' Power CORPOR ATION April 7, 1989 3F0489-02 U.S.
Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Cryst.al River Unit 3 I
Docket No. 50-302 Operating License No. DPR-72 Environmental Protection Plan
Dear Sir:
Pursuant to Florida Power Corporation's Crystal River. Unit 3
l Technical Specifications, Part B,
Section 3.2, please find attached I
a copy of the final modification on Florida Power Corporation's National Pollutant Discharge Elimination System permit No.
FL0000159.
i If you have any questions, please' contact this office.
Rolf C.
Widell, Director Nuclear Operations Site Support HEF:wla Attachment xc:
Regional Administrator, Region II Senior Resident inspector 8904200192 090407 PDR ADOCK 05000302 P
PNU 8
l l POST OFFICE BOX 219
- CRYSTAL RIVEu, FLORIDA 32629-0219 * (904) 795-6486 l
1 A Florida Progress Company
l' 1
/
r a
. @ ):
l, UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
'h e REGION IV 348 COURTLAND STREET 4
ATLANTA. GEORGI A 30365 h1'g"ik SERTIFIED MAIL
' RETURN RECEIPT REOUESTED:
4 REF1 4WM-FP.
l Mr. John A. Har. cock Vice PresidPent, Fossil' Operations FloridaJPower Corporation g
- P.O. Box 14042 St. LPetersburg, Florida 33733
.RE: Final Permit Modification Issuance
. Crystal River--Powe.r Plant
- NPDES' Permit No. FL0000159 l-i
Dear Mr. Hancock:
Enclosed is
'the final modification of the National Pollutant-Discharge. Elimination System (NPDES) permit for.the above referenced
~ facility..
This-action constitutes' the Environmental Protection (Agency's " final permit decision in accordance with 40~CFR 124.15(a).-
Any' person. may contest this decision.by submitting a timely request
-l for a
hearing-to the Regional Administrator under 40 CFR 124.74'or l124.114.
Only conditions of the-permit which have changed as a cresult of this-modification may be contested.
The permit modification will be effective provided that no request
'for' ai-hearing 'is granted by the Agency. underl 40 CFR 124.75 or 124.114.
In the event'that such a request is granted, the force and
.. effects
'of any comparable provision (s) of the existing NPDES permit, as.Lwell as all uncontested provision (s) of.this permit modification,
- shall. be fully ' enforceable and effective'until the administrative
. review process is completed, as provided by CFR 124.16.and 124.60'.
- If you wish to request an evidentiary hearing under 40 CFR 124.74 or 124.114 you must submit a request (an original and t n copies) to the
- Regional Hearing Clerk 'within thirty (30) days feoa the receipt ~of this. letter.
The request will be timely if mailed by certified mail
-within the~ thirty.(30) day time period.
For the request to be valid, it-must conform to the requirements of 40 CFR 124.74.
A copy of the requirements of 40 CFR 124.74 is attached.
9 5 p\\ % [
o
F-h Information on procedures pertaining to the filing of a hearing request or other legal natters may be obtained by contacting Ms.
Jacqueline F.
- Colson, Assistant Regional-
- Counsel, at 404/347-2335.
Sincerely yours, A j)
Q ruce R.
Barrett, Director Water Management Division j
Enclosures-(3):
Hearing Request Requirements Final NPDES Permit Amendment to Fact Sheet cc Florida DER (with Final Permit & Amendment) j j
?
a
,..i-
.. wenIIN25 FCR swmuva:/PEI".
"ED0117U mumiT Evir4entiary Hearing (40 CFR 124.74)
(a) Within 30 days following service of notice of the Regional Administrator's final permit deC:Lsion under 124.15 any interected person may sut:mit a request to the Regional Administrator under paragraph (b) of this section for an evidentiary hearing to
...o r==it.or.cxmtest that.daci %. If such a regnest is autnitted ty a person other than the permittee, the person shall m4=1*=neously serve a egy.nf the.rar on the.pa=4 h.
-tb)(1)
.In accordance with 124.96, s:-
rague.sts shall state mach legal or factual question alleged to be at issue, and their relevance to the permit decision, together with a designation of the specific factual areas to be adjudicated and the hearing time estimated.to ' be necessary for adjtwh* 4 en.. Information
- supporting the request er otbcr written documents relied upon to
.x support the request shall be suinitted as required by 124.73 unless they are already part of the administrative record required by 124.18.
