3F0795-09, Forwards FPC Crystal River Unit 3 Fire Endurance Test Program Plan for Mecatiss Over Thermo-Lag (Overlay Upgrade) & Mecatiss (Stand Alone)
| ML20086E637 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/06/1995 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086E641 | List: |
| References | |
| 3F0795-09, 3F795-9, NUDOCS 9507120154 | |
| Download: ML20086E637 (2) | |
Text
(
Florida Power CORPOEMTION n=mmIN July 6, 1995 3F0795-09 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Thermo-Lag and Mecatiss Fire Endurance Tests Plan
Reference:
FPC to NRC letter, 3F0395-11, dated March 6, 1995
Dear Sir:
In the above referenced letter, Florida Power Corporation (FPC) informed the NRC of our intent to perform fire endurance tests of Thermo-Lag and Mecatiss Fire barriers.
Attachments 1 and 2 provide our Test Plan and Test Schedule, respectively.
Testing will be conducted at Underwriters Laboratory in Northbrook, Illinois.
FPC requests the NRC Staf f review the Test Plan and provide us with any comments that you may have.
You will note that we are pursuing an aggressive test schedule, and would appreciate your comments in a timely manner in order to incorporate any changes that may be necessary. FPC will be pleased to have the NRC Staff witness any aspects of our test preparation or test performance.
Please contact W. L. Rossfeld at (904) 563-4374 if you have any questions concerning this letter or the attachments.
Sincerely, P. M. Beard, Jr.
Senior Vice President Nuclear Operations PMB/SCP xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector i
CRYSTAL IWER ENERGY COMPtfX: 15760 W Power une St Crystal River, Florida 34428-6708 e (904) 7954486 9507120154 950706 h[ 8 PDR ADOCK 0500 2
s t
U. S. Nuc1 car R:gulatory Commissicn 3F0795-09 1
j ATTACHMENT 1 4
)
i i
j l
-