3F0492-06, Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted

From kanterella
(Redirected from 3F0492-06)
Jump to navigation Jump to search
Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted
ML20095A736
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/13/1992
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0492-06, 3F492-6, NUDOCS 9204200204
Download: ML20095A736 (4)


Text

4 h

ggry qu l%

1[:

v .-

w Florida Power COMFGAATION E

April 13, 1992 Crystal River Unit 3 Docket No. 50-302 3F0492-06 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

NRC letter to FpC dated February 13, 1992 Inspection Report 92-01 (3N0292-07)

Dear Sir:

On January 6 thru January 10, 1992, the NRC conducted a Motor-Operated Valve (MOV) inspection at Crystal River Unit 3 (CR-3). The inspection consisted of a review of the MOV program Florida Power Corporation (FPC) developed in response to Generic Letter 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance". Although the inspectors found that the Generic Letter 80-10 MOV program for CR-3 was generally satisfactory, there were some concerns identified. FPC has attached our response to the two concerns as requested in the subject letter.

FPC was also requested during the MOV inspection to submit an update to the

- previous MOV submittal concerning implementation and scheduling for the MOV program. FPC agrees that a revised response is warranted for the reasons C noted and in response to evolving industry MOV concerns. We have just received the draft NUMARC guidelines and are incorpcaating them as well as direct input from ITI MOVATS and our own experience into a revised program.

Further, FPC anticipates lessons learned during the upcoming Refuel 8 outage will aid us in developing such a response. Therefore, FPC will submit an updated submittal sixty days after startup from Refuel 8. As noted in the attached response to Concern 2, the scope of the program is being significantly expanded. It is therefore likely that the schedule will be affected. We will provide a new schedule in our updated submittal, b.

GENERAL OFFICE: 3201 Thirty fourth street sol th *

/ e P.O. Box 14042

  • St. Petersburg. Florida 33733 * (813) 866 5151 A Florida Progress Company 9204200204 920413 PDR ADOCK 05000302 O PDR

U. 5. Nuclear Regulatory Commission 3F0492-06 ,

Page 2 FPC notes that the inspection team and the associated report regularly refer to "the requirements of Generic Letter 89-10". -

This is inappropriate since such generic correspondence is not the proper vehicle to impose requirements.

FPC's MOV program is and remains our plan to deal with MOV issues raised by the NRC, vendor input, our experience, etc. We will continue to relate it to the suggested actions in the generic letters, NUMARC guidelines, or other

- appropriate references but we do not consider these to be requireme.its.

Sincerely,

t. t. Beard, Jr.

Senior Vice President >

Nuclear-Operations GMF: mag 1.tt .

xc: Regional Administrator, Region 11 Senior Resident Inspector NRR Project Manager

?

e

'i e- s.- .. .-..--.r.- .-.s . - - - - . _ r._ . -i..,-..---- . - - - . . - , r.--w. ~ -_.. - , -m -----.wd--.-=,-,._.._.,.--....,--o,.. . - - . - , - .- a. w -e.v.+,.

W l

FLORIDA POWER CORPORATION RESPONSE NRC INSPECTION REPORT 92-01 NOTICE OF CONCERNS CONCERN (1)

Based on the status of calculations and development of procedures, there was a concern that resource allocation might be insufficient to complete the program on-schedule. Licensee personnel indicated there were plans to increase the ,

engineering support to the program.

FLORIDA POWER CORP 0 RATION Resp 0NSE ,

FPC has dedicated resources to the Crystal River Unit 3 (CR-3) Motor Operated Valve (MOV) program during 1992 in addition to the "MOV Engineer" previously assigned to the program. The following is a listing of these additional resources.

1. A Mechanical Engineer has been assigned to support the MOV Program.

Initial responsibilities include writing Performance Test procedures for the Differential Pressure Tests. : Training in Data Acquisition, Diagnostic Equipment Usage and Signature Analysis will be accomplished  !

in 1992 to provide additional plant MOV Diagnor. tic Testing engineering

- support.

2. Various system engineers are being utilized to perform the calculations for maximum Differential Pressure (DP) determinations for the MOVs.

This is a major project (Item "A" of the Generic Letter 89-10), and is being divided.among several engineers according to their sssigned systems.

3. An Engineering Aide will provide additional administrative support for -

processing Operability Assessment and Limiter Plate Calculations.

4; A consultant from ITI M0 VATS will provide supplemental manpower to the MOV Program for 1992. This contract employee will be stationed at CR-3

~

on a full time basis during 1992.

5. The maintenance department has devoted more manpower to program implementation. The Reliability Centered Maintenance (RCM) group is now responsible for implementation of the DP tests in the field. In the future, the RCM group will be capable of performing the verification of

the signatures. These chs.ges will allow the MOV Engineer increasingly more time to address technical and programmatic issues.

6. A senior management MOV Program Oversig't Team has been established to monitor trogress and assure coordination in implementation of the program.

CONCERN (2)

A listing of valves scheduled to be design-basis tested revealed that it would be acceptable to test either valve of listed similar pairs rather than test both. This is contrary to recommended action of GL 89-10, which indicated that each valve should be tested at design-basis pressure where practicable.

This was further explained in the reply to Question 22 of GL 89-10, Supplement 1.

FLORIDA POWER CORPORATION RESPONSE FPC has evaluated our progtam and concluded that expanding the program is indeed warranted. Crystal River will DP test all MOVs which are practicable to test. Valves which can be tested in place without jeopardizing operation or availability of safety-related systems or components will be DP tested. It must be noted that this additional DP testing will nearly double the scope of work previously planned.

i I

. . . .