Monthly Operating Repts for June 1984
ML20090A034
Person / Time
Site: Brunswick  
Issue date: 06/30/1984
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-84-1591, NUDOCS 8407110198
Download: ML20090A034 (12)


Text

7 --

AFPENDIX DOCKET NO.: 050-325 UNIT: Brunswick 1 DATE: June 1984 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1 Brunswick Unit 1 operated at an 84.3% availability factor for the month of June with a 78.6% capacity factor. There was one off-line outage and three power reductions. -Details are.in Appendix D, the Unit Shutdown and Power Reducti6n Log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.

[

8407110198 840630 PDR ADOCK 05000324 R

PDR d

$6 \\h

050-0325 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I DATE July 1984 REPORT MONTH June 1984 COMPLETED BY Mn H;nrrinnq TELEPHONE 919-457-4521 E

c I?

3 j Ei Licensee h

Cause & Corrective Daic

E 4
E5 Event u7 c?

Action to 2

Report e NC

!0 Prevent Recurrence 8

5 3d:f e

u 6

84-042 840605 F

00 B

5 NA Unable to perform PT 14.1 CRD Operability due to continued blocks from APIN upscales.

Reduce power to 85% push rod at 8 to position 6 ccme up to 90% & do valve testing and PT 14.1 then increase to 100%.

I 2

3 4

F: Forced Reason :

Method.

Ex!ubit G - Instructions S: Scheduled A Eqmpment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Senm.

Event Report (LER) File (NUREG-D Regulatory Restriction 0161) 4-Continuations E-Operator Training & License Examination F Adnunistrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other E xhibit I - Same Souw-to/77)

II-Other (Explain)

e

~-

050-0325 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I DATE July 1984 June 1984 COMPLETED BY ha Harrinnr1 REPORT MONTH TELEPHONE 919-451-9321

~.~

e

.3 m:

g l

i

~

5s E

7yy Licensee g"?

54, L

Cause & Corrective y

f y" -

9, ' '

I e5 4

2 = cc:

Eveni s?

o-Action to l

$E 5

j@g Report e N0 0

Prevent Recurrence di 84-043 840609 S

00 B

5 NA Mml power for I&C MSIV and ' ICV testing.

I 2

3 4

F: Forced Reason -

Method:

Exhibit G - Inst ructions

- ~ S-Sched uled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File INUREG-6 0161n D Regulator 3 Rest riction 1-Continuat. eons E Operator Training & License Examination F Admimstrative 5-Load Redactions 5

G-Operanonal Er ror ( E xplain )

6-Other Exhibit I Same Source P8/77)

Il Other ( E xplain)

~-

050-0325 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick I DATE July 1984 COMPLETED BY ha Harric:nq REPORT MONTH June 1984 TELEPHONE 919-4 57-45'>1 if 54 Licensee E

5 u. :

=_

v.

3 g't, c4 Cause & Corrective 8.

Action to

\\"

DJ 'c i

55 4

_5 5 5 Event s9

$'3 4E E

5 5 :!

Report =

'5 0 Prevent Recurrence

~

4 u

4 d

]

I 84-046 840610 F

112.73 A 2

NA Rx shutdown due to leak in heater I

drain purtp discharge header.

)

Cut out foundation support, repaired through wall crack in 18 inch 1

discharge header and reinstalled foundation.

t 2

3 4

F: Forced Reason-Method; Exhibit G - Inst ructions 1

S: Scheduled A. Equipment Fadure(Explair.)

I-Manual for Preparation of Data B-Mair.tenance of Test 2-Manual Scrarn.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report iLER) File (NUREG-

~

D-Regulatory Restriction 0161) 4-Continuations E-Operatur Training & License Examination F Administrative 5-Load Reductions 5

i G-Operational Error (Explain) 6-Other Eshibit I Same Source 19/77)

Il-Other ( E xplain) l -.

_..~

~-

DOCKETNO. 050-0125 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I DATE.Tulv 14Rd Frahoes Harrism COMPLETED BY REPORT MONTH June 1984 TELEPHONE 919-457-9521 n.=

=_

5 u, =

5 L

ii E4 Licensee

.g ",

84

~

c Cause & Correceive 2

3i 4

.5 i 5 Event

?

3 Action to N"

I)J'c

$E 5

j 5, Report =

rN C

!O Prevent Recurrer C

34-047 840629 S

00 B

5 NA Bod improvenent and valve testing.

I 2

3 4

F: Forced Reason :

Method Exhibit G - Inst uctions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 0161) 4-Continuat. ions E-Operator Traming & License Examination F-Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Eshibit 1 - Same Source t9/77)

Il-Other ( E splain )

~

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT DRUNSWICK UNIT 1 DATE 07/02/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 JUNE 1984 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 690 17 738 2

674 18 779 3

723 19 780 4

774 20 781 5

758 21 783 6

780 22 782 7

784 23 770 8

785 24 781 9

691 25 780 10 57 26 779 11

-9 27 777 12

-9 28 777 13

-10 29 762 14 0

30 742 15 484 16 652 1,16 - 8

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 07/02/84 COMPLETED BY FRANCES HARRISON TELEPHONF (919)457-9521 OPERATING STATUS 1.

