 2EE Event sT
- o. ?
Action to
[@
E jdg Report e N0
[0 Prevent Recurrence 6
86-050 860902 S
00 B
5 N/A Control rod improvement I
2 3
4 F: Foiced Reason:
Method:
Exhibis G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Even Report (LER) File (NUREG-D-Regulatory Restriction 0161)
I E-Operator Training & License Examination is-Con t inua t ions F Administrarive 5-Load Reductions s
G Operational Error (Explain) 6-Other Eshibis 1 Same Source lis/77) 11 Other (E splain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswtek I DATE oce. 1986 REPORT MONTH ept. 1986 COMPLETED 8Y Franca = n erienn S
TELEPHONE o 1o-A s7-o s9 i l
=uE E
=_
N.,
p.n c i
5i j
i!d lc"Sec 5%
$"g L
Cause & Correceive Event g7 gO gy,,on,,
c 3.2
-2 5 3 oc yGj Repine e in U o
Prevent Recurrence O~
U d
86-051 860905 S
00 B
5 N/A MSIV.and turbine valve testing.
PT-14.I, Control Rod Operability Test
~
l s
~
a sw.
~
I 3
4 F: Forced
- Reason:
S: Scheduled A Equipment Failure (Explain)
~
Method:
Exhibit G -Instructions I-Manual for Preparation of Daia B Maintenance of Test 2-Manual Scram.
Eniry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulator) Restriction 016))
E Operator Training & Ucense Examination 4-Continuations F Administrative 5-Load Reductions s
1 i
G-Operational Es ror (Explain)
(,-Other Exhibii I. Same Source l'3/77) ll Olher (Explain)
?
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNITNAME Brunswick T DATE ner. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Francee umerieny TELEPHONE 9.1o-A u-oe i 3
c
=-
1 kE
[
? 53 li"'
51
$"y.
Cause & Correceive parc Even g
o.
C 5:
0 E E a:
a x
.x m =
Report e us y Ev g
g Prevent Recurrence 4
e 0
86-054 860913 F
184:55 A
I LER l-86-024 Turbine generator voltage regulator forced outage l
l l
l I
2 3
4 F: Forced Reason-Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuatiens F.Administ rative 5-Load Reduetions s
G Operational Error (Explain) 6-Other Exhibit I Same Source t'8/77 )
Il-Other (E xplain t
a 2
~.
UNIT SHUTDOWNS AND POWER REDUCDONS DOCKET NO. 050-0325 UNITNAME Brunswick I DATE oce. 1986 REPORTMONT;l Sept. 1986 COMPLETED BY Francoe Hnerienq TELEPHONE 414-ta7-ou t
~.=
1
[?
'h 5' h Licensee
[%
g4 Cause & C: rrective N"
DJ f c i
.3'?
4
.;5 55 Event ay
- o. ?
. Acta,,, to jE j @g Report
- NO Prevent Recurrence i
c5 s86-056 860924 S
00 B
5 N/A Rod improvement 6
l 4
l p
i i
2 3
4 F Forced.
Reason:
Method:
Exhibit G. Instructions S.- Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161)
E-Operate.r Training & License Examination 1s-Continuat. ions F-Administrative 5-Load Reductions s
G-Operational Error (Explain) 6-Other Exhibit I. Same Source i
til/77)
Il-Other (Explain i
,i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick I DATE Oct. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-95?1 I
5 u. =
g"?
=-
y' '
I)r y
j;
{
7jg Licensee gg Cause & Corres-tive 2:
4
.2 3 oc Evens s?
o.
