Attachment to AECM-84/0125 Page 1 of 6 OPERATING DATA REPORT DOCKET NO. 50-416 DATE 5/15/84 COMPLETED BY J. G. Cesare TELEPHONE 601-969-2585 OPERATING STATUS Notes

1. Unit Name:

Grand Gulf Nuclear Station

2. Reporting Period:

April 1984 191

3. Licensed Thermal Power (MWt):

1372.5

4. Nameplate Rating (Gross MWe):

1250

5. Design Electrical Rating (Net MWe):

NA

6. Maximum Dependable Capacity (Gross MWe):

NA

7. Maximum Dependable Capacity (Net MWe):
8. If Chanys Occur in Capacity Ratings (Iten.s Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Lesel To which Restricted,1f Any (Net MWe):

NA

10. Reasons For Restrictions. lf Any: as restricted by 0.L. NPF-13 as listed in 3.0 above This Month Yr..to-Date Cumulative 720 2,904 5,832
11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 194.0 194.0 1.189.3
13. Reactor Resene Shutdown Hours 0

0 0

14. Hours Generator On.Line 0

0 0

15. Unit Reserve Shutdown Hours 0

0 0~

16. Gross Thermal Energy Generated (MWH) 20.671 20.671 98.059
17. Gross Electrical Energy Generated (MWH) 0 0

0

18. Net Electrical Energ) Generated (MWHi 0

0 0

19. Unit Senice Factor NA NA NA
20. Unit Availability Factor NA NA NA
21. Unit Capacity Factor (Using MDC Net)

NA NA NA

22. Unit Capacity Factor (Using DER Net)

NA NA NA

23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Oser Next 6 Months IType. Date and Duration of Each t:

NA i

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA l

26. Units in Test Status (Prior o Commercial Operationl:

Forecet Achiesed INITIA L CRITICALITY 8/18/82 INITIAL ELECTRICITY 6/84 COM4f ERCI AL OPER ATION 12/84 8405240316 840430

[

PDR ADOCK 05000416 go/77 )

R PDR

Attachmerit to AECM-84/0125 INSTRUCTIONS FOR COMPLETING OPERATING DATA REPORT Page 2 of 6 This report should be furnished each month by licensees. The name and telephone number of the preparer should be provided in the designated spaces. The instructions below are provided to assist licensees in reporting the data consistently. The number of the mitruction corresponds to the item number of the report format

1. UNIT NAME. Self-explanatory.

or of commercial operation, whichever comes last, to the end of the period or decommissioning, whichever comes

2. REPORTING PERIOD. Designate the month for which first. Adjustments in clock hours should be made in the data are presented.

which a change from standard to daylight savings time (or vice versa) occurs.

3. LICENSED THERMAL POWER (MW )is the maximum t

thermal power, expressed in megawatts, currently auth-

12. NUMBER OF HOURS REACTOR WAS CRITICAL.

orized oy the Nuclear Regulatory Commission.

Show the total number of hours the reactor was critical during the gross hours of the reporting period.

4. NAMEPLATE RATING (GROSS MW,). The nameplate power designation of the turbine-generator in megavolt
13. REACTOR RESERVE SHUTDOWN HOURS. The total amperes (MVA) times the nameplate power factor of the number of hours during the gross hours of reporting turbine generator.

period that the reactor was removed from service for administrative or other reasons but was available for

5. DESIGN ELECTRICAL RATING (NET MW ) is the operation.

e nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.

14. HOURS GENERATOR ON LINE.

Also called Service H rs. The total number of hours expressed to the near-

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MW )

e est tenth of an hour during the gross hours of the re-is the gross electrical output as measured at the output porting period that the unit operated with breakers terminals of the turbine-generator during the most re-closed to the station bus. These hours, plus those listed strictive seasonal conditions.

in Unit Shutdowns for the generator outage hours, should

7. MAXIMUM DEPENDABLE CAPACITY (NET MW,).

Maximum dependable capacity (gross) less the normal

15. UNIT RESERVE SHUTDOWN HOURS. The total num-station service loads.

ber of hours expressed to the nearest tenth of an hour during the gross hours of the reporting period that the S. Self-explanatory.

unit was removed from service for economic or similar

  • ** " 5 "I ******"*
  • P*" " "
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MW,).

