3F0397-36, Submits Sys Readiness Review Plan & Schedule for Phase 1 of Review Inadvertantly Omitted from Providing Info on Executive Summary of Plan
| ML20137J363 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/31/1997 |
| From: | Kunsemiller D FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137J365 | List: |
| References | |
| 3F0397-36, 3F397-36, NUDOCS 9704030278 | |
| Download: ML20137J363 (2) | |
Text
,c^^g
/
m Q?b i
11 Qfh Florida Power CORPORATION omane mace March 31, 1997 l
3F0397-36 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 j
Subject:
System Readiness Review Plan
References:
FPC to NRC letter 3F0397-19, dated March 27, 1997
Dear Sir:
FPC submitted information on the System Readiness Review being performed at Crystal River Unit 3 in the above referenced letter.
The referenced letter
~
forwarded an Executive Summary of the System Readiness Review Plan (SRRP).
It was intended to include a copy of the SRRP and schedule for Phase 1 of the review, however, those were inadvertently omitted from the packages sent out.
The missing Attachments 2 and 3 are enclosed. Please combine these attachments with the original letter 3F0397-19.
Should you have any questions or require additional information, please contact Brian Gutherman at (352) 563-4566.
Sincerely, Luflc David F. Kunsemiller, Director Nuclear Site Support 030066 f0D/'f Enclosures xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager CRYSTAL FUVER ENERGY COMPLEX: 15760 W Power une St. Crystal River, Florida 344284708 e (35:5 795 4486 A Florida Progress Corrpany 9704030278 970331 PDR ADOCK 05000302' P
PDR ggggggg[g
--._.~,
r i
1 I
FPC - CR3 System Reaciness Review C
Phase :
l l
I, r
i i
)
, Februa ry alarch A p ril hl.,
June J uly A ugust Septem b e s; October i
i a
e i
i a
a a
i i
Level I System Reviews Le vel 2 System Reviews Level 3 System Reviews l
GROUP I Systems I
Level 3 System Reviews l
GROUP 2 Systems f
Level 3 System Reviews l
GRO UP 3 Systems I
j GitOUP 1 Systems - Potential to impact EDG/EFW Dependency G ROllP 2 System s - Potential for discovery of DH or I.fi issue
)
i G ROUP 3 System s. Rem aining System s i