3F0304-01, February 2004 Monthly Operating Report for Crystal River Unit 3

From kanterella
(Redirected from 3F0304-01)
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Crystal River Unit 3
ML040780620
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/10/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0304-01, ITS 5.7.1.2
Download: ML040780620 (3)


Text

Cj Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 March 10, 2004 3F0304-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - February 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) February 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

HiA. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 March 1, 2004

,I J. E. Lane 9

(352) 795-6486 x3698 REPORTING PERIOD (MonthlYear):

February 2004 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 860 838 3

NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 696.0 696.0 0.0 600,830 1,440.0 1,440.0 0.0 1,242,872 167511.2 165167.6 0.0 129,091,873

)

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE March 1, 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

February 2004 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EOUIPMENT FAILURE (Explab,)

&-MAINTENANCE OR TEST C-REFUELUNG 0REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION S-OTHER (Explain)