3F0192-11, Rev 1 to TS Change Request 173 to License NPF-72,relocating Radiological Effluent Tech Specs to Odcm,Per Generic Ltr 89-01.ODCM & Draft Pages for Process Control Program Encl

From kanterella
Jump to navigation Jump to search
Rev 1 to TS Change Request 173 to License NPF-72,relocating Radiological Effluent Tech Specs to Odcm,Per Generic Ltr 89-01.ODCM & Draft Pages for Process Control Program Encl
ML20091M639
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/23/1992
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091M643 List:
References
3F0192-11, 3F192-11, GL-89-01, GL-89-1, NUDOCS 9201290166
Download: ML20091M639 (4)


Text

,

y

. i Si 7: M

  1. d din O(is Q b$ O R
  • l l

N Florida Power NstalN$rNit 3 Duket No,50 302 January 23, 1992 3F0192-Il U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 Technical Specification Change Request No.173, Revision 1 Relocation of RETS in accordance with Generic letter 89-01

Reference:

FPC to NRC - Letter dated September 11, 1989

Dear Sir:

Florida Power Corporation (FPC) hereby submits Technical Specification Change Request No.173, Revision 1 requesting amendment to Appendix A of Operating License DPR-72. As part of this request the following information is provided; (1) the proposed replacement pages for Appendix A, (2) a summary of changes for TSCRN 173, Rev. 1, (3) a draft Offsite Dose Calculation Manual, and (4) draft pages for the Process Control Program.

This submittal proposes the deletion of the Radiological Effluent Technical Specifications requirements from the Technical Specifications. This is proposed in accordance with the guidance p.ovided in Generic Letter 89-01, " Implementation of Programmatic Controls for Radiological Effluent Technical Specifications in the Administrative Controls Section of the Technical Specifications and Relocation of Procedural Details of RETS to the Offsite Dose Calculation Manual or to the Process Control Program". Attachment 2 provides a comparison of proposed changes to the guidance provided in Generic Letter 89-01.

IbObl$d ,

9201290166 920123 gliO l PDR ADOCK 05000302 AU g.

P PDR A Florida Progress Company

~

4

-U.'S. Nuclear Regulatory Commission 3f0192-11

-Page 2 FPC requests this amendment be implemented within 90 days after issuance to allow for procedure revisions and training.

Sincerely, rud d P. M. Beard, Jr.

Senior Vice President Nuclear Operations PMB/REF:ff Attachments xc: Regional Administrator, Region 11 Senior Resident Inspectos NRR Project Manager

UNITED STATES OF AMERICA NUCLEAp REGULATORY COMMISSION IN THE MATTER )

) DOCKET NO. 50-302 FLORIDA POWER CORPORATION )

i CERTiflCATE OF SERVICE P.M. Beard, Jr. deposes and says that the following has been served on the Designated State Representative and Chief Executive of Citrus County, Florida, by deposit in the United States mail, addressed as follows:

Chairman, Administrator, Board of County Commissioners Radiological Health Services of Citrus County Department of Health and Citrus County Courthouse Rehabilitative Services Inverness, FL 32650 1323 Winewood Blvd.

Tallahassee, FL 32301 A copy of Technical Specification Change Request No.173, Revision 1, requesting Amendment to Appendix A of Operating Licensing No. DPR-72.

FLORIDA POWER CORPORATION

, mis-rh P.y. Beard, Jr.

Senior Vice President Nuclear Operations SWORN TO AND SUBSCRIBED BEFORE ME THIS 23rd. DAY OF JANUARY, 1992.

. AL Nl opryPublic Notary Public, State of Florida at large My Commission Expires:

Notary Pubtle, state of Florida at Large J Ny Cormaisslott Dpires oec. 18,1995 Donded thru Agent's Notary Brokerage

i 0

STATE OF FLORIDA COUNTY OF CITRUS P.M. Beard, Jr. states that he is the Senior Vice President, Nuclear Operations for Florida Power Corporation; that he is authorized on the part of said company to sign and-file with the Nuclear Regulatory Conunission the information attached hereto; and that all such statements maae and matters set forth therein are true and correct to the best of his knowledge, information, and belief.  :

i f (A4h P.M.(Beard,Jr.

Senior Vice President Nuclear Operations Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 23rd day of January,1992.

t

/

Al L/)ftll 4 N ary Public c.

l Notary Public, State of Florida at Large My Commission Expires:

l I Notary Pubile, State of Florida et tarpe l My Commission Empires Dec. 18,1995 Bonded thru Agent's Notary Brokerage

_