BSEP-85-1788, Monthly Operating Repts for Sept 1985
| ML20133H236 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 09/30/1985 |
| From: | Dietz C, Harrison F CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| BSEP-85-1788, NUDOCS 8510160321 | |
| Download: ML20133H236 (14) | |
Text
CP&L CD PLANT PERFORMANCE DATA SYS1EM PAGE I
RUN DATE 10/02/95 APPENDIX B - AVERAGE DAILY POWER t.EVEL RPD39 RUN TIME 09:49:16 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457--9521 SEPTEMDER i985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1
--1 0 17
-11 2
-10 18
-10 3
-i0 i9
-7 4
-11 20
-8 5
-11 21
-7 6
-9 22
-7 7
-8 23
-7 8
-11 24
-7 9
-14 25
-6 10
-13 26
-6 11
-12 27
-6 12
-11 28
-7 13
-12 29
-10 14
-12 30
-10 15
-12 16
-11 1.16 - 8 s
1 I
8510160321 850930 N
PDR ADOCh 05000324 llg R
PDR L.
s L
t-CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1
4 RUN DATE 10/01/85 OPERATING DATA REPORT RPD36 RUN TIME 10:56:50 BRUNSWICK UNIT 1 i
DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON I
~
OPERATING STATUS TELEPHONE (919)457-9521 e
k i.' UNIT NAME: BRUNSWICK UNIT i 1 NOTES I
l
- 2. REPORTING PERIOD: SEPTEMBER 85 l
l 3.. LICENSED THERMAL POWER (MWT)- 2436 I
i i
4.
NAMEPLATE RATING (GROSS MWE)- 067.0 I
l t
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
i
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 015.0 1 I
f 4
- 7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0 1
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, i
GIVE REASONS:
i I
- 9. F0WER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)-
- 10. REASONS FOR RESTRICTION IF ANY:
'I 1
1 j
THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 720.00 6551.00 74856.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00 2079.00 45500 A6 f
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10 l
- 14. HOURS GENERATOR ON LINE
.00 2064.45 42953.28
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00 3521596.58 87570793.50
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 1100426.00.
20922523.00 l
- 18. NET ELEC. ENERGY GENERATED (MWH)
-6799.00 1120396.00 27766179.00 3
- 19. UNIT SERVICE FACTOR
.00 31.51 57.38 1
- 20. UNIT AVAILABILITY FACTOR
.00 31.51 57.30
}
-1.20 21.45 46.95 l
- 22. UNIT CAP. FACTOR (USING DER NET)
-1.15 20.83 45.18
- 23. UNIT FORCED OUTAGE RATE
.00 2.23 20.20
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)*
i 1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP 11/08/85
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY I
l COMMERCIAL OPERATION i
1 l
1.16 - 9 L
DOCKET NO.: 050-0325 LWIT: Brunswick 1 DATE: October 1985 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRLWSWICK UNIT 1 Unit 1 was shut down on March 29, 1985, for refueling / maintenance outage.
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.
e
050-0325 DOCKET NO.
UNIT SHUTIX)WNS AND POWER REDUCTIONS Brunswicic 1 UNIT NAME DATE October 1985 REPORT MONTH September 1985 COMPLETED BY Frances Harrison
- TELEPHONE (919) 45'/-9521 c
[g 3
j Y5 Licensee
[g y%
Cause & Corrective No.
Date g
3:
4 jj$
Event l'8 g'E Action to y:
j di g Report c mV U
Prevent Recurrence g
6 85-006 850329 S
In C
4 NA RC FUELXX Refueling / Maintenance Outage Progress i
2 3
4 F: Forced Reason:
Method:
Exlubit G - Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scrain.
Event Report (LER) File (NUREG.
