Monthly Operating Repts for Sept 1986
ML20207F698
Person / Time
Site: Brunswick  
Issue date: 09/30/1986
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
BSEP-86-1423, NUDOCS 8701060194
Download: ML20207F698 (17)


Text

e.-

CP&L CO' PLANT PERFORMANCE DATA SYSTEM PAGE i

RUN DATE 10/06/86 APPENDIX D -- AVER AGE DAILY POWER LEVEL RPD39 RUN TIME 11:42:55 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 SEPTENDER 1906 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL

( MWE-- NE l )

(MWE-NEr) 1 775 17

-14 2

765 18

-14 3

771 19

-15 4

~l 73 20

-15 5

759 21 291 6

740 22 598 7

772 23 575 8

77i 24 626 Y

//d 25 756 10 772 26 767 l.

1i 77) 27 750 12 770 20 766 l

l 13 337 29 797 14

-13 30 766 l

15 13 16

-i 4 l

l i

1.i6 - 8 1k

[h05000324 860930

\\

R PDR

s

( (CPkL[ij0'.

PLANT-PERFORMANCE DATA SYSTEMJ

'PAGE-11 LRUN:DATE-110/06/86 OPERATING. DATA REPORT RPD36~~

RUN> TIME 11142:58' BRUNSWICK UNIT i A

-DOCKET:NO.' 050-0325:

COMPLETED BY< FRANCES HARRISON:

LOPERATING-STATUS; TELEPHONE -(919)457-9521.

i

1.
UNIT-NAME: BRUNSWICK: UNIT i' I NOTES

.I 12;. REPORTING-PERIOD: SEPTEMBER 86

(

l

.3.. LICENSED THERMAL POWER'(MWT)- 2436-I-

l' 4.1NAMEPLAIE-RAi1NL-GRUSS~MWE). '867.0 1;

il '

%.' DESIGN ELECTRICAL ~ RATING-(NET MWE)- 821.0

- l

1 i -

6.. MAX. DEPENDABLE CAPACITY- (GROSS: MWE) '.815.0 'l.

I 7.' MAX DEPENDADLE CAPf$U1fY.(NET MWE)' 790.0

- - - - ~ - - - - - - - - - - - - - - - - -

~8.

IF' CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU.7) SINCE LAST REPORTi GIVE. REASONS:

9; POWER LEVEL.TO'WHICH RESTRICTED IF ANY (NET MWE) 4

10. REASONS FOR RESTRICI1UN.1F ANY:

THIS YR TO-CUMUL' l

MONTH DATE ATIVE j -

11. HUUMS.1N REPORTING PERIOD 720.00 6551.00 83616.00
12. NUMBER-OF HOURS REACTOR CRITICAL 606.63 6160.26 529(7i.'/4' 11 3. REACTOR ^ RESERVE SHUTDOWN. HRS

.00

.00

i647.'10' i -

14.' HOURS 1 GENERATOR ON LINE 535.08 5954.41 50091.79--

15.~ UNIT RESERVE SHUTDOWN HOURS

.00

.00-

.00 16.-~ GROSS, THERMAL ENERGY GEN. (MWH) 1243447.43 14087690.06 104194353.71 1 7_.

GROSS ELEC. ENERGY GEN. (MWH) 404790.00 4606379.00 34357652.00

10. NET ELEC. ENERGY GENERATED (MWH) 309295.00-4462824.00 33021521.00-19.. UNIT SERVICE FACTOR 74.32 90.09 59.91 20'. UNIT AVAILABILITY-FACIOR 74.32 90.89 59.91
21. ~ UNIT CAP. FACTOR (US L MDC NET) 68.44 96.23 49.99
22. UNIT CAP. FACTOR (USINL, DER NET) 65.86 02.90 40.10-

.23. UNIT FORCED 0UTAGE RATE 25.68 9.11

18. G3-
24 SHUTDOWNU SCHED. DVER NEXT 6' MONTHS (TYPE, DATE, AND DURATION OF EACH) i

- 25..IF UHulDUWN AI END OF REPURT Ph.R 1 uD, ESIIMATED DATE OF START UP

- 26. UNITS IN TEST STATUS (PRIOR TO COMliERCI AL OPERATION)

FORCAST ACHEIVED

' INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 4

[

1.16 - 9 m.

n:

w DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: October 1986 COMPLETED BY: ~ Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1

- Brunswick Unit 1 operated at a 74.32 percent availability factor for the month of September with a 68.44 percent capacity factor. The~re were four power reductions and one off-line outage. Details are in the Unit Shutdowns and Power Reductions sheet; also, one SRV Failure / Challenges Report.

