3F0904-01, August 2004 Monthly Operating Report for Crystal River Unit 3

From kanterella
(Redirected from 3F0904-01)
Jump to navigation Jump to search
August 2004 Monthly Operating Report for Crystal River Unit 3
ML042650095
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/09/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0904-01
Download: ML042650095 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 September 9, 2004 3F0904-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - August 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) August 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River. FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE September 1, 2004 9

COMPLETED BY J. E. Lane t6.

TELEPHONE (352) 795-6486 x3 4 8 REPORTING PERIOD (Month/Year):

August 2004 MONTH YEAR TO DATE CUMULATIVE 1

2 3

4 5

DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS 860 838 744.0 744.0 0.0 626,628 5,805.2 5,783.3 0.0 171876.5 169510.9 0.0 6

NET ELECTRICAL ENERGY GENERATED (MWH) 4,919,128 132,768,129

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE September 1, 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

August 2004 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(I) Reason:

A-EOUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUEUNG 0-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERARONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)