CP&L CD PLANT PERFORMANCE DATA SYS1EM PAGE I

RUN DATE 10/02/95 APPENDIX B - AVERAGE DAILY POWER t.EVEL RPD39 RUN TIME 09:49:16 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457--9521 SEPTEMDER i985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1

--1 0 17

-11 2

-10 18

-10 3

-i0 i9

-7 4

-11 20

-8 5

-11 21

-7 6

-9 22

-7 7

-8 23

-7 8

-11 24

-7 9

-14 25

-6 10

-13 26

-6 11

-12 27

-6 12

-11 28

-7 13

-12 29

-10 14

-12 30

-10 15

-12 16

-11 1.16 - 8 s

1 I

8510160321 850930 N

PDR ADOCh 05000324 llg R

PDR L.

s L

t-CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1

4 RUN DATE 10/01/85 OPERATING DATA REPORT RPD36 RUN TIME 10:56:50 BRUNSWICK UNIT 1 i

DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON I

~

OPERATING STATUS TELEPHONE (919)457-9521 e

k i.' UNIT NAME: BRUNSWICK UNIT i 1 NOTES I

l

2. REPORTING PERIOD: SEPTEMBER 85 l

l 3.. LICENSED THERMAL POWER (MWT)- 2436 I

i i

4.

NAMEPLATE RATING (GROSS MWE)- 067.0 I

l t

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

i

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 015.0 1 I

f 4

7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0 1

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, i

GIVE REASONS:

i I

9. F0WER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)-
10. REASONS FOR RESTRICTION IF ANY:

'I 1

1 j

THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 720.00 6551.00 74856.00

12. NUMBER OF HOURS REACTOR CRITICAL

.00 2079.00 45500 A6 f

13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10 l

14. HOURS GENERATOR ON LINE

.00 2064.45 42953.28

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH)

.00 3521596.58 87570793.50

17. GROSS ELEC. ENERGY GEN. (MWH)

.00 1100426.00.

20922523.00 l

18. NET ELEC. ENERGY GENERATED (MWH)

-6799.00 1120396.00 27766179.00 3

19. UNIT SERVICE FACTOR

.00 31.51 57.38 1

20. UNIT AVAILABILITY FACTOR

.00 31.51 57.30

}

21. UNIT CAP. FACTOR (USING MDC NET)

-1.20 21.45 46.95 l

22. UNIT CAP. FACTOR (USING DER NET)

-1.15 20.83 45.18

23. UNIT FORCED OUTAGE RATE

.00 2.23 20.20

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)*

i 1

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP 11/08/85
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY I

l COMMERCIAL OPERATION i

1 l

1.16 - 9 L

DOCKET NO.: 050-0325 LWIT: Brunswick 1 DATE: October 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRLWSWICK UNIT 1 Unit 1 was shut down on March 29, 1985, for refueling / maintenance outage.

There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.

e

050-0325 DOCKET NO.

UNIT SHUTIX)WNS AND POWER REDUCTIONS Brunswicic 1 UNIT NAME DATE October 1985 REPORT MONTH September 1985 COMPLETED BY Frances Harrison

- TELEPHONE (919) 45'/-9521 c

[g 3

j Y5 Licensee

[g y%

Cause & Corrective No.

Date g

3:

4 jj$

Event l'8 g'E Action to y:

j di g Report c mV U

Prevent Recurrence g

6 85-006 850329 S

In C

4 NA RC FUELXX Refueling / Maintenance Outage Progress i

2 3

4 F: Forced Reason:

Method:

Exlubit G - Instructions 5: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling 3-Automatic Scrain.

Event Report (LER) File (NUREG.