There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.

n i

a-s /

SRV FAILURE / CHALLENGES REPORT DATE:

9/13/86'

~ TIME OF OCCURRENCE:

1058

-DETAILS 0F SRV's FAILURE:

At time of scram, A, C, D, E, and L SRVs opened.

Additionally, A, E,~~J, B, F,-and D were lifted manually to control pressure.

The sonics for A and L apparent 1y'did not work.

I I

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

~050-0325 UNIT NAME Brunswick T DATE ner-tor 6 REPORT MONTH Sept. 1986 COMPLETED 8Y F

=no=.

um or TELEPHONE 919-457-9571-

~

=

u, :

C 52 f5X licerisce

,EW Cause & Correceive l

N" DJ'c r-W?

4 2EE Event sT

o. ?

Action to

[@

E jdg Report e N0

[0 Prevent Recurrence 6

86-050 860902 S

00 B

5 N/A Control rod improvement I

2 3

4 F: Foiced Reason:

Method:

Exhibis G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Even Report (LER) File (NUREG-D-Regulatory Restriction 0161)

I E-Operator Training & License Examination is-Con t inua t ions F Administrarive 5-Load Reductions s

G Operational Error (Explain) 6-Other Eshibis 1 Same Source lis/77) 11 Other (E splain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswtek I DATE oce. 1986 REPORT MONTH ept. 1986 COMPLETED 8Y Franca = n erienn S

TELEPHONE o 1o-A s7-o s9 i l

=uE E

=_

N.,

p.n c i

5i j

i!d lc"Sec 5%

$"g L

Cause & Correceive Event g7 gO gy,,on,,

c 3.2

-2 5 3 oc yGj Repine e in U o

Prevent Recurrence O~

U d

86-051 860905 S

00 B

5 N/A MSIV.and turbine valve testing.

PT-14.I, Control Rod Operability Test

~

l s

~

a sw.

~

I 3

4 F: Forced

  • Reason:

S: Scheduled A Equipment Failure (Explain)

~

Method:

Exhibit G -Instructions I-Manual for Preparation of Daia B Maintenance of Test 2-Manual Scram.

Eniry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulator) Restriction 016))

E Operator Training & Ucense Examination 4-Continuations F Administrative 5-Load Reductions s

1 i

G-Operational Es ror (Explain)

(,-Other Exhibii I. Same Source l'3/77) ll Olher (Explain)

?

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNITNAME Brunswick T DATE ner. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Francee umerieny TELEPHONE 9.1o-A u-oe i 3

c

=-

1 kE

[

? 53 li"'

51

$"y.

Cause & Correceive parc Even g

o.

C 5:

0 E E a:

a x

.x m =

Report e us y Ev g

g Prevent Recurrence 4

e 0

86-054 860913 F

184:55 A

I LER l-86-024 Turbine generator voltage regulator forced outage l

l l

l I

2 3

4 F: Forced Reason-Method:

Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling

3. Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuatiens F.Administ rative 5-Load Reduetions s

G Operational Error (Explain) 6-Other Exhibit I Same Source t'8/77 )

Il-Other (E xplain t

a 2

~.

UNIT SHUTDOWNS AND POWER REDUCDONS DOCKET NO. 050-0325 UNITNAME Brunswick I DATE oce. 1986 REPORTMONT;l Sept. 1986 COMPLETED BY Francoe Hnerienq TELEPHONE 414-ta7-ou t

~.=

1

[?

'h 5' h Licensee

[%

g4 Cause & C: rrective N"

DJ f c i

.3'?

4

.;5 55 Event ay

o. ?

. Acta,,, to jE j @g Report

  • NO Prevent Recurrence i

c5 s86-056 860924 S

00 B

5 N/A Rod improvement 6

l 4

l p

i i

2 3

4 F Forced.

Reason:

Method:

Exhibit G. Instructions S.- Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 0161)

E-Operate.r Training & License Examination 1s-Continuat. ions F-Administrative 5-Load Reductions s

G-Operational Error (Explain) 6-Other Exhibit I. Same Source i

til/77)

Il-Other (Explain i

,i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick I DATE Oct. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-95?1 I

5 u. =

g"?