Note that this item is applicable only if

16. GROSS THERMAL ENERGY GENERATED (MWH).

restrictions on the power level are in effect. Short tenn liess than one month) limitations on power level need The thermal output of the nuclear steam supply system not be presented in this item.

during the gross hours of the reporting period, expressed in megawatt hours (no decimals).

Since this information is used to develop figures on capa-city lost due to restrictions and because most users of the

17. GROSS ELECTRICAL ENERGY GENERATED (MWH).

" Operating Plant Status Report" are primarily interested The electrical output of the unit measured at the output in energy actually fed to the distribution system. it is terminals of the turbine-generator during the gross hours requested that this figare be expressed in MWe Net in of the reportmg period, expressed in megawatt hours (no spite of the fact that the figure must be derived from decimals).

MWt or percent power.

18. NET ELECTRICAL ENERGY GENERATED IMWH).
10. REASONS FOR RESTRICTIONS. IF ANY. If item 9 The gross electrical output of the unit measured at the is used, item 10 should explain why. Brief narrative is output terminals of the turbine. generator minus the nor-acceptable. Cite references as appropriate. Indicate mal station service loads during the gross hours of the whether restrictions are self-imposed or are regulatory reporting period, expressed in megawatt hours. Negative reqd ements. Be as specific as possible within space limi-quantities should not be used. if there is no net pcsitive tations. Plants in startup and power ascension test phase value for the period. enter zero (no decimals),

should be identified here.

I1. HOURS IN REPORTING PERIO9. For units in power 19-For units still in the startup and power ascension test ascension at the end of the period, the gross hours from

23. phase. items 19 23 should not be computed. Instead. enter the beginning of the period or the first electrical produe-N/A in the current month column. These five factors tion, whichever comes last. to the end of the period.

should be computed starting at the time the unit is de-clared to be in commercial operation. The cumulative For units in commercial operation at the end of the figures in the second and third columns should be based penod, the gross hours from the beginning of the period on commercial operation as a starting date.

GGD

l

\\

Attachment to j

AECM-54/0125 Page 3 of 6

19. UNIT SERVICE FACTOR. Compute by dividing hours the generator was on line (item 14) by the gross hoursin the reporting period (item 11). Express as percent to the nearest tenth of a percent. Do not indude reserve shut-down hours in the calculation.
20. UNIT AVAILABILITY FACTOR. Compute by dividing the unit available hours (item 14 plus item 15) by the gross hours in the reporting period (item i1). Express as percent to the nearest tenth of a percent.
21. UNIT CAPACITY FACTOR (USING MDC NET). Com-pute by dividing net electrical energy generated (item 18) by the product of maximum dependable capacity (item
7) times the gross hours in the reporting period (item 11).

Express as percent to the nearest tenth of a percent.

22. UNIT CAPACITY FACTOR (USING DER NET). Com-pute as in item 21. substituting design electrical rating (item 5) for maximum dependable capacity.

'23. UNIT FORCED OUTAGE RATE. Compute by dividing the total forced outage hours (from the table in Unit Shutdowns and Power Reductions) by the sum of hours generator on line (item 14) plus total forced outage hours (from the table in Unit Shutdowns and Power Reductions).

Express as percent to the ne,mt tenth of a percent.

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH). Include type (refueling. maintenance, other), proposed date of start of shutdown, and proposed length of shutdown.

It is recognized that shutdowns may be scheduled between r3 ports and that this item may not be allinclusive. Be as accurate as possible as of the date the report is prepared.

This item is to be prepared each month and updated if appropriate until the actual shutdown occurs.

25. Self-explanatory.
26. Self-explanatory.' Note, however, that this information is requested for all units in startup and power ascension test status and is not required for units already in com-mercial operation.

TEST. STATUS is defined as that period following ini.

tial criticality during which the unit is tested at succes-sively higher outputs culminating with operation at full power for a sustained period and completion of war-ranty runs. Following this phase the unit is generally considered by the utility to be available for commercial operation.

Date of COMMERCIAL OPERATION is denned as the date that the unit was declared by the utility owner to be available for the regular production of electricity, usually related to the satisfactory completion of quali-fication tests as specined in the purchase contract and to the accounting policies and practices of the utihty.

to n

Attachment to AECM-84/0125 AVERAGE DAILY UNIT POWER LEVEL Page 4 of 6 DOCKET NO..50-416 UNIT 1

5/15/84 DATE COMPLETED BY J. G. Cesare TELEPHONE 601-969-2585 MONTH April 1984 DAY AVERAGE DAILY PO'.fER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I No Power Generated 37 2

18 3

39 4

20 5

21 6

22 7

23 8

24 9

25 10 26 11 27 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power leselin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

U)l77 )

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME 1

DATE 5/15/84 COMPLETED BY

3. G.

Cesare REPORT MONTH April TELEPHONE 6nt-464-?sas w.

t e.o E c

=

ci lic "5CC 5%

Cause & Corrective No' Date E.

5 _5

?5y Event l?

g3 Action to S.3

-0

-5 g e O

$Ej Report e in U Prevent Recurrence CO g

d 4

11/9/83 S

526.0 F

1 NA NA NA Continuation of outage following completion of low power testing.

Restart commenced 4/22/84.

l a

1 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions yy>

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data mM" B-Maintenance '.,. l'est 2-Manual Scram.

Entry Sheets for Licensee

$@E C-C-6+t '" 6 3-Automatic Scram.

Event Repor (LER) File (NUREG.

uf3@.

D-Regulatory Restriction 4-Other (Explain )

0161)

  • 9 E-Operator Training & License Examination N$

F. Administrative 5

m["

G-Operational Error (Explain t Exhibit i. Same Source ug (9/77)

II-Ot her (Explain)

r Attachment to UNIT SHUTDOWNS AND POWER REDUCTIJNS AECM-84/0125 Page 6 of 6 INSTRUCTIONS This report should describe all plant shutdowns during the in accordance with the table appearing on the report form.

report period, in addition,it should be the source of explan-If category 4 must be used, supply brief comments.

ation of significant dips in average power levels. Each signi-ficant reduction in power level (greater than 20% reduction LICENSEE EVENT REPORT #.

Reference the applicable in average daily power level for the preceding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) feportable occurrence pertaining to the outage or power should be noted, even though the unit may not have been reduction. Enter the first four parts (event year, sequential l

shut down completely. For such reductions in power level,

'eport number, c,ccurrence code and report type) of the five the duration should be listed as zero, the method of reduction part designation as described in item 17 of Instructions for should be listed as 4 (Other), and the Cause and Corrective Preparation of Data Entry Sheets for Licensee Event Report Action to Prevent Recurrence column should explain. The (LER) File (NUREG-0161). This information may not be Cause and Corrective Action to Prevent Recurrence column immediately evident for all such shutdowns, of course, since should be used to provide any needed explanation to fully further investigation may be required to ascertain whether or describe the circumstances of the outage or power reduction.

not a reportable occurrer a was invohed.) If the outage or power reduction will not result in a reportable occurrence.

NUMBER. This column should indicate the sequential num-the positive indication of this lack of correlation should be ber assigned to each shutdown orsignificant reduction in power noted as not applicable (N/A).

for that calendar year. When a shutdown or significant power reduction begms in one report period and ends in another, SYSTEM CODE. The system in which the outage or power an entry should be made for both report periods to be sure reduction originated should be noted by the two dig't code of i

all shutdowns or significant power reductions are reported.

Exhibit G - Instructions for Preparation of Data Entry Sheets Until a unit has achieved its first power generation, no num-fer Licensee Event Report (LER) File (NUREG 0161).

ber should be assigned to each entry.

Systems that do not fit any existing code should be designa-ted XX. The code ZZ should be used for those events where DATE. This column should indicate the date of the start a system is not applicable.

of each shutdown or significant power reduction. Report as year, month, and day. August 14.1977 wouM be reported COMPONENT CODE. Select the most appropriate component as 770814. When a shutdown or significant power reduction from Exhibit i Instructions for Preparation of Data Entry beginsin one report period and ends in another, an entry should Sheets for Licensee Event Report (LER) File (NUREG 0161),

be made for both report periods to be sure all shutdowns using the following critieria:

or significant power reductions are reported.

TYPE. Use "F" or "S" to indicate either " Forced" or " Sche-duled," respectively, for each shutdown or significant power B.

If not a component failure, use the related component:

reduction. Forced shutdowns include those required to be e.g., wrong valve operated through error; list valve as initiated by no later than the weekend following discovery component.

of an off-normal condition. It is recognized that some judg-ment is required in categorizing shutdowns in this way, in C.

If a chain of failures occurs, the first component to mal-general, a forced shutdown is one that would not have been function should be listed. The sequence of events,includ-completed in the absence of the condition for which corrective ing the other components which fail, should be described action was taken.

under the Cause and Corrective Action to Prevent Recut-rence column.

DURATION. Self-explanatory. When a shutdown extends beyond the end of a report period, count only the time to the Components that do not fit any existing code should be de-end of the report period and pick up the ensuing down time s gnated XXXXXX. The code ZZZZZZ should be used for in the following report periods. Report duration of outages events where a component designation is not applicable.

rounded to the nearest tenth of an hour to facilitate summation.

The sum of the total outage hours plus the hours the genera-CAUSE & CORRECTIVE ACTION TO PREVENT RECUR.

tor was on line should equal the gross hours m the reportmg RENCE. Use the column in a narrative fashion to amplify or period.

expla n the circumstances of the shutdown or power reduction.

The column should include the specific cause for each shut.

REASON. Categorize by lettes designation in accordance down or significant power reduction and the immediate and with the table appearing on the report form. If category 11 contemplated long term corrective action taken,if appropri-

=:2 be used, supply brief comments.

ate. This column should also be used for a description of the major safet)-related corrective maintenance performed during METHOD OF SHUTTING DOWN THE REACTOR OR utage or p wer reduction including an identification of t

REDUCING POWER.

Categonie b) number designation the entical path activity and a report of any single release of radioactivity or smgle radiation exposure specifically associ-INote that this ditfers from the Edison Electric Institute ated with the outage which accounts for more than 10 percent (EEll dennitions of " Forced Partial Outage" and " Sche.

of the allowable ar. iual values.

duled Partial Outagef for these terms. I i i uses.: change of For long textual reports continue narrative on separate paper 30 MW as the break pomi. For larger power reactors.30 MW and reference the shutdown or power reduction foi this I5 lod bmJll J change tai wariant espiariatiori.

narrative.

P!77

s P MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 164 0, J A C K S O N, MI S SIS SIP PI 3 9 2 0 5 May 15, 1984 NUCLEAR PRODUCTION DEPAPTMENT Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Document Control Desk

Dear Mr. DeYoung:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Monthly Operating Report AECM-84/0125 In accordance with 10CFR50.36, Mississippi Power & Light Company (MP&L) is providing twelve copies of the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for April,1984 (attachment).

If you have any questions or require additional information, please contact this office.

Yours truly,

. F. Dale Manager of Nuclear Services GWD/JGC:lm Attachment cc:

Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. N. S. Reynolds (w/o)

Mr. G. B. Taylor (w/o)

Mr. J. P. O'Reilly, Regional Administrator (w/a)

U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Chief (w/2)

Office of Resource Management U.S. Nuclear Regulatory Commission d

Washington, D.C.

20555 AJ1 i

Member Middle South Utilities System