3F0302-01, Twenty-Day Response to NRC Letter Issuance of Order for Interim Safeguards and Security Compensatory Measures
| ML020870194 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/14/2002 |
| From: | Young D Florida Power Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0302-01 | |
| Download: ML020870194 (3) | |
Text
j Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 SAFEGUARDS INFORMATION Ref: 10CFR50.4(b)(4)
March 14, 2002 3F0302-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Twenty-Day Response to NRC Letter "Issuance Of Order For Interim Safeguards And Security Compensatory Measures For Crystal River Unit 3"
Reference:
NRC to FPC letter, 3N0202-06, dated February 25, 2002
Dear Sir:
The purpose of this letter is to provide the 20-day written response required by NRC Letter "Issuance Of Order For Interim Safeguards And Security Compensatory Measures For Crystal River Unit 3," dated February 25, 2002. In the Order,Section III, B. 1, the NRC required, within 20 days, that Florida Power Corporation's (FPC) Crystal River Unit 3 (CR-3) notify the NRC:
(1) if FPC is unable to comply with any of the requirements described in Attachment 2 of the Order; (2) if compliance with any of the requirements is unnecessary in CR-3's specific circumstances; or, (3) if implementation of any of the requirements would cause FPC to be in violation of any NRC regulation or the facility license. None of the above three listed conditions applies to CR-3.
Section III, B.2, of the Order required FPC to notify the NRC within 20 days if implementation of any of the requirements in Attachment 2 would adversely impact safe operation of the facility.
Implementation of these requirements will not adversely impact safe operation of CR-3.
NOTICE: Attachment 1 to this letter (Schedule for Achieving Compliance) contains "Safeguards Information."
Upon separation from Attachment 1, this letter is "DECONTROLLED."
SAFEGUARDS INFORMATION 3
5 15760 West Power Line Street - Crystal River, Florida 34428-6708 * (352) 795-6486
U.S. Nuclear Regulatory Commission Page 2 of 3 3F0302-01 SAFEGUARDS INFORMATION Section I1, C.1, of the Order requires FPC, within 20 days, to submit to the NRC a schedule for achieving compliance with each requirement described in Attachment 2. The schedule for CR-3 is contained in Attachment 1 to this letter. to this letter contains a List of Commitments. The dates for achieving compliance with requirements not yet met are considered to be regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing & Regulatory Programs, at (352) 563-4883.
Sincerely, Dale E. Young Vice President Crystal River Nuclear Plant DEY/dwh xc:
NRR Project Manager Regional Administrator, Region II (Two copies)
Senior Resident Inspector Attachments: 1. Schedule for Achieving Compliance
- 2. List of Commitments SAFEGUARDS INFORMATION
Page 3 of 3 U.S. Nuclear Regulatory Commission 3F0302-01 SAFEGUARDS INFORMATION STATE OF FLORIDA COUNTY OF CITRUS Dale E. Young states that he is the Vice President, Crystal River Nuclear Plant for Progress Energy; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
Zr Dale E. Young Vice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this 14 th day of March, 2002, by Dale E. Young.
LiýA A. MORRIS Notary Public, State of Florida My Comm. Exp. Oct. 25, 2003 Comm. No. CC 879691 Signature of Notary Public State of Florida (Print, type, or stamp Commissioned Name of Notary Public)
Personally Known
/A Produced
-OR-Identification SAFEGUARDS INFORMATION