3F0396-23, Submits Summary of Nuclear Property Insurance for Unit 3,per 10CFR50.54(w)(3)

From kanterella
(Redirected from 3F0396-23)
Jump to navigation Jump to search
Submits Summary of Nuclear Property Insurance for Unit 3,per 10CFR50.54(w)(3)
ML20101M827
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/29/1996
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0396-23, 3F396-23, NUDOCS 9604080107
Download: ML20101M827 (2)


Text

_

c Florida Power CORPORATION No 50 302 l

March 29, 1996 3F0396-23 U. S. Nuclear Regulatory Commission Attn:

Dcocument Control Desk Washington, D. C.

20555

Subject:

Nuclear On-Site Property Insurance

Dear Sir:

Florida Power Corporation hereby submits a summary of nuclear property insurance for Crystal River Unit 3.

This report is submitted in accordance with 10 CFR 50.54(w)(3).

Sincerely, G. L. B ldt Vice President Nuclear Production Attachment GLB/ff xc: Regional Administrator, Region II Senior Resident inspector Project Manager 9604080107 960329

~

PDR ADOCK 05000302 J

pDn CRYSTAL FUVER ENERGY COMPLEX.15760 W. Power une Street. Crystal River. Florida 34428 4708. (352) 7 5 6486 A Florida Progress Company pW i

l FLORIDA POWER CORPORATION NUCLEAR PROPERTY INSURANCE FOR CRYSTAL RIVER UNIT NO. 3 i

IN PLACE AS OF 3/1/96 Limits are Excess Carrier Policy No.

Policy Period Limits Layer Over ANI 95147 10/09/95 -10/09/96

$ 375 ) $500 million Primary

$500,000 deductible MAELU 95147 10/09/95 -10/09/96

$ 125 )

NEIL ll X95-015 11/15/95 -11/15/96

$1,400 million Excess #1 Primary layer NEIL 111 UX95-015 11/15/95 -11/15/96

$ 200 million Excess #2 Excess layer #1 TOTAL

$2,100 million RISK MANAGEMENTfjl arm 96 KEEP 1:NUCPROP.XLS

-