July 2003 Monthly Operating Report for Crystal River, Unit 3
ML032260678
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/06/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0803-01
Download: ML032260678 (3)


Text

-@,Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 6, 2003 3F0803-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) July 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE August 1. 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

July 2003 No.

Date Type Duration Reason Method of Cause I Corrective Actions F: Forced (Hours)

(1)

Shutting l_______

S: Scheduled

___Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Explan)

B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINGt I LICENSE EXAMINATION F-ADMINISTRATiVE 0-OPERATIONAL ERROR (Exp6Imn)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE August 1. 2003 WgA COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):

July 2003 MONTH YEAR TO DATE CUMULATIVE 2

2 DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 860 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0

- 0.0 626,598 5,087.0

- 5,087.0 0.0 4,314,808 163,202 160,902 0

125,584,379