=-

y' '

I)r y

j;

{

7jg Licensee gg Cause & Corres-tive 2:

4

.2 3 oc Evens s?

o.

Action to

$E E

j@g Report e rNG O

prevent Recurrence c5 86-057 860927 S

00 B

5 N/A Routine valve testing I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Inst ructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 0161)

E-Operator Training & License Examination Is-Con t inua t ions F-Administ rative 5-Load Reductions

.s s

G-Operational Ee ror (Explain) 6-Other Exhibit I Same Source 19/77)

Il-Oiher (E xplain)

. ~. -

CP',L CO

. PLANT' PERFORMANCE DATA SYSTEM PAGE 2

j -

'RUtrDATE

.10/06/86 APPENDIX B - AVERAGE-DAILY POWER LEVEL RPD39

<RUN TIME 11~ 42:55 BRUNSWICK UNIT 2 t

DOCXEl NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 3,

SEPTEMBER 1986 DAY AVO. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL

-(tiWE-NET)

(MWE-NEI) 1 764 17 760 2

762 18 76i 3

'759 19 760 4

741 20 753 5

762 21

-75S 4

6 691 22 756 7

762 23 757 0

761 24 756 9

761 25 754 e

10 760 26 754 ii 757 27 752 i

12-756 28 746 i

13 747 29 751 14 759 30 747 l

15 760 16

/S7 i

t i

i 1.16 -a

C'P&L CO

~ PLANT PERFORMANCE DATA SYSTEM PAGE 2

RUN DATE iO/06/86 OPERA!1N(s DA1A REl'UR I RPD36 RUN TIME ii 42:58 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS IELEPHONE (919)457-9521 1.

UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I

2.

REPORTING P2R10D-SEPTEtiBER 86 i

j 3.

LICENSED THERMAL POWER (MWT) 2436 1

1-4.

NAMEPLATE RATING (GROSS MWE) 36/.0 l

1

-5.

DESIGN ELECTRICAL. RATING (NET MWE) 821.0 1

1 6.

MAX del'ENDAULE CAPAUllY (GRUSS MWE). 815.0 I i

/. r1AX~ DEPENDABLE CAPACITY iNET MWE) 790.0 8.

IF CHANGES OCCUR IN CAPAL11Y RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS-9.

POWER LEVEL T O WilICH RESTRIC TED IF ANY (NEI MWE)

10. REASONS FUR RESTRICTION IF ANY THIS YR TO CUMUL (1UN I H DALE A~ LIVE 1i. HOURS IN REPORTING PERIOD

'720.00 6551.00 95640.00

12. nun U t;R UE HUURS REACIUR CRITICAL 720.00 2381.74 56094.10
13. REAUluR RESLHVE SHUTDOWN llRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 720.00 2237.66 53248.75
15. UNIT RESERVE SHUIDUWN HOURS

.00

.00

.00

16. GRUSS THERMAL ENERGY GEN. (MWH) 174 ~/ 0 05. 56 5167592.03 103997464.56
97. GROSS ELEC. ENERGY GEN. (MWH) 36146b.00 1651Ub/.UU 6444/341.00
18. NE T ELEC. ENERGY GENERATED (MWh) 543400.00 iS64745.00 33002744.00
19. UNIT SERVICE FACTOR 100.00 34.16 35.60
20. UNIT A AIL ABILITY F ACTOR 100.00 34.16 55.6u
21. UNIT CAP. FACTOR (USING MDC NET) 95.53 30.23 43.6G
22. UNIT CAP. FACTOR (USING DER NET) 91.93 29.09 42.03
23. UNIT FORCED OUTAGE RATE

.00 9.91 45.26

24. SHUTDOWNS SCHED. UVER NEXT 6 tiUN1HS (1YPE, DATE, AND DURATION OF EACH)

Scheduled maintenance outage October 25 through November 14.

25. IF SHUIDOWN AT END OF REPORT PERIOD, ESTIMA'IED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL. OPERATION)

FORCAST ACHEIVED INiilAL UHillCAL11Y

- - - - ~

INI TI Al. ELECTRIClTY C u ttri L R U I A L Ol'LG A i 1 UN 1.16 - 9 l

1

f --

DOCKET NO.: 050-0324

-UNIT: Brunswick 2 DATE: October 1986 COMPLETED BY: Frances Harrison i

OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2. operated at a 95.53' percent capacity factor and a 100 percent-availability factor. There were four power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.

