Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4
ML24054A032
Person / Time
Site:  Duke Energy icon.png
Issue date: 02/23/2024
From: Reid B
ADP CR3
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
3F0224-04
Download: ML24054A032 (1)


Text

SAFEGUARDS INFORMATION A1 ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street I Crystal River, FL 34428

Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com

February 20, 2024 10 CFR 50.54(p) 3F0224-04 U.S. Nuclear Regulatory Commission _5i;J,.3DZ Attn: Document Control Desk ;Z-- /D35 Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision4

Dear Sir or Madrun:

In accordance with 10 CFR 50.54(p), ADP CR3, LLC (ADP CR3) hereby submits the Crystal River Unit 3 (CR-3) Independent Spent Fuel Storage Installation (ISFSI) Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4.

The change to the Plan was performed in order to comply with new rule 10 CFR 73, Enhanced Weapons, Firearms Background Checks, and Security Event Notifications effective April 13, 2023. CR-3 was compliant with this final rule by the required compliance date of January 8, 2024.

Other changes to the Plan are editorial or provide clarification.

An evaluation of the plan revision, in accordance with 10 CFR 50.54(p)(2), has determined that the incorporated changes do not reduce the effectiveness of the plan and that the plan continues to meet the standards of 10 CFR 72.2 l 2(b )(9).

This letter includes two enclosures. Enclosure 1 is Security-Related Information and contains a Summary Description of Changes. Enclosure 2 is Safeguards Information as defined in 10 CFR 73.2 and contains a copy of the CR-3 ISFSI Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4.

No new regulatory commitments have been made in this letter.

If you have any questions regarding this submittal, please contact Mr. Craig Miller, ISFSI Licensing Manager, at (352) 634-3954. ~t;D)

µ1--1~5 zlp

NOTE: ENCLOSURE 1 TO THIS LETTER CONTAINS "SECURITY-RELATED INFORMATION" AND ,Jf!..P-ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION".

THIS INFORMATION MUST BE PROTECTED ACCORDINGLY. N l-155 UPON SEPARATION OF THESE ENCLOSURES, THIS LETTER IS DECONTROLLED.

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION A1 ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street I Crystal River, FL 34428

Sincerely,

BRlclm

Enclosures:

2. CR-3 ISFSI Security Plan, Security Training and Qualification Plan, and Safeguards 1. Summary Description of Changes (Security-Related Information)

Contingency Plan, Revision 4 (Safeguards Information)

cc: NMSS Project Manager Regional Administrator, Region I

NOTE: ENCLOSURE 1 TO THIS LETTER CONTAINS "SECURITY-RELATED INFORMATION" AND ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION".

THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THESE ENCLOSURES, THIS LETTER IS DECONTROLLED.

SAFEGUARDS INFORMATION