D-Regulatory Restrietion 0161) le-Continuations E4)perator Trainmg & License Examination F-Adminisintive 5-Load Reductions s
G Operational Error (Explain')
(-Other Exhibit I - Same Source 19/77)
Il-Other ( E xplain)
N
l CP&L d0 PLANT PERFORMANCE DATA SYSTEM PAGE 2-
-RUN DATE 10/02/85-APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME 09:49:16 BRUNSWICK UNIT 2 1
DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 SEPTEMBER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 757 17 767 2
767 18 766 3
767 19 764 4
129 20 761 5
-10 21 730 i
6 475 22 693 7
675 23 765 i
8 725 24 762 I
l 9
734 25 760 l
l 10 694 26 300 ii 615 27
-13 12 689 28
-12
-13 760 29
-9 14 766 30
-9 15 747
~i6 767 4
1.16 - 0
CP&L C0 PLANT PERFORMANCE DATA SYSIEM PAGE 2
RUN DAT E - 10/02/85 OPERATING DATA REPOR1 RPD36 RUN TIME 09:49:19 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521
- i. UNIT NAME: BRUNSWICK UNIT 2 NOTES
- 2. REPORTING PERIOD: SEPTEMBER 85 i
1
- 3. LICENSED THERMAL POWER (MWT)- 2436 I
i 4.
NAMEPLATE RATING (GROSS MWE); 867.0 l
1
- 5. DESIGN ELECTRICAL RATING-(NET MWE): 821.0 I
i
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 l I
7.
MAX DEPENDABLE CAPACITY (NET MWE). 790.0
----------~~--
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE);
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE r
- 11. HOURS IN REPORTING PERIOD 720.00 6551.00 86000.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 576.92 5979.71 53357.23
- 13. REACTOR RESERVE SHUTDOWN llRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 569.25 5903.44 49928.51
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1305150.34
'13515058.58 96625925.89 i
- 17. GROSS ELEC. ENERGY GEN. (MWH) 425930.00 4467162.00 32060066.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 410195.00 4322923.00 30743397.00
- 19. UNIT SERVICE FACTOR 79.06 90.12 57.47
- 20. UNIT AVAILABILITY FACTOR 79.06 90.12 57.47
- 22. UNIT CAP. FACTOR (USING DER NET) 69.39 80.38 43.10
- 23. UNIT FORCED OUTAGE RATE 20.94 5.78 15.25
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) i
'25.
IF SHUTDOWN AT'END.0F REPORT PERIOD, ESTIMATED DATE OF START UP 10/12/85
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)~ FORCAST ACHEIVED INITIAL CRITICALITY
- ~ ~ - - - - -
INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 1
J
DOChTT NO. : 050-0324 UNIT: Brunswick 2 DATE: October 1985 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 79.06 percent availability factor for the month of September 1985 with a 72.12 percent capacity factor. There were three power reductions and two off-line outages. Details are in Unit Shutdowns l
and Power Reductions sheet.
There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
I
050-0324 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE October 1985 COMPLETED BY Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521-
~.
?
c jg 3
j Yl Lisensee 5 t, Cause & Corrective h
Date 3
3g 4
23&
Event gg
^ ' " " ' "
Eg' y:
5 j5 Repi,rt :
mV Prevent Recurrence C
85-058 850904 F
42.46 C
2 2-85-005 Reactor Scram - Loss of Instrument
'~
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance oi Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) t 4-Continuat. ions EOperator Training & Ucense Examination F-Administrative 5-toad Reductions 5
G-Operational Error (Explain)
(,-Other Exhibit 1 - Same Source 19/77) llother (Explain)
050-0324 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick II UNIT NAME DATE October 1985 COMPLETED 8Y Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521 n.
E c
.5 ?
"h 4 E~
Licensee p,
ge, Cause & Currective No.
Date i
5?
4
,E s 5 Event g
3 Action to
~3 gO fE 5
j ;f3 Report e mV Prevent Recurrence
=
g di 85-061 850907 F
00 A
5 NA Operating at Reduced Power Due to High Drywell Temperature i
2 3
4 F: Forced Reason:
Method:
Exlubit C - Instructions S: Scheduled A-Eqtupment Failure (Explain) i-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheet 5 for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restriction OI6I) 4-Continuat. tons E-Operator Training & License Exanunanon F.Adnunistrative 5-Load Reductions 3
G-Operational Error (Explain) 6-Other Exhibit I-Same Source 19/77) llother (Esplain) t
1 050-0324-DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE October 1985 COMPLETED BY Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521 c
{?
3 j E5 Licensee gw, h
Cause & Corrective Date 3?
