3F0303-01, February 2003 Monthly Operating Report for Crystal River Unit 3

From kanterella
(Redirected from 3F0303-01)
Jump to navigation Jump to search
February 2003 Monthly Operating Report for Crystal River Unit 3
ML030800571
Person / Time
Site: Crystal River 
Issue date: 03/13/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0303-01
Download: ML030800571 (3)


Text

Progress Energy Docket No 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 March 13, 2003 3F0303-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) February 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

In this Monthly Operating Report, CR-3 is changing the value for Design Electrical Rating (DER) from 825MWe to 860MWe. The reason for this change is to be consistent with the other Progress Energy nuclear plants interpretation of the definition of DER given in Generic Letter 97-02. That definition is:

"The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design."

Historically, CR-3 interpreted this to mean original plant design and, therefore, has reported the value of 825MWe since 1977. The recent implementation of a small power uprate for CR-3 presented the opportunity to reconsider what CR-3 reports for DER. Based on two changes in licensed thermal power and upgrade of the low pressure turbines over plant life, CR-3 has determined the change to 860MWe is appropriate and technically justified at this time.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

J. A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W Powerline Street Crystal River, FL 34428 7

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE March 5, 2003 COMPLETED BY J E. Lane

  • t"y/f*

TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):

February 2003 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 860 2

MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 159,531 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 672.0 1,416.0 157,231 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0

6 NET ELECTRICAL ENERGY GENERATED (MWH) 574,608 1,208,705 122,478,276 Note:

On 2/4/03, the plant implemented License Amendment 205 which allowed operation up to 2568 MWt.

The plant increased power to 2568 MWt on 2/21/03. A new Design Electrical Rating (MWe-Net) of 860 MWe has been established.

1 APPENDIX B UNIT SHUTDOWNS 50-302 FLCRP-3 March 5, 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

February 2003 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)

DOCKET NO.

UNIT NAME DATE