INDIANA MICHIGAN*
POWER A unit of American Electric Power August 1, 2019 Docket Nos.: 50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 1 Form OAR-1, Owner's Activity Report Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106
- lndianaMichiganPower.com AEP-NRC-2019-35 10 CFR 50.55a This letter provides a copy of Form OAR-1, Owner's Activity Report, for lnservice Inspection activities performed at Donald C. Cook Nuclear Plant Unit 1 through the completion of the Unit 1 Cycle 29 Refueling Outage. This report meets the requirements of the American Society of Mechanical Engineers (ASME) Code Case N-532-5; "Repair/Replacement Activity Documentation Requirements and lnservice Inspection Summary Report Preparation and Submission Section XI, Division 1." This code case is used as an alternative to the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6000, as approved by Regulatory Guide 1.147, "lnservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 18, for the current inspection interval.
The Authorized Code Inspection Company is OneCIS Insurance Co., of Lynn, Massachusetts. The Authorized Nuclear lnservice Inspector is Timothy H. Merchant.
There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Director of Regulatory Affairs, at (269) 466-2649.
~~~
Michael K. Scarpello Director of Regulatory Affairs MBE/mll
Enclosure:
Form OAR-1, Owner's Activity Report for Donald C. Cook Nuclear Plant Unit 1 Cycle 29 Refueling Outage
U. S. Nuclear Regulatory Commission Page 2 c:
R. J. Ancona - MPSC R. F. Kuntz, NRC Washington D.C.
EGLE - RMD/RPS NRC Resident Inspector D. J. Roberts, NRC Region Ill A. J. Williamson -AEP Ft. Wayne, w/o enclosures AEP-NRC-2019-35 to AEP-NRC-2019-35 Form OAR-1, Owner's Activity Report for Donald C. Cook Nuclear Plant Unit 1 Cycle 29 Refueling Outage
D. C. Cook Nuclear Unit 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 1-2019-4-3-02 Plant Donald C Cook Nuclear Plant, One Cook Place, Bridgman, Michigan 49106 Unit No.
Commercial service date 8/23/1975 Refueling outage no.
(if applicable)
Current inspection interval 4th for Components and Supports (C&S) and 2nd for Containment ISi (GISI) Program (1s~ 2nd, 3rd, 4th, other)
Current inspection period 3rd for C&S and 3rd for GISI (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition/No Addenda Date and revision of inspection plans 12/20/2018 Rev 9 for C&S, 1/17/2019 Revision 7 for GISI Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Edition and Addenda are the same as the Inspection Plans Code Cases used_ for in~~':_~Uo-~_,md evaluation:
N-566-2 and N-722-1 for C&S, N-649 for GISI (If applicable, including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1C29 U1C29 conform to the requirements of Section XI.
(refueling outage number)
Signed
, ISi Program Owner Date 7{1e:,{ 201?
Owners or Owne~s Designee, TiUe CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by
.. -~ OneCIS Insurance _Co.
_ of Lynn, MA have inspected the items described in this Owner's Activity Report;1\\nd state that, to the-tiest of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
t u--:2 n B,, -r,,
Commissions 1 ~ ;:o
..J-..
--'---'---"---'---=:...._ ______________________
National Board Number and Endorsement Date 7-l'P-Zo(9 Page 1 of 3
D. C. Cook Nuclear Unit 1 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description None None None i
.I I
Page 2 of 3
Code Class 1
2 3
3 MC MC MC MC D. C. Cook Nuclear Unit 1 Table 2 Abstract of Repair/replacement Activities Required for Continued Service Item Description Description of Work Date Completed Repair/Replacement Plan Number Examination Category: B-N-3 Item No.; 813.70 Replace 188 Baffle Former Bolts 4/14/2019 55501078-18 Parts Examined: Core Support Structure 1-CS-438-3 Replace piping with rejectable indications 4/20/2019 55531336-06 1-HV-AFP-T2AC Replace room cooler due to tube leak 4/19/2019 55531390-01 1-QFA-240-0R Replace piping with rejectable indications 4/12/2019 55530303-02 1-AIRLOCK-C650 Replace one bolt for equipment hatch 4/23/2019 55508600-04 1-CPN-80 Replace blind flange bolting 4/7/2019 55510711-16 1-CPN-57 Replace blind flange bolting 4/7/2019 55510711-17 1-CPN-83 Replace swing bolt 4/22/2019 55530779-01 Page 3 of 3