k Florida Power CORPORATION wave February 4, 1994 3F0294-02 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Su^oject:
Crystal River Unit 3, Fifth Containment Tendon Surveillance
Dear Sir:
Florida Power Corporation (FPC) performed the fifth Containment Tendon Surveillance from November 11, 1993 through January 4, 1994. This surveillance was performed to satisfy the requirements of Technical Specification _4.6.1.6.1.
FPC had intended to generally follow tb guidance of-Regulatory Guide 1.35, j
Revision 3, July 1990, " Inservice Inspection of Ungrouted Tendons In Prestressed Concrete Containments". This Regulatory Guide was subsequently incorporated into the CR-3 Technical Specifications by Amendment 148 (implemented January 3,'1994).
During the testing, prior to Amendment 148, all tendons tested met the acceptance criteria of the Regulatory Guide except one.
The surveillance was accepted by FPC since all tendons met the applicable Technical Specification acceptance criteria for lift-off forces in effect at the time of the testing.
f40000
's CRYSTAL RIVER ENERGY COMPLEX: 15760 W Power Line St e Crystal River, Florida 34428-6708. (904) 795-6486 9402160339 940204 II PDR ADOCK 05000302 ll #
Q PDR
l^
Il 4
m U. S. Nuclear Regulatory Commission 3 F,0294-62 Page 2 The field and laboratory tests are being analyzed.
FPC expects the evaluation will be completed by April 1994. FPC will then submit the results as well as any i
remedial action required in accordance with the Crystal River Unit 3 Containment Tendon Surveillance Program.
Sincerely, i
G. L.'Boldt Vice President l
Nuclear Production GLB/LVC:ff xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager l