3F0396-23, Submits Summary of Nuclear Property Insurance for Unit 3,per 10CFR50.54(w)(3)
| ML20101M827 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/29/1996 |
| From: | Boldt G FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F0396-23, 3F396-23, NUDOCS 9604080107 | |
| Download: ML20101M827 (2) | |
Text
_
c Florida Power CORPORATION No 50 302 l
March 29, 1996 3F0396-23 U. S. Nuclear Regulatory Commission Attn:
Dcocument Control Desk Washington, D. C.
20555
Subject:
Nuclear On-Site Property Insurance
Dear Sir:
Florida Power Corporation hereby submits a summary of nuclear property insurance for Crystal River Unit 3.
This report is submitted in accordance with 10 CFR 50.54(w)(3).
Sincerely, G. L. B ldt Vice President Nuclear Production Attachment GLB/ff xc: Regional Administrator, Region II Senior Resident inspector Project Manager 9604080107 960329
~
PDR ADOCK 05000302 J
pDn CRYSTAL FUVER ENERGY COMPLEX.15760 W. Power une Street. Crystal River. Florida 34428 4708. (352) 7 5 6486 A Florida Progress Company pW i
l FLORIDA POWER CORPORATION NUCLEAR PROPERTY INSURANCE FOR CRYSTAL RIVER UNIT NO. 3 i
IN PLACE AS OF 3/1/96 Limits are Excess Carrier Policy No.
Policy Period Limits Layer Over ANI 95147 10/09/95 -10/09/96
$ 375 ) $500 million Primary
$500,000 deductible MAELU 95147 10/09/95 -10/09/96
$ 125 )
NEIL ll X95-015 11/15/95 -11/15/96
$1,400 million Excess #1 Primary layer NEIL 111 UX95-015 11/15/95 -11/15/96
$ 200 million Excess #2 Excess layer #1 TOTAL
$2,100 million RISK MANAGEMENTfjl arm 96 KEEP 1:NUCPROP.XLS
-