?
2s5 Event
~g Action to
-2:
3 5 =s Report mU Prevent Recurrence e
v d
85-065 850915 S
00 B
5 NA Routine Valve Testing and PT-14.1 l
2 3
4 F: Forced Reason; Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) 1-Continuations 6
E-Operator Training & License Examination F-Adminrstratise 5-Load Reductions 5
Goperational Error (Esplain) 6-Other Eshibit I - Same Source N/77)
!!Orher (Esplain) n
-.+n.-
,e v.
J
050-0324 DOCKETNO.
UNIT SilUTDOWNS AND POWER REDUCIlONS UNIT N AME Brunswick II DATE October 1985 COMPLETED 3Y Frances Harrisog REPORT MONT11 September 1985 TELEPif0NE (919)457-952I n.
E c
i?
'h j Ei Licensee
[w, g%
Cause & Correcttvc L
Da t t i
3?
4 2s5 Event gg gO3 Action to j~
35e Report a mV Prevent Recurrence o
u a
c5 85-066 850921 S
00 B
5 NA Debris Filter Flush and Routine Valve Testing
~-
.2 3
4 F ho ed Reason.
Method:
Ex1ubit G Instructions s
5 Sched uled A. Equipment Failure (Explain) 14f anual for Preparation of Data B-Maintenance of Test 24f anual Scra m.
Entry Sheets for Licensee C-Refueling 3 Automatic Scrain.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 0161)
'e-Con t i nua t. ions E-Operator Training & Ucense Examination F-Adrrunistrative 5-Load Reduet1ons s
G-Operational Error (Explain) 6-Other Exhibit I Same Source 19/771 Il-Othe r (E xplam )
050-0324 DOCKET NO. _ Brunswick II UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME DATE October 1985 REPORT MONT11 September 1985 COMPLETED BY Frances Harrison TELEPflONE (919)457-9521 E
9 w
5E 3
j E5 Licensee
[ r,
{3 L
Cause & Currective b
Da k
3?
4 2sE Eve nt g7 Action to gV
$E E
j gy3 g Report a mU Prevent Recurrence g
6 85-067 850926 F
In H
I Cenerator Removed From Service Due to Hurricane Warning Progresa 2
3 4
F Forced Reason:
Method:
Exlubit C-Instructions S Scheduled A Equiprnent Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
- Event Report (LER) File (NUREG.
1 D-Regulatory Restriction 0161) l E-Operator Training & Ucense Examination
's-Continuat. ions F Administrative 5-Load Reduetions 5
G-Operational Error (Explain) 6-Other Exhibit I Same Source t'8/77 )
H Other (Explain)
050-0324 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick IT DATE october 1985 COMPLETED BY Frances Harrison REPORT MONT11 Aueust 1985 TELEP}f0NE (9191457-9521 E
e j Yl Licensee
[ r,
{%
Cause & Currective 3g b
D.s h i
3g 4
2s&
Event
{?
g3 Action to j=
5 jgg Report 2r mV V
Prevent Recurrence g
6 85-136 850823 F
00 B
5 NA Consnenced Lowering Reactor Power for Debris Filter Backwash and 2A Condenser Booster Pump Operability Check
~
2 3
4 F For ed Reason.
Method Ex!ubii G Instructions c
S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restuction 0161)
's-Continuat. ions E-Operator Training & Ucense Examination F-Adnunistrative 5-Load Reduetions 5
Goperational Error (Explain)
(,-O t h e r Exhibit I Same Source t9/77)
IIOther (Explain)
epaa Carolina Power & Light Company c;,r:a r w ar n w cin m er n Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 October 4, 1985 l
FILE: B09-13510C SERIAL: BSEP/85-1788 Mr. J. M. laylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEA51 ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT
Dear Mr. Taylor:
i In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of September 1985.
Please note the correction on the attached event number,85-056, which was reported as scheduled. The event should have been reported as forced.
Very truly yours, O.q C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/dj MSC/85-0014 Enclosures cc:
Mr. M. R. Beebe Dr. J. N. Grace Mr. J. L. Harness Mr. C. F. Lassiter Ms. D. J. Vicks INPO
[t
- I l
-.