July 2002 Monthly Operating Report for Crystal River Unit 3
ML022270642
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/08/2002
From: Franke J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0802-02
Download: ML022270642 (3)


Text

j Florida Power Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 8, 2002 3F0802-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) July 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, J. A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager

,,:-,~-
w.
  • ,,, ' "/

t jt

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD (Month/Year):

50-302 FLCRP-3 August 1, 2002 J. E. Lane Q

(352) 7 9 5-6 4h6 x3698 July 2002 MONTH YEAR TO DATE DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 1 2

3 4

5 6

825 834 CUMULATIVE 744.0 744.0 0.0 622,390 5,068.0 5,060.4 0.0 4,264,951 154,475 152,183 0

118,234,214

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE August 1, 2002 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

July 2002 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated at full power for the entire month.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION

&-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method I-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION S-OTHER (Explain)