D-Regulatory Restrietion 0161) le-Continuations E4)perator Trainmg & License Examination F-Adminisintive 5-Load Reductions s

G Operational Error (Explain')

(-Other Exhibit I - Same Source 19/77)

Il-Other ( E xplain)

N

l CP&L d0 PLANT PERFORMANCE DATA SYSTEM PAGE 2-

-RUN DATE 10/02/85-APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME 09:49:16 BRUNSWICK UNIT 2 1

DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 SEPTEMBER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 757 17 767 2

767 18 766 3

767 19 764 4

129 20 761 5

-10 21 730 i

6 475 22 693 7

675 23 765 i

8 725 24 762 I

l 9

734 25 760 l

l 10 694 26 300 ii 615 27

-13 12 689 28

-12

-13 760 29

-9 14 766 30

-9 15 747

~i6 767 4

1.16 - 0

CP&L C0 PLANT PERFORMANCE DATA SYSIEM PAGE 2

RUN DAT E - 10/02/85 OPERATING DATA REPOR1 RPD36 RUN TIME 09:49:19 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521

i. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: SEPTEMBER 85 i

1

3. LICENSED THERMAL POWER (MWT)- 2436 I

i 4.

NAMEPLATE RATING (GROSS MWE); 867.0 l

1

5. DESIGN ELECTRICAL RATING-(NET MWE): 821.0 I

i

6. MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 l I

7.

MAX DEPENDABLE CAPACITY (NET MWE). 790.0


----------~~--

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE);

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE r

11. HOURS IN REPORTING PERIOD 720.00 6551.00 86000.00
12. NUMBER OF HOURS REACTOR CRITICAL 576.92 5979.71 53357.23
13. REACTOR RESERVE SHUTDOWN llRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 569.25 5903.44 49928.51
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1305150.34

'13515058.58 96625925.89 i

17. GROSS ELEC. ENERGY GEN. (MWH) 425930.00 4467162.00 32060066.00
18. NET ELEC. ENERGY GENERATED (MWH) 410195.00 4322923.00 30743397.00
19. UNIT SERVICE FACTOR 79.06 90.12 57.47
20. UNIT AVAILABILITY FACTOR 79.06 90.12 57.47
21. UNIT CAP. FACTOR (USING MDC NET) 72.12 83.53 44.79
22. UNIT CAP. FACTOR (USING DER NET) 69.39 80.38 43.10
23. UNIT FORCED OUTAGE RATE 20.94 5.78 15.25
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) i

'25.

IF SHUTDOWN AT'END.0F REPORT PERIOD, ESTIMATED DATE OF START UP 10/12/85

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)~ FORCAST ACHEIVED INITIAL CRITICALITY

- ~ ~ - - - - -

INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 1

J

DOChTT NO. : 050-0324 UNIT: Brunswick 2 DATE: October 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 79.06 percent availability factor for the month of September 1985 with a 72.12 percent capacity factor. There were three power reductions and two off-line outages. Details are in Unit Shutdowns l

and Power Reductions sheet.

There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

I

050-0324 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE October 1985 COMPLETED BY Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521-

~.

?

c jg 3

j Yl Lisensee 5 t, Cause & Corrective h

Date 3

3g 4

23&

Event gg

^ ' " " ' "

Eg' y:

5 j5 Repi,rt :

mV Prevent Recurrence C

85-058 850904 F

42.46 C

2 2-85-005 Reactor Scram - Loss of Instrument

'~

Air to Scram Header L

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance oi Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) t 4-Continuat. ions EOperator Training & Ucense Examination F-Administrative 5-toad Reductions 5

G-Operational Error (Explain)

(,-Other Exhibit 1 - Same Source 19/77) llother (Explain)

050-0324 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick II UNIT NAME DATE October 1985 COMPLETED 8Y Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521 n.

E c

.5 ?

"h 4 E~

Licensee p,

ge, Cause & Currective No.

Date i

5?

4

,E s 5 Event g

3 Action to

~3 gO fE 5

j ;f3 Report e mV Prevent Recurrence

=

g di 85-061 850907 F

00 A

5 NA Operating at Reduced Power Due to High Drywell Temperature i

2 3

4 F: Forced Reason:

Method:

Exlubit C - Instructions S: Scheduled A-Eqtupment Failure (Explain) i-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheet 5 for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D. Regulatory Restriction OI6I) 4-Continuat. tons E-Operator Training & License Exanunanon F.Adnunistrative 5-Load Reductions 3

G-Operational Error (Explain) 6-Other Exhibit I-Same Source 19/77) llother (Esplain) t

1 050-0324-DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick II DATE October 1985 COMPLETED BY Frances Harrison REPORT MONTH September 1985 TELEPHONE (919)457-9521 c

{?