Action to
$E E
j@g Report e rNG O
prevent Recurrence c5 86-057 860927 S
00 B
5 N/A Routine valve testing I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Inst ructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161)
E-Operator Training & License Examination Is-Con t inua t ions F-Administ rative 5-Load Reductions
.s s
G-Operational Ee ror (Explain) 6-Other Exhibit I Same Source 19/77)
Il-Oiher (E xplain)
. ~. -
- CP',L CO
. PLANT' PERFORMANCE DATA SYSTEM PAGE 2
j -
'RUtrDATE
.10/06/86 APPENDIX B - AVERAGE-DAILY POWER LEVEL RPD39
<RUN TIME 11~ 42:55 BRUNSWICK UNIT 2 t
DOCXEl NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 3,
SEPTEMBER 1986 DAY AVO. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL
-(tiWE-NET)
(MWE-NEI) 1 764 17 760 2
762 18 76i 3
'759 19 760 4
741 20 753 5
762 21
-75S 4
6 691 22 756 7
762 23 757 0
761 24 756 9
761 25 754 e
10 760 26 754 ii 757 27 752 i
12-756 28 746 i
13 747 29 751 14 759 30 747 l
15 760 16
/S7 i
t i
i 1.16 -a
C'P&L CO
~ PLANT PERFORMANCE DATA SYSTEM PAGE 2
RUN DATE iO/06/86 OPERA!1N(s DA1A REl'UR I RPD36 RUN TIME ii 42:58 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS IELEPHONE (919)457-9521 1.
UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2.
REPORTING P2R10D-SEPTEtiBER 86 i
j 3.
LICENSED THERMAL POWER (MWT) 2436 1
1-4.
NAMEPLATE RATING (GROSS MWE) 36/.0 l
1
-5.
DESIGN ELECTRICAL. RATING (NET MWE) 821.0 1
1 6.
MAX del'ENDAULE CAPAUllY (GRUSS MWE). 815.0 I i
/. r1AX~ DEPENDABLE CAPACITY iNET MWE) 790.0 8.
IF CHANGES OCCUR IN CAPAL11Y RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS-9.
POWER LEVEL T O WilICH RESTRIC TED IF ANY (NEI MWE)
- 10. REASONS FUR RESTRICTION IF ANY THIS YR TO CUMUL (1UN I H DALE A~ LIVE 1i. HOURS IN REPORTING PERIOD
'720.00 6551.00 95640.00
- 12. nun U t;R UE HUURS REACIUR CRITICAL 720.00 2381.74 56094.10
- 13. REAUluR RESLHVE SHUTDOWN llRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 720.00 2237.66 53248.75
- 15. UNIT RESERVE SHUIDUWN HOURS
.00
.00
.00
- 16. GRUSS THERMAL ENERGY GEN. (MWH) 174 ~/ 0 05. 56 5167592.03 103997464.56
- 97. GROSS ELEC. ENERGY GEN. (MWH) 36146b.00 1651Ub/.UU 6444/341.00
- 18. NE T ELEC. ENERGY GENERATED (MWh) 543400.00 iS64745.00 33002744.00
- 19. UNIT SERVICE FACTOR 100.00 34.16 35.60
- 20. UNIT A AIL ABILITY F ACTOR 100.00 34.16 55.6u
- 22. UNIT CAP. FACTOR (USING DER NET) 91.93 29.09 42.03
- 23. UNIT FORCED OUTAGE RATE
.00 9.91 45.26
- 24. SHUTDOWNS SCHED. UVER NEXT 6 tiUN1HS (1YPE, DATE, AND DURATION OF EACH)
Scheduled maintenance outage October 25 through November 14.
- 25. IF SHUIDOWN AT END OF REPORT PERIOD, ESTIMA'IED DATE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL. OPERATION)
FORCAST ACHEIVED INiilAL UHillCAL11Y
- - - - ~
INI TI Al. ELECTRIClTY C u ttri L R U I A L Ol'LG A i 1 UN 1.16 - 9 l
1
f --
DOCKET NO.: 050-0324
-UNIT: Brunswick 2 DATE: October 1986 COMPLETED BY: Frances Harrison i
OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 Brunswick Unit 2. operated at a 95.53' percent capacity factor and a 100 percent-availability factor. There were four power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.
