Text
.
AVELAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-293 UNIT Pilgrim 1 DATE 12/11/84 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 MONTH November 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0,
17 0.
2 0.
18 0.
3 0.
19 0.
4 0.
20 0.
5 0.
21 0.
6 0.
22 0.
7 0.
23 0.
8 0.
24 0.
9 0.
25 0.
10 0.
26 0.
11 0.
27 0.
12 0.
28 0.
13 0.
29 0.
14 0.
30 0.
15 0,
31 N/A 16 0.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
8412210062 B41130 PDR ADOCK 05000293.
R PDR
\\
R OPERATING DATA REPORT DOCKET NO.
50-293 DATE 12/11/84 COMPLETED BY P. Hamilton TELEPHONE (617)746-7900 OPERATING STATUS 1.
Unit Name Pilerl<n 1 Notes 2.
Reporting Period Novagber 1984 3.
Licensed Thermal Power (MWt) 1993 4.
Nameplate Rating (Gross MWe) 678 5.
Design Electrical Rating (Net MWe)_
655 6.
Maximum Dependable Capacity (Gross MWe) 690 7.
Maximum Dependable Capacity (Net MWe)___670 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None 9.
Power Level To Which Restricted, If Any (het MWe)
None
- 10. Reasons For Restrictions, If Any N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 8040.0 105000.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 69746.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 0.0 67534.0_
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0.0 0.0 116932632.0
- 17. Gross Electrical Energy Generated (MWH) 0.0 0.0
_39228314.0 Net Electrical Energy Generated (MWH) 0.0 0.0 37693409.0 v.
- 19. Unit Service Factor 0.0 0.0 64.8
- 20. Unit Availability Factor 0.0 0.0 64 3 t
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 53.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 54.8
- 23. Unit Forced Outage Rate 0.0 0.0 9.2 24 Sh;tdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown for refuelina and recirculation DiDe reDlacement - Outaae comenced on December 10. 1983.
- 25. If Shut Down At End Of Report Period Estimated Date of Startup Dec. 1984
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
e l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-293 UNIT NAME Pilerim 1 DATE 12/11/84 COMPLETED BY P. Hamilton TELEPHONE (617) 746-7900 REPORT MONTH Novembe. 1984 METHOD OF LICENSE CAUSE & CORRECTIVE DURATION SHUTTING EVENT SYSTEN COMPONENT ACTION TO NO.
DATE TYPEI (HOURS)
REASON 2 DOWN REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE l
16 83/12/10 S
720.0 C
1 N/A N/A N/A N/A - Shutdown for
~
refueling and recirculation pipe replacement.
i l
i 1
2 2
3 4&5 F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-1022) 9 n<
.a
REFUELING INFORMATION The following refueling information is included in the Monthly Report as i
requested in an NRC letter to BECo, dated January 18, 1978:
l For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
i 1.
The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2.
Scheduled date for next Refueling Shutdown: August 1986 l
3.
Scheduled date for restart following refueling: December 1984 j
4.
l S.
Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6.
The new fuel, which is being loaded this refueling outage, is of the same i
P8x8R design, as loaded the previous outage and consists of 160 P8DR8282 j
assemblies and 32 GE6B-P8DR8282 assemblies.
i 7.
(a) There are 580 fuel assemblies in the core.
(b)
There are 1,128 fuel assemblies in the spent fuel pool.
1 i
8.
(a)
The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel i
assemblies at present.
I (b) The planned spent fuel storage capacity is 2320 fuel assemblies.
f 9.
With present spent fuel in storage, the spent fuel pool now has the j
capacity to accommodate an additional 642 fuel assemblies.
i 1
}
i t
4
,,n.,.n,----
g.nn-w
,--,_,,..m.,
,e.,
--,n-----,-...
,a,-e.---.--,n, n
-n-,-,,.
l l
Month November 1984 PILGRIM NUCLEAR POWER STATION MAJOR' SAFETY RELATED MAINTENANCE i
CORRECTIVE ACTION i
SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT ASSOCIATED l
RECURRENCE LER I
i HVAC Fire Missing Installation Install Isolated Update LER Damper Oversight Incident 84-007 (To be issued.)
l Cont.
Valve Failed Packing Repacked N/A Update LER
(
Atmos.
A0-5033B App. "J" LLRT Leak Valve 83-065 (To be Control issued.)
l l
l l
L i
l i
1 BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 Operational Summarv for November 1984 The Unit has been shut down all month for Refuel Outage #6.
Refuel operations were completed on 11/14/84. The reactor vessel hydro commenced on 11/30/84.
.All outage work continued.
Safety Relief Valve challenges Month of November 1984 Requirement: NUREG-0737 T.A.P.
II.K.3.3 Reason: No safety / relief valve challenges occurred during the month of November 1984. Refuel Outage #6 is in progress.
e...
BOSTON EDISON COMPANY I
500 SOVLaTON STREET SOsTON, M AusACHUBETTS O2199 l
WILLIAM D. HARRINGTON 5~.$1.""'~~*~~
December 11, 1984 BECo Ltr. #84-208 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk License No. DPk-35 Docket No. 50-293
Subject:
November 1984 Nonthly Report
Dear Sir:
In accordance with PNPS Technical Specification 6.9. A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.
Respectfully submitted, W. D. Harrington
- caw Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
< >