LThere'are 856 BWR and 144 PWR spent fuel bundles in~the Brunswick Unit 2 fuel' pool.

UNIT SHUTDOWNS AND POWER REDUCTIONS OOCKETNO. -050 032=

UNIT NAME Prunswick ii DATE n,r.

ions COMPLETED BY re=.

-. u.

.,ean REPORT MONTH Sept. 198r, TELEPHONE o io z ei_oe 9 i I

_E 4

[?

d 5' E Licensee je, Cause & Correceive

=

W D sic c-E?

4 1EE Event s?

o. 3 Action to j@

jdg Report e

<N0

[U Prevent Recurrence 6

86-026 860906 S

00 B

5 N/A Debris filter backwash and routine valve testing I

l l

1 1

2 3

4 F: Forced Reason :

Method:

Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Resiriction 0161) le-Con t i nua t. cons E-Operator Training & License Examination

(

F-Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other E xhibii I - Same Source

('8/77 )

Il Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brimavick TT DATE noe ions REPORT MONTH Sept. 1986 COMPLETED BY c--~

ee u-ri m TELEPHONE g ig_4 57_953 i I

(2E i j.3d l#"5""

5 *.

$"7

=_

-a Cause & Correceive i

lbsc i'

Evens 7

a.

5

-3 5 = ec g

C Report e v3 y Ev

= m :g g

Prevent Recurrence o

x 7

C 86-027 860913 S

00 B

5 N/A Routine valve t'esting i

i l

I 2

3 4

F: Forced Reason Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulator) Resariction 01611 E Operaior Training & License Examination 4-Continuat. sons s

F Administrative 5-Load Reductions s

l G-Operational Error (Explain) 6-Other E shibis 1 - Same Source 08/77)

Il-Other (E xplain t

UNIT SHUTDOWNS AND POWER REDUCTIONS.

DOCKET NO. 050-0325 Brunswick II UNIT NAME DATE Oct. 1986 REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE '919-457-957I I

2 5 w :N b*"5##

E'.

=_

L Cause & Coreettive 8"i 2:

E 2

N" Dak i

5i i

2i5 Event u7 a

Action to 3:

E jgg Report e

<E U U

Prevent Recurrence 6

1 1

86-028 860928 S

00 B

5 N/A Control ron operability PT-I4.1, and routine valve testing i

2 i

.I i

i 1

I i.

i l

f 1

2 3

4 F: Forced

  • Reason.

Method:

Exhibit G. Instrut-tions S Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File INUREG-D Regulatory Restriction 0161)

E-Operator Training & Ucense Examination 1s-Con t i nua t.ons

\\

F Administrative 5-Load Reductions 5

G-Operational Error (Explaini 6-Other Exhibit I. Same Source 19/77) 11-O:her (E xplaini

4 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

"'""8"lCk ' I_

UNIT NAME UC'-

IN DATE REPORT MONTH Sept. 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-957i i

I E

c I

! ~;

'h

- !* E Licensee h

f%

Cause & Currective N"

DJir i

3?

?

255 Event p

o.'8 Actron en jU j

f:

5 jgg Report e mO Prevent Recurrence 6

86-029 860930 S

00 B

5 N/A Reduced power to perform debris filter backwash i

1 l

~

I 2

3 4

1 F: Forced

  • Reason:

Method-Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain)

I-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Shecis for Licensee C Refueling 3 Autoniatic Scram.

Event Report (LER) File INURECr D. Regulatory Restriction 0161)

E-Operator Training & License Ex.inination 1s-Continuations l

\\

F Adnunistrative 5-Load Reductions 3

G Operational Error (Explain)

(,-Other Eshibit I-Same Source 19/77) ll Other (E xplaini

/ >.

Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 October 7, 1986 FILE: B09-13510C SERIAL: BSEP/86-1423 Mr. R. M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT

Dear Mr. Scroggins:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of September 1986.

Very truly yours,

e. 5 :

C. R. Die $

tz, General Manager Brunswick Steam Electric Plant FH/ cab MSC/85-0014 Enclosures cc:

Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Ms. H. M. Shaver Ms. D. J. Vicks INPO g[6 >

1 t[I