3 j E5 Licensee gw, h

Cause & Corrective Date 3?

?

2s5 Event

~g Action to

-2:

3 5 =s Report mU Prevent Recurrence e

v d

85-065 850915 S

00 B

5 NA Routine Valve Testing and PT-14.1 l

2 3

4 F: Forced Reason; Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for 1.icensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161) 1-Continuations 6

E-Operator Training & License Examination F-Adminrstratise 5-Load Reductions 5

Goperational Error (Esplain) 6-Other Eshibit I - Same Source N/77)

!!Orher (Esplain) n

-.+n.-

,e v.

J

050-0324 DOCKETNO.

UNIT SilUTDOWNS AND POWER REDUCIlONS UNIT N AME Brunswick II DATE October 1985 COMPLETED 3Y Frances Harrisog REPORT MONT11 September 1985 TELEPif0NE (919)457-952I n.

E c

i?

'h j Ei Licensee

[w, g%

Cause & Correcttvc L

Da t t i

3?

4 2s5 Event gg gO3 Action to j~

35e Report a mV Prevent Recurrence o

u a

c5 85-066 850921 S

00 B

5 NA Debris Filter Flush and Routine Valve Testing

~-

.2 3

4 F ho ed Reason.

Method:

Ex1ubit G Instructions s

5 Sched uled A. Equipment Failure (Explain) 14f anual for Preparation of Data B-Maintenance of Test 24f anual Scra m.

Entry Sheets for Licensee C-Refueling 3 Automatic Scrain.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 0161)

'e-Con t i nua t. ions E-Operator Training & Ucense Examination F-Adrrunistrative 5-Load Reduet1ons s

G-Operational Error (Explain) 6-Other Exhibit I Same Source 19/771 Il-Othe r (E xplam )

050-0324 DOCKET NO. _ Brunswick II UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME DATE October 1985 REPORT MONT11 September 1985 COMPLETED BY Frances Harrison TELEPflONE (919)457-9521 E

9 w

5E 3

j E5 Licensee

[ r,

{3 L

Cause & Currective b

Da k

3?

4 2sE Eve nt g7 Action to gV

$E E

j gy3 g Report a mU Prevent Recurrence g

6 85-067 850926 F

In H

I Cenerator Removed From Service Due to Hurricane Warning Progresa 2

3 4

F Forced Reason:

Method:

Exlubit C-Instructions S Scheduled A Equiprnent Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

- Event Report (LER) File (NUREG.

1 D-Regulatory Restriction 0161) l E-Operator Training & Ucense Examination

's-Continuat. ions F Administrative 5-Load Reduetions 5

G-Operational Error (Explain) 6-Other Exhibit I Same Source t'8/77 )

H Other (Explain)

050-0324 DOCKET NO.

UNITSHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick IT DATE october 1985 COMPLETED BY Frances Harrison REPORT MONT11 Aueust 1985 TELEP}f0NE (9191457-9521 E

e j Yl Licensee

[ r,

{%

Cause & Currective 3g b

D.s h i

3g 4

2s&

Event

{?

g3 Action to j=

5 jgg Report 2r mV V

Prevent Recurrence g

6 85-136 850823 F

00 B

5 NA Consnenced Lowering Reactor Power for Debris Filter Backwash and 2A Condenser Booster Pump Operability Check

~

2 3

4 F For ed Reason.

Method Ex!ubii G Instructions c

S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restuction 0161)

's-Continuat. ions E-Operator Training & Ucense Examination F-Adnunistrative 5-Load Reduetions 5

Goperational Error (Explain)

(,-O t h e r Exhibit I Same Source t9/77)

IIOther (Explain)

epaa Carolina Power & Light Company c;,r:a r w ar n w cin m er n Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 October 4, 1985 l

FILE: B09-13510C SERIAL: BSEP/85-1788 Mr. J. M. laylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEA51 ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT

Dear Mr. Taylor:

i In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of September 1985.

Please note the correction on the attached event number,85-056, which was reported as scheduled. The event should have been reported as forced.

Very truly yours, O.q C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/dj MSC/85-0014 Enclosures cc:

Mr. M. R. Beebe Dr. J. N. Grace Mr. J. L. Harness Mr. C. F. Lassiter Ms. D. J. Vicks INPO