LThere'are 856 BWR and 144 PWR spent fuel bundles in~the Brunswick Unit 2 fuel' pool.
UNIT SHUTDOWNS AND POWER REDUCTIONS OOCKETNO. -050 032=
UNIT NAME Prunswick ii DATE n,r.
ions COMPLETED BY re=.
-. u.
.,ean REPORT MONTH Sept. 198r, TELEPHONE o io z ei_oe 9 i I
_E 4
[?
d 5' E Licensee je, Cause & Correceive
=
W D sic c-E?
4 1EE Event s?
- o. 3 Action to j@
jdg Report e
<N0
[U Prevent Recurrence 6
86-026 860906 S
00 B
5 N/A Debris filter backwash and routine valve testing I
l l
1 1
2 3
4 F: Forced Reason :
Method:
Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Resiriction 0161) le-Con t i nua t. cons E-Operator Training & License Examination
(
F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other E xhibii I - Same Source
('8/77 )
Il Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brimavick TT DATE noe ions REPORT MONTH Sept. 1986 COMPLETED BY c--~
ee u-ri m TELEPHONE g ig_4 57_953 i I
(2E i j.3d l#"5""
5 *.
$"7
=_
-a Cause & Correceive i
lbsc i'
Evens 7
a.
5
-3 5 = ec g
C Report e v3 y Ev
= m :g g
Prevent Recurrence o
x 7
C 86-027 860913 S
00 B
5 N/A Routine valve t'esting i
i l
I 2
3 4
F: Forced Reason Method:
Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulator) Resariction 01611 E Operaior Training & License Examination 4-Continuat. sons s
F Administrative 5-Load Reductions s
l G-Operational Error (Explain) 6-Other E shibis 1 - Same Source 08/77)
Il-Other (E xplain t
UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO. 050-0325 Brunswick II UNIT NAME DATE Oct. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE '919-457-957I I
2 5 w :N b*"5##
E'.
=_
L Cause & Coreettive 8"i 2:
E 2
N" Dak i
5i i
2i5 Event u7 a
Action to 3:
E jgg Report e
<E U U
Prevent Recurrence 6
1 1
86-028 860928 S
00 B
5 N/A Control ron operability PT-I4.1, and routine valve testing i
2 i
.I i
i 1
I i.
i l
f 1
2 3
4 F: Forced
- Reason.
Method:
Exhibit G. Instrut-tions S Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File INUREG-D Regulatory Restriction 0161)
E-Operator Training & Ucense Examination 1s-Con t i nua t.ons
\\
F Administrative 5-Load Reductions 5
G-Operational Error (Explaini 6-Other Exhibit I. Same Source 19/77) 11-O:her (E xplaini
4 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
"'""8"lCk ' I_
UNIT NAME UC'-
IN DATE REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-957i i
I E
c I
! ~;
'h
- !* E Licensee h
f%
Cause & Currective N"
DJir i
3?
?
255 Event p
o.'8 Actron en jU j
f:
5 jgg Report e mO Prevent Recurrence 6
86-029 860930 S
00 B
5 N/A Reduced power to perform debris filter backwash i
1 l
~
I 2
3 4
1 F: Forced
- Reason:
Method-Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Shecis for Licensee C Refueling 3 Autoniatic Scram.
Event Report (LER) File INURECr D. Regulatory Restriction 0161)
E-Operator Training & License Ex.inination 1s-Continuations l
\\
F Adnunistrative 5-Load Reductions 3
G Operational Error (Explain)
(,-Other Eshibit I-Same Source 19/77) ll Other (E xplaini
/ >.
Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 October 7, 1986 FILE: B09-13510C SERIAL: BSEP/86-1423 Mr. R. M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT
Dear Mr. Scroggins:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of September 1986.
Very truly yours,
- e. 5 :
C. R. Die $
tz, General Manager Brunswick Steam Electric Plant FH/ cab MSC/85-0014 Enclosures cc: