3F1297-34, Forwards LERs 97-039-00 & 97-040-00 Re Administrative Oversight,Submitted to NRC Without Rept Dates Being Added to Page 1 of NRC Form 366

From kanterella
(Redirected from 3F1297-34)
Jump to navigation Jump to search
Forwards LERs 97-039-00 & 97-040-00 Re Administrative Oversight,Submitted to NRC Without Rept Dates Being Added to Page 1 of NRC Form 366
ML20202F922
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/04/1997
From: Grazio R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202F927 List:
References
3F1297-34, NUDOCS 9712090262
Download: ML20202F922 (1)


Text

__

o

@' Florida Power EP.mJ5?

C::.L.-n December 4,1997 3F1297-34 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Licensee Event Report (LER) 50-302/97-039-00 and Licensee Event Report (LER) 50-302/97-040-00

References:

1. FPC to NRC letter,3F1297-07, dated December 3,1997
2. FPC to NRC letter,3F1297-23, dated December 4,1997

Dear Sir:

Due to an administrative oversight, the subject LERs were submitted to the NRC without the Report Dates being added to Page 1 of NRC Form 366.

Please replace the first page of the corresponding LERs with the attached.

If you have any questions regarding this replacement, please contact Mr. David Kunsemiller, Manager, Nuclear Licensing at (352) 563-4566.

Sincerely, R..bzio Director Nuclear Regulatory Affairs REG /cju

[6 N i

Attachments xc:

NRR Project Manager Regional Administrator, Region 11 Senior Resident inspector llllllllllll]llll[ll[]lllllll 9712090262 971204 PDR ADOCK 05000302 S

PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W Power une Street a C9stal River. Fionda 344284708 * (352) 7954486

/ Flonda Progress Company