3F0888-15, Forwards Rev 4 to Fire Protection Plan

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to Fire Protection Plan
ML20153G159
Person / Time
Site: Crystal River 
Issue date: 08/26/1988
From: Widell R
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20153G162 List:
References
3F0888-15, 3F888-15, NUDOCS 8809080056
Download: ML20153G159 (1)


Text

-

1

..e.**

Or g.

$; d' f 0' f

o o n efo o.e f.e. O e

Florida Power C O R P O R A 'l 1 O N August 26, 1988 3F0888-15 Document Control Desk U.S. Nuclear Rogulatory t h innion Washington, CC 20555

SUBJECT:

Crystal River Unit 3 Docket No. 50-302 Operating Li nse No. DPR-72 Fire Protection Plan

Dear Sir:

Please fiIrl attached Revision 4 of the Crystal River Unit 3 Fire Protection Plan.

'Ihis revision to the Fire Protection Plan is being subnitted in accordance with Section 1.5.5 of the Plan and as follow up to Florida Power Cbrporation corresporrience, dated July 27, 1988.

If you have any questions, please contact this office.

Sincerely, Rol C. Widell, Director Nuclear Operations Site Support RCW:DUI Attachment xc: Regiorul Administrator, Rcgion II 1

Senior Resident Inspector 8809080056 080826 goo $

PDR ADOCK 05000302 a

F FDC l

I l

Post Office Box 219

  • Telephone (904) 795-3802 A Flonda Progress Corr)any