3F0795-11, Forwards Revs 6-8 to Physical Security Plan.Revs Withheld, Per 10CFR73.21

From kanterella
Jump to navigation Jump to search
Forwards Revs 6-8 to Physical Security Plan.Revs Withheld, Per 10CFR73.21
ML20086G910
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/05/1995
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0795-11, 3F795-11, NUDOCS 9507170269
Download: ML20086G910 (1)


Text

_

SAFEGUARDS INFORMATION 9

Florida Power CORPORATION OYE July 5, 1995 3F0795-11 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Physical Security Plan, Revision 6-8

Dear Sir:

Pursuant to the provisions of 10 CFR 50.54(p), Florida Power Corporation (FPC) is hereby submitting Revision 6-8 to the Physical Security Plan. These changes do not decrease the safeguards effectiveness of the Plan or its implementation.

This submittal includes a description and evaluation of the changes and the replacement pages for the Plan.

The attachment contains Safeguards Information and, as such, shall be withheld from public disclosure and protected in accordance with 10 CFR 73.21.

Sincerely, P. M. Beard, Jr.

Senior Vice President ENCLOSURE CONTAINS SAFEGUARDS Nuclear Operations INFORMATION. UPON SEPARATION THIS PAGE IS DECONTROLLED.

PMB GMu xc: Regional Administrator,' Region II Senior Resident Inspector NRR Project Manager PDR ADOCK 05000302

[$

)\\

9507170269 950705 g

F PDR i

CRYSTAL FWYER ENERGY COMPLEX e 15780 W. Power une Street

  • Crystal Ryer e Flor 6de 344254708 * (904) 7954486 A Floride Progreen Company SAFEGUARDS INFORMATION 1