3F1096-19, Submits Response to NRC GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions

From kanterella
(Redirected from 3F1096-19)
Jump to navigation Jump to search
Submits Response to NRC GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions
ML20134E137
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/18/1996
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1096-19, GL-96-06, GL-96-6, NUDOCS 9610310322
Download: ML20134E137 (2)


Text

-._

e4 Florida Power CORPORATION thusme October-18, 1996-3F1096-19 i

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk l

Washington, D.C.

20555-0001 l

i

Subject:

30 Day Response to NRC Generic Letter 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident l

Conditions"

Reference:

NRC to FPC letter, 3N0996-18, dated September 30, 1996 I

Dear Sir:

Florida Power Corporation (FPC) is submitting this response as required by Generic Letter (GL) 96-06. FPC has reviewed the elements of the GL as they apply to the Crystal River Unit 3 Nuclear Power Plant, and has determined that the requested actions will be performed.

FPC will complete the requested actions according to the schedule given in the GL, and will submit a written summary report of actions taken by January 27, 1997.

l Sincerely, I

/ Beard, Jr.

Senior Vice President Nuclear Operations PMB/SCP:ff 1

i xc:

Regional Administrator, Region II Senior Resident Inspector 3

0 NRR Project Manager j

9610310322 961018 cN PDR ADOCK 05000302 P

PDR l

CRYSTAL FWER ENERGY COMPLEX: 15760 W Power une St. Crystal FWyer, Flonda 344286708 e (352) 795-6486 A Fkwnda Progress Company

l*l U. S. Nuclear Regulatory Commission 3F1096-19 l

Page 2 of 2 t

l STATE OF FLORIDA COUNTY OF CITRUS l

P. M. Beard, Jr. states that he is the Senior Vice President, Nuclear Operations l

for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

l

/

P.

Beard, Jr.

l Senior Vice President i

Nuclear Operations l

P. M. Beard, Jr., personally known to me. Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this ][i day of October, 1996.

l l

/1MA (l_ k bOL h

d

/

Notary Public (print)

Notary Public (signature)

Pamsta M. Layton MY COWASSKW # CC512982 DMES i

l November 29,1999 90WlfD Delu TMDV FM4 saluRMCE. IRC.

6 l

.