3F0893-12, Specific Procedure for Seismic Verification of Nuclear Plant Equipment, Rev 0
(Redirected from 3F0893-12)
Jump to navigation
Jump to search
| ML20056G800 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/17/1993 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20056G795 | List: |
| References | |
| 3F0893-12, 3F893-12, PROC-930817, NUDOCS 9309070183 | |
| Download: ML20056G800 (300) | |