3F1193-12, Forwards Rev 6-3 to Physical Security Plan.Encl Withheld (Ref 10CFR73.21)
| ML20058E720 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/18/1993 |
| From: | Boldt G FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F1193-12, NUDOCS 9312070138 | |
| Download: ML20058E720 (1) | |
Text
a
@,*C0mF0mATi0N BAFEGUARDS R4FORMATK)N Flonda Power i
Crystal River Unit 3 Docket No. 50-302 ENCLOSURE CONTAINS November 18,1993 SAFEGUARDS INFORMATION.
3F1193-12 UPON SEPARATION THIS CONTROLLED COPY U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Physical Security Plan, Revision 6-3
Dear Sir:
Pursuant to the provisions of 10 CFR 50.54(p), Florida Power Corporation is hereby submitting Revision 6-3 to the Physical Security Plan. These changes do not decrease the safeguards effectiveness of the Plan or its implementation. This submittalincludes a description and eva: nation of the changes and the replacement pages for the Plan.
The attachment contains Safeguards Information and, as such, shall be withheld from public disclosure and protected in accordance with 10 CFR 73.21.
Sincerely, s
G.L.
dt Vice President Nuclear Production GLB/ck Attachments cc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager (w/o attachment)
/
i Crystal Rwer Energy Complex
- 15760 W. Power Une St.
- Crystal River, FL 34428-6708 A Florida Progress Company 9312070138 931118 pDR ADOCK 05000302 l
t MGMDS INMEM PDR