Monthly Operating Rept for Feb 1984
ML20087G896
Person / Time
Site: Pilgrim
Issue date: 02/29/1984
From: Hamilton P, Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BECO-84-042, BECO-84-42, NUDOCS 8403200164
Download: ML20087G896 (7)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

5C-293 UNIT Pilgrirn i March 13,1984 DATE COMPLETED BY P. Hamiiton (617) 746-7900 TELEPHONE MONTH February 1984

+

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) g O.

0.

g7 0.

0.

2 gg 0.

0.

3 9

0.

4 20 O*

5 21 0.

0.

6 0.

7 23 0.

0 0.

8 24 0.

9 25 10 0.

O.

II 0.

O.

0.

0.

12 28

'O.

0.

13 29 14 30 NA II 33 NA 0.

16 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawatt.

(9/77) 8403200164 840229 bl PDR.ADOCK 05000293 s

,R

__ pon;

i OPERATING DATA REPORT DOCKET NO.

50-293 DATE March 13. 1984 COMPLETED BY P. J. Hamiiton TELEPHONE (617) 746-7900 OPERATING STATUS Notes I. Unit Name:

PiIqrim i

2. Reporting Period:

Iebruary I984 I990

3. Licensed Thermal Power (MWt):

678.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

655.

6. Maximure Dependable Capacity (Gross MWe):

690.

7. Maximum Dependable Capacity (Net MWe):

670.

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted.lf Any (Net MWe):

^

N/A

10. Reasons For Restrictions.If Any:

This Month Yr..to.Date Cumulatise i1. Hours in Reporting Period 696.0 l440.0 98400,o

12. Number Of Hours Reactor Was Critical ~

0.0 0.0 69746.3 0.0 0.0 0.0

13. Reactor Reserse Shutdown Hours
14. Hours Generator On.Line 0.0 0.0 67534.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 0.0 0.0 ti6932632.0
16. Gross Thermal Energy Generated IMWH).

0.0 0.0 392283!4.0

17. Gross Electrical Energy Generated iMWH1 0.0 0.0 37693409.0
18. Net Electrical Energy Generated (MWH) q
19. Unit Service Factor 0.0 0.0 68.6 0.0 0.0 68.6
20. Unit Availability Factor 0.0 0.0 57.2
21. Unit Capacity Factor (Using MDC Net p 0.0 0.0 58.5
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Ontage Rate 0.0-0.0 9.2
24. Shutdowns Scheduled O<er Next 6 Months tType. Date.and Duration of Each t:

Shutdown for refueling and recirculation pipe repair.- Outage commenced on December 10, 1983.

September 1984

25. lf Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

' Forecast Achieved :

t

- INITIA L CRITICALITY :-

INITIAL ELECTRICITY J

COMMERCIAL OPERATION ~

- ("!77 ) ;

~

  • s ss
p

\\

50-293 UNir SilillDOWNS AND POWER REDtlCIIONS DOMET NO.

UNIT NAME PiIgrim i Mar,,C_fiam i l tonh IA Igg 4 DATE February 1984 COMPl.E f EH 11Y.

NEPOR T AIONill IEllPilONE (617) 746-7900 I

J l

t_ f' i

., E

-G' e

a.

$,C 15 "d I Y"'"

E't

$"l

~

cause A r. nceive N.O!

paie E.

W 19[,

L "'

a Aoin,,,,,

i

?

Ea E?

,s a =!

Repent c-in o Eu Pievent Reinnente

.o.

a:

6

.a..

1 6

l, K

, N/A(

N/A N/A N/A - Shutdown for refueling

- 16

^ 83/12/10

.S' 696.0 C

l' s

and recirculation pipe r

repair.

u

..t r

, I I.

.,1

/

vom Reason Method Svstem 8 Comoonent F-Forced A-Equip Failure F-Admin t-Manual Exhibit F 8 H 5-Sched. - B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other.

3-Auto Scram Preparation of l

D-Regulatory Restriction 4-Continued Data Entry Sheet i

E-Operator Training 5-Reduced Load Licensee Event Report l

8 License Examination 9-Other (LER) File (NUREG-0161)

O

REFUELING INFORMATION_

The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that,_ __

-each number corresponds to equivalent notation uti ized in the request.

l 1.

The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for next Refueling Shutdown:

March 1986 3.

Scheduled date for restart following refueling: September 1984 4.

5.

Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6.

The fuel, which had been loaded during the 1981 scheduled refueling cutage, is of the same P8x8R design, as loaded the previous outage consisting of 112 P8DRB282 assemblies and 60 P8DRB2G5 assemblies.

7.

(a) There are fuel assemblies in the core.

(b) There are1,708 fuel assemblies in the spent fuel pool.

+

8.

(a) The station is presently _ licensed to score 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9.

With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 62. fuel assemblies.

1 g

i e

A h

1

}

1 w

,,,.,.. +-. - - -.,,,

-,a

BOSTON EDISCM' COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO< 50-293 Or rational Summary for February 1984 m

The Unit-has been shut down alI month for the 1983 Refueling Outage and recirculation pipe repair.

All cutage work continues.

Safety Relief Valve Challenges Month of February 1984 Requirement:

T.M.I.

T.A.P.

II.K.3.3 Reason:

No safety / relief' valve challenges occurred during the month of-February 1984. Refuel Outage #6 is in progress.'

f 4

s

=

e.

N

/

, #,s

.. ~.

s M

d 3b-

~

~ ~, ~ *

.g y

_t>

-:c ;

, j'

);

s

PILCRIM NUCLEAR POWER STATION Month February 1984

~

MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT

. MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER RCIC 1301 Leaking Pre'ssure Steam Cut Replace with None - Routine Maintenance N/A Outboard Seal Ring new parts.

Steam isol.

Viv.

Salt MO-3808.SSW Valve would not Motor Replace motor.

None - Routine Maintenance N/A S:rvice Swing Valve operate.

Failure Watcr for Re-du,ndant Pump Main MSIV's-Failed App. "J" Probable Started Repair PDC 83-48 Installation Update to 83-065/

Steam LLRT Seat Wsar of Valve 03L-0 to be issued.

Internals e

J i

l'

=

t

e ISOSTON Et,150N COMPANY 500 NovLeTON ETREET BOSTON, M AssACHustTTs 02:99 WILLIAM D. HARRINGTO N March 13 1984

.................n x.uu.

BECo Ltr. #84-042 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk Docket No. 50-293 License DPR-35

Subject:

February 1984 Monthly Report

Dear Slr:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your inforrution and planning.

Respectfully submitted, libQ Willlam mD. Har 'agton

caw Attachment cc; Regional Administrator, Region i U.S. Nuclear Regulatory Commission 631-Park Avenue King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission p

Document Control Desk Washington, D.C.

20555 I