AECM-87-0099, Monthly Operating Rept for Apr 1987

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1987
ML20214D770
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/30/1987
From: Hobbs S, Kingsley O
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AECM-87-0099, AECM-87-99, NUDOCS 8705210467
Download: ML20214D770 (4)


Text

..

Attachment t2 AECM-87/0099 DOCKET NO.

50-416 DATE 05/01/87 COMPLETED BY S. Hobbs TELEPHONE (601) 969-2458

-OPERATING STATUS 1.

Unit Name:: GGNS UNIT 1 l Notes:

l

~ :2. Reporting Period: April 1987 l

l 3._ Licensed Thermal Power (MWt): 3833 MWt l

l 4,

Nameplate Rating (Gross MWe): 1372.5 MWe

l l

S.

Design Electrical Rating (Net MWe): 1250 MWe l

l

-6.

Maximum Dependable Capacity (Gross MWe): 1157 MWe_

l l

7.

Maximum Dependable Capacity (Net MWe): 1108 MWe l

' l 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

'9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr to Date Cumulative

11. Hours In Reporting Period 719 2,879 22,137 12.-Number of Hours Reactor Was critical 719 2,744.7 15,093.5
13. Reactor Reserve Shutdown Hours 0

0 0

-14. Hours Generator On-Line 719 2,693.9 13,771.4

15. Unit' Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2,670,875 9,231,447 39,842,557

-17. Cross Electrical Energy Generated (MWH) 879,920__

3,023,740 12,129,660__

18. Net Electrical Energy Generated (MWH) 845,718 2,896,118 11,469,884
19. Unit Service Factor 100.0 93.6 66.7
20. Unit Availability Factor 100.0 93.6 66.7
21. Unit Capacity Factor (Using MDC Net) 106.2 90.8 54.2

-22. Unit Capacity Factor-(Using DER Net) 94.1 80.5 48.1

15. Unit Forced Outage Rate 0.0 0.0 8.2
24. Shutdowns-Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units In Test Status (Prior to Commercial Operation).

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 8705210467Syg DR ADOCK 05

(

3 I

\\

J18AECM87051401 - 3 g-,,

_.,,.,y_-,,.p e

e AttachmentSto AECM-87/0099' DOCEET NO. 50-416-UNIT 1

DATE 05/01/87 COMPLETED BY S. Hobbs TELEPHONE (601) 969-2458 HONTH April 1987 DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1183 17 1202 2

1181 18 1181 3

1213 19 1194-4 924 20

-1186 5

938 21 1184

-6 1169 22 1194 7

1216 23 1201 8

1214 24 1206 9

1207 25 1177

-10 1201 26 1200 11 1194 27 1189 12 -

1137 28 1192

.13 1187 29 1198 14-1210 30 1183 15 1207 31 16-1211 i

l J18AECM87051401 - 4 L-

Attachment to AECM-87/0099 e-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCEET NO. 50-416 UNIT NAME I

DATE 05/01/87 COMPLETED BY S. Hobbs TELEPHONE (601) 969-2458 REPORT MONTH Aptil 1987 I

I I

I I

I l-1 I

I I

I l

l l

l l Method of I Licensee l

l l

Cause & Corrective.

l I No. I Date l Type IDurationi Reason l Shutting Downl Event l System lConsponent l Action.To l

l l

l (1) l Hours I

(2) i Reactor l Report #

l Code l-Code l

Prevent Recurrence 1

l l

l l

l 1

(3)

I

~l (4) l (5)

{

.l l

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I l

l 187-9 104/04/871 S I

0.0 i H l

5 I

NA I NA I NA l Power reduction for control l

l l

I l

l l

l l

l l rod sequence exchange and to I

l l

l l

l l

l l

l l transfer steam jet air ejector l

I l

l l

1 l

l l

l l operation from SJAE "A" to I

i i

l l

l l

l l

l l SJAE."B".

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I l

l 1

l l

I I

I I

I I

-l l

l l

l l

1 1

I I

I I

l l

l l

l 1

1 I

I l

l l

l l

l I

I I

I l

-l l

1 l-1

)

I I

I I

I I

I l-1 I

l i

1 2

3 4

F: Forced Reason:

Method:

Exhibit G.- Instructions S: Scheduled A-Equipment Failure 1-Manual.

for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161) 3 D-Regulatory Restriction 5-Reduced load E-Operator Training &

6-Other Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source (Explain)

H-Other (Explain)

,o

/

mysTEMEMMY MmDtA9CES, IM.

Otra D KtCAEY.Jr E&y"7$w,,

May 15, 1987 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 4

License No. NPF-29 Monthly Operating Report AECM-87/0099 In accordance with the requirement of Technical Specification 6.9.1.10, System Energy Resources, Inc. (SERI) is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit i for April, 1987 (attachment).

If you have any questions or require additional information, please contact this office.

Yours truly, d

ODK:mbl Attachment Dggy cc: Mr. T. H. Cloninger (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. C. Butcher (w/a)

Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 e

e o een 2rm j xra van m:src l c> wuc g\\

~

J18AECM87051401 - 1