AEP-NRC-2010-21, Fourth Ten-Year Interval Inservice Inspection Program Plan

From kanterella
Jump to navigation Jump to search
Fourth Ten-Year Interval Inservice Inspection Program Plan
ML100750675
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/12/2010
From: Hruby R
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2010-21
Download: ML100750675 (2)


Text

NNDIANA MICHIGAN Indiana Michigan Power B101 WE One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power Indiana Michigan Power. com

'March 12, 2010 AEP-NRC-2010-21 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

, Donald C. Cook Nuclear Plant Units 1 and 2 Docket No. 50-315 and 50-316 Fourth Ten-Year Interval Inservice Inspection Program Plan

References:

1. Letter from L. Raghavan, U. S. Nuclear Regulatory Commission (NRC), to M. K. Nazar, Indiana Michigan Power Company (I&M), "Donald C. Cook Nuclear Plant, Units 1 and 2 (DCCNP-1 and DCCNP-2) - Relief Request ISIR-19 Regarding Class 1 and 2 Piping Weld Inspection Requirements (TAC Nos.

MC8569 and MC8570)," dated May 31, 2006 (ML060820513).

2. Letter from P. S. Tam, NRC, to M. K. Nazar, I&M, "Donald C. Cook Nuclear Plant, Unit 1 and 2 - Correction of Safety Evaluation RE. Relief Request ISIR-19 Regarding Class 1 and 2 Piping Weld Inspection Requirements (TAC Nos.

MC8569 and MC8570)," dated December 29, 2006 (ML063420033).

3. Letter from L. M. James, NRC, to J. N. Jensen, I&M, "Donald C. Cook Nuclear Plant, Unit 1 and 2 - Relief Requests (ISIR-23, ISIR-24 and ISIR-25) for Inservice Pressure Testing Program (TAC Nos. MD9438 and MD9439)," dated February 18, 2009 (ML090330065).

Dear Sir or Madam:

In accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, Paragraph IWA-1400(c), Indiana Michigan Power Company (I&M) is enclosing an approved copy of the Donald C. Cook Nuclear Plant (CNP) Units 1 and 2 Inservice Inspection (ISI)

Program Plan for the Fourth Ten-Year Interval. The fourth ten-year interval commences on March 1, 2010, and concludes on February 29, 2020. A description of the program is included in the enclosure.

References 1, 2, and 3 approved relief requests for the CNP third ten-year ISI interval. I&M is requesting NRC review and approval of this same set of relief requests for the fourth ten-year interval. Section 5.0, Relief Requests, of the enclosure, ISI Program Plan Fourth Ten-Year Inspection Interval, provides a detailed description of the relief requests. I&M is providing the ISI Program Plan Fourth Ten-Year Interval for information only. I&M is not requesting NRC approval of the program plan.

U. S. Nuclear Regulatory Commission AEP-NRC-2010-21 Page 2 NRC review and approval of the relief requests in Section 5.0 of the ISI Program Plan Fourth Ten-Year Interval is requested by September 1, 2010, for application during the CNP Unit 2 Cycle 19 refueling outage.

There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. James M. Petro, Jr., Regulatory Affairs Manager, at (269) 466-2489.

Sincerely, Raymond A. Hruby, Jr.

Vice President - Site Support Services RSP/rdw

Enclosure:

Donald C. Cook Nuclear Plant Units 1 & 2 ISI Program Plan Fourth Ten-Year Inspection Interval c: T. A. Beltz - NRC Washington, DC J. T. King - MPSC S. M. Krawec, Ft. Wayne AEP, w/o enclosure MDNRE - WHMD/RPS NRC Resident Inspector M. A. Satorius - NRC Region III