3F1103-01, October 2003 Monthly Operating Report for Crystal River Unit 3

From kanterella
(Redirected from 3F1103-01)
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Crystal River Unit 3
ML033240068
Person / Time
Site: Crystal River 
Issue date: 11/11/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F1103-01
Download: ML033240068 (3)


Text

Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 November 11, 2003 3F1 103-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) October 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Sireet Crystal River, FL 34428



Lt.

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNi NAME FLCRP-3 DATE November 3, 200$

COMPLETEDBY J.E.Lane l

Xt TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (MonthfYear):

October 2003 MONTH YEAR TO DATE CUMULATIVE I

DESIGN ELECTRICAL RATING (MWe-Net) 860 2

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 73.5 6,624.5 164,739 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 72.0 6,623.0 162,438 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0

6 NET ELECTRICAL ENERGY GENERATED (MWH) 44,698 5,505,200 126,774,771

If APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE November 3, 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

October2003 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments 03-01 I014/2003 S

672.98 C

I Shutdown for Refuel Outage 13.

SUMMARY

Crystal River Unit 3 shutdown on 10/4/03 to start Refuel Outage 13. The unit is expected to return to service in the early part of November.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Exptain)

H-OTHER (Explatn)

(2) Method I-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)