UNIT NAME: BRUNSWICK UNIT 1 i NOTES I

2.

REPORTING PERIOD: JUNE 84 l

l 3.

LICENSED THERMAL POWER (MWT): 2436 I

i 4.

NAMEPLATE RATING (GROSS MWE): 867.0 l

l S.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

l 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l I

7.

MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 4367.00 63888.00
12. NUMBER OF HOURS REACTOR CRITICAL 627.13 3785.32 40183.30
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 607.27 3669.72 37758.25
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1398698.58 8544917.00 76972211.57
17. GROSS ELEC. ENERGY GEN. (MWH) 461646.00 2852966.00 25400017.00
18. NET ELEC. ENERGY GENERATED (MWH) 447226.00 2770087.00 24303927.00
19. UNIT SERVICE FACTOR 84.34 84.03 59.10
20. UNIT AVAILABILITY FACTOR 84.34 84.03 59.10
21. UNIT CAP. FACTOR (USING MDC NET) 78.63 80.29 48.31
22. UNIT CAP. FACTOR (USING DER NET) 75.66 77.26 46.49
23. UNIT FORCED OUTAGE RATE 15.66 9.97 22.01
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Pr 20.3 Outage 11-2-84 6 weeks (ILRT & IGSCC)

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

~

APPENDIX l

l DOCKET NO.:

050-324 UNIT:

Brunswick 2 DATE: June 1984 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 was off line for refueling / maintenance outage. There are 580 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool. There l

have been 560 bundles moved to the spent fuel pool during refueling; of these, 156 will remain in the pool when the core is reloaded.

l

o-APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 07/02/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 JUNE 1984 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1

-3 17

-5 2

~5 18

-6 3

-5 19

-6 4

-5 20

-6 5

-5 21.

-6 6

-5 22

-6 7

-5 23

-6 8

-5 24

-6 9

-5 25

-6 10

-5 26

-5 11

-6 27

-6 12

-6 28

-6 13

-6 29

-6 14

-5 30

-5 la

-6 16

-6 1.16 - 0

~

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 07/02/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STAiUS 1.

UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I

2.

REPORTING PERIOD: JUNE 04 l

l 3.

LICENSED THERMAL POWER (MWT): 2436 I

I 4.

NAMEPLATE RATING (GROSS MWE): 667.0 l

I 5.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

I 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I

7.

MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 4367.00 75912.00
12. NUMBER OF HOURS REACTOR CRITICAL

.00 1604.33 46331.75

13. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR ON LINE

.00 1566.99 43352.46

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH)

.00 3355120.34 01931041.36

17. GROSS ELEC. ENERGY GEN. (MWH)

.00 1110430.00 27220120.00

18. NET ELEC. ENERGY GENERATED (MWH)

-3949.00 1059273.00 26087091.00

19. UNIT SERVICE FACTOR

.00 35.00 57.11

_ 20. UNIT AVAILABILITY FACTOR

.00 35.00 57.11

21. UNIT CAP. FACTOR (USING MDC NET)

.69 30.70 43.50

22. UNIT CAP. FACTOR (USING DER NET)

.67 29.54 41.06

23. UNIT FORCED OUTAGE RATE

.00 2.22 15.54

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UN' S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED j

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

1

\\

l A

~-

DOCKET NO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME Brunswick II DATE Th11v 1984 i

COMPLETED BY MA= mrrisanat June 1984 REPORT MONTH TELEPHONE 919-457-9521 1

~ z h%

h =E 4 Cause & Currectne

[~

LAensee

~w y

Ewns s?

E?

Action to thrc

E 4

E 3d:s Repnt =

NC

!0 Present Recurrence v

6 E4-020 840313 S

In C

4 NA BC EUELXX Refueling / Maintenance Outage Progress l

1 i

3 4

F F.waJ Reas.m Method.

Ex!nbis G-Instructams S Schedu!cJ 4 Equzpment Fa !ure t Esplamp I-Manual for Preparation of Data B-Mamtename of Test 2-Manual Scram.

Entry Sheets for Licensee C.Refueleg 3-Automate Scram.

k. vent Report (LER) File (NUREG-OI6II D-Regulatory Rest:actam le-Continuat. ions E4)perator Trammgi Escense Eumana:ron F AJernrmtraine 5-Load Reductions 5

G{)peratsund Esent t E mpLun) 6-Other E stubit I - Sanw S mrce t-*f77 9 11 Other iE splam t

~

Cp&L Carohna Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 July 3, 1984 FILE:

B09-13510C SERIAL:

BSEP/84-1591 Mr. R. C. DoYoung - Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEA!! ELECTRIC PLANT, UNITS 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONT1(LY OPERATING REPORT Daar tir. DnYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2 Carolina Power & Light Company herewith submits the report of oporating statistics and shutdown exporlence for the month of Juno 1984.

Very truly yours, I

h.q C. R. Dintz, General Managnr Brunswick Steam Electric Plant Fil/ag/LETJ05 Enclosures cc

!!s. J. C. Baknr tir. S. W. ?!cDown11 Mr. J. P. O'Rollly INPO 6 24