3F0803-01, July 2003 Monthly Operating Report for Crystal River, Unit 3
| ML032260678 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/06/2003 |
| From: | Franke J Progress Energy Florida |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0803-01 | |
| Download: ML032260678 (3) | |
Text
-@,Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 6, 2003 3F0803-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) July 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely, A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE August 1. 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
July 2003 No.
Date Type Duration Reason Method of Cause I Corrective Actions F: Forced (Hours)
(1)
Shutting l_______
S: Scheduled
___Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (Explan)
B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINGt I LICENSE EXAMINATION F-ADMINISTRATiVE 0-OPERATIONAL ERROR (Exp6Imn)
H-OTHER (Explain)
(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE August 1. 2003 WgA COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):
July 2003 MONTH YEAR TO DATE CUMULATIVE 2
2 DESIGN ELECTRICAL RATING (MWe-Net)
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 860 834 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0
- 0.0 626,598 5,087.0
- 5,087.0 0.0 4,314,808 163,202 160,902 0
125,584,379