Note:
. 3his paragraph. allows:the.zufrission of. requests.for evidentiary hearings even though both legal and factual issues may be
,,. raised, or only legal issues may be raised.
In the latter case, because no factual issues were
- raised, the Regional Administrator would be required to deny the request.
- However, on review of the denial the Administrator is authorized by 124.91(a)(1) to review policy or legal conclusions of the Regional Administrator.
IPA is requiring an appeal to the i
Administrator even of purely legal issues involved in a permit decision to ensure that the Administrator will have an opportunity to review any penait before it will be final and subject to jnMc4=1 review.
(2) Persons requestin3.za evidentiary hearing on an tFDES permit..under this section tray also request an evidentiary hearing on a EmA or UIC pemit, PSD permits may never be made part of an evidentiary bearing c.-mar. cn%tz.?. %is request is.sutrject to all the requirements' of pe.ap-yh (b)(1) of.this.sectico and in addition will be granted only
.if:
(i) Procesidng of the RCRA or UIC permit at ir. sue was consolidated with the proces ing of the IEDES permit as provided in.124.4; (ii)
.2he standards for granting a hearing on the 1FDES permit are met; (idi) 2he resolution of the ITDES pemit issues is likely to make necessary or appropriate modification of the RCRA or DIC pemit; and O
s 4
($v)
If a PSD permit is involved, a permittee who is eligible for an evidentiary hearing under Subpart E on his or her HPDES permit requests that the formal hearing be conducted under the procedures of Subpart. F ard the Regional Administrator finds, that consolidation is unlikely to delay final permit issuance beyond the PSD one-year statutory deadline.
(c)-
2h.ese requests shall also.contain:
III ^ 'Iho name, mailing l address,*a6dstelephone 'runber tf the person
..saaking such request; (2)
A clear and co6cise factual statement of the nature and scope of the interest of the requester; (3)
'Ihe names and addresses of all persons whom the requester represents; and 4)
A statement by the requester that, upon motion of any party granted by the Presiding Officer, or upon order of the Presiding Officer sua sponte without cost or expense to any other party, the requester shall make available to appear and
. testify,"the.:following :
(i)
':he requester; (ii)
All persons represented by the requester; and (iii) All officers, directors, er:ployces, consultants, and agents of the requester and the persons represented by the requester.
(5)
Specific references to the contested permit conditions, as well as suggested revised or alternative permit conditions (including permit denials) which, in the judgement of the requester, would be required to irplement the purposes and policias of the cia.
{G)
..In.the case of. challenges to.the, application of' control or 3
treatment technologies'identifed in the statement. of basis or I
.. fact sheet,. Identification of the basis.for the objection, "and ' the " alternative' ' technologies 'or ' combination ei technologies which thedrequester believes tre necessary to meet the requirements of the GA.
(7)
Identification'of.the permit obligations that are contested or are inseverab.Le from contested conditions and should be stayed if the request is granted by reference to the particular contested conditions varranting the stay.
(8)
Hearing requests also may ask that a formal hearing be held under the procedures set forth in Subpart F.
An applicant Toy make such a request even if the proceeding does not constitute ' initial licansing" as def4.ned in 124.111.
{
2 s
.._.3_
'(d)
If the Regional Administrator grants an evidentiary hearing request in whole or in part, the Regional Administrator shall.
~ identify the permit conditions which have been contested by the requester and for which the evidentiary ~ hearing has been granted.- Permit conditions which are not contested.or for which the. Regional Administrator, has denied the hearing request shall ret be affected by, or considered at, the
. evidentiary hearing.
7he Regional Administrator shall
. specify.these M4 H e.s _in writing. in. accordance with 324.60(c).
.;te)-
h.'Regicnal' Administrator.. sust grant.ar : deny al.1.wis
,, e
. for an evDW 4 = 7 bearirr3 on a partienlar.. permit.. - All requests that are granted for a particular permit shall be combined in a single evidentiary hearing.
if).._The Regional Mministrator (upon notice to all persons who
" have.altamiy puWtted hearing requests) may extend the time allowed for submitting hearing-requests under this section for good cause.
l l
~
l i
e i
9 I
e
Permit No. FL0000159-
,.. [*%
Major non-POIW
- J-h.j.
I UNITED STATES ENVIRONMENTAL PROTECTION AGENCY b,g-REGION IV F
4 345 COURTLAND STREET ATLANTA. GEORGI A 30385 AUTHORIZATION 'IO DISCHARGE UNDER THE NATICNAL POLLUIANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the Clean Water Act, as' amended '(33 U.S.C. 1251 et. seq; the "Act"),
Florida' Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733 is authorized to discharge frcm a facility located at Crystal River Power Plant Units 1, 2, and 3 Citrus County,-Florida to receiving waters named Gulf of Mexico frcm discharge points enumerated herein as serial numbers 001, 002, 003, 004, 005, 006, 007, 008, 009, 010A,10B, 011, 012, 013, and 014.(or 14A and 14B) in accordance with effluent limitations, monitoring requirements and other conditions set forth herein. 'Ihe permit consists of this cover steet, Part I: 12 pages, Part II: 15 pages, Part III: 4 pages, Part IV: 2 pages, and Attachments: 2.
.This permit became effective on October 1, 1988.
This Modification shall beccme effective on April 1,1989.
The implementation schedule for cooling tower construction was extended.
The nodified page, Page I-ll, is attached.
This permit and the authorization to discharge shall expire at midnight, September 30, 1993.
September 1, 1988 Date Issued March 16, 1989
['
4 41.
, Date Nodified pruce R. Barrett!, Director Water Management Division
_ _ _ _ _ - _ _ _ _ _ = _ _ _ _ _ -
[gg (Signeds b
PART I 2'
i'
/
Paga I-ll Modification date:
Permit No. FL0000159 BJ SCHEIXJLE OF CCMPLIANCE 1.' The permittee shall achieve ccrupliance_ with, the effluent limitations L
specified for discharges in accordance with the following schedule:
' a. Effluent Flow Reduction (001 and 002)
- 1. Progress report 02/28/89-
- 2. Progress report 08/31/89
- 3. Progress report -
02/28/90
- 4. Installation completed 08/31/90
- b. Hatchery (Part III.K)
- 1. Submit'necessary permit applications
- - 02/28/89
- 2. Start construction 08/31/89
- 3. Initial plan and budg'et -
11/30/S9
- 4. Progress report 12/31/89
- 5. Implement operation 03/31/90
- 6. Subsequent annual plan and budget ll/30/XX
- 6. First annual report
- - - 03/31/91
- 7. Subsequent Annual Reports 03/31/XX
- c. Helper Cooling Towers (001, 002, and 005 and Part III.L)
- 1. Submit complete PSD application 05/31/89 1
- 2. Start construction and progress report -
- 10/01/89
- 3. Progress report -
- 03/31/90-
- 3. Progress report -
- 09/30/90
- 03/31/91
- 4. Progress report -
- 08/31/91
- 5. Implement operation -
- d. Condenser Cooling Water F. low Verification (Part III.M)
- *02/28/92
- 1. Report
- e. Discharge Temperature Monitcring (Part III.N)
- 08/31/91 1.. Start field surveys
- 02/28/92
- 2. Submit report
- 3. Implement changes, existing eqpt. (if required)
- 05/31/92
- 4. Implement changes, new eqpt. (if required)
- 02/28/93
- f. Seagrass Monitoring and Planting (Part III.0)
Fall 1991
- 1. Biological survey -
- 2. Biological survey Fall 1993
- 3. Submit report -
11/30/93 ITEMS 4 - 23 ARE APPLICABLE ONLY IF NEEDED, BASED ON RESULTS OF THE ABOVE REPORP
'AND MAY BE TERMINATED ON PERMITTING AUTHORITY APPROVAL IF/WHEN SUBSEQUENT DATA I
INDICATES THAT NO FURTHER ACTION IS REQUIRED.
- 4. Sprig planting
- - 04/01/94 l
- 5. Biological survey Fall 1995
- 6. Submit annual report -
- 11/30/95
- These dates anticipate timely application by the permittee for all other required permits, e.g., State and Federal dredge and fill permits. Should circumstances-beyond the control of the permittee occur, or should the required permits not be timely issued, the permittee can request a modification to this schedule.
. _ - _ - - - _ _ _ - _ _ _ - _ _ _ _